Time Value of Money – Part II

Slides:



Advertisements
Similar presentations
Time Value of Money – Part I Economic basis to evaluate engineering projects.
Advertisements

Example 1: In the following cash flow diagram, A8=A9=A10=A11=5000, and
Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford Unversity Press, Inc.1 Engineering Economic Analysis 9th.
Chapter 3 Mathematics of Finance
Simple and Compound Interest
Present Value Essentials
1 Chapter 11 Time Value of Money Adapted from Financial Accounting 4e by Porter and Norton.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved CHAPTER3CHAPTER3 CHAPTER3CHAPTER3 The Interest Factor in Financing.
Learning Objectives Explain the mechanics of compounding, and bringing the value of money back to the present. Understand annuities. Determine the future.
TOPIC TWO: Chapter 3: Financial Mathematics By Diana Beal and Michelle Goyen.
Lecture Four Time Value of Money and Its Applications.
Chapter 03: Mortgage Loan Foundations: The Time Value of Money McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Understanding the Time Value of Money
(c) 2002 Contemporary Engineering Economics 1 Chapter 4 Time Is Money Interest: The Cost of Money Economic Equivalence Development of Interest Formulas.
Exam FM/2 Review loans/Amortization & Bonds
Lecture No.3.  Interest: The Cost of Money  Economic Equivalence  Interest Formulas – Single Cash Flows  Equal-Payment Series  Dealing with Gradient.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Present Worth I Economic basis to evaluate engineering projects.
(c) 2002 Contemporary Engineering Economics
Chapter 3 - Interest and Equivalence Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation.
(c) 2002 Contemporary Engineering Economics
Interest Formulas (Gradient Series) Lecture No.6 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
7-8 simple and compound interest
Topic 9 Time Value of Money.
Decision Making in Finance: Future Value of an Investment
Copyright © 2011 Pearson Prentice Hall. All rights reserved. The Time Value of Money: Annuities and Other Topics Chapter 6.
Time Value of Money by Binam Ghimire
Simple and Compound Interest Lesson REVIEW: Formula for exponential growth or decay Initial amount Rate of growth or decay Number of times growth.
TIME VALUE OF MONEY CHAPTER 5.
Summer Time Value of Money Session 2 07/02/2015.
ENGR 112 Economic Analysis. Engineering Economic Analysis Evaluates the monetary aspects of the products, projects, and processes that engineers design.
The Time Value of Money, An Overview Prof. Alley Butler Chapter 4 Part 1.
THE TIME VALUE OF MONEY TVOM is considered the most Important concept in finance because we use it in nearly every financial decision.
Exam FM/2 Review loans/Amortization & Bonds
Example [1] Time Value of Money
Contemporary Engineering Economics
THE TIME VALUE OF MONEY TVOM is considered the most Important concept in finance because we use it in nearly every financial decision.
Engineering Orientation Engineering Economics. Value and Interest The value of a dollar given to you today is of greater value than that of a dollar given.
Chapter 4: The Time Value of Money
NPV and the Time Value of Money
Engineering Economic Analysis Canadian Edition
ENGINEERING ECONOMICS Lecture # 2 Time value of money Interest Present and Future Value Cash Flow Cash Flow Diagrams.
Engineering Orientation Engineering Economics. Value and Interest Cost of Money Simple and Compound Interest Cash Flow Diagrams Cash Flow Patterns Equivalence.
Economics of Engineering Day 2. ~step/class_material.
ENGR 112 Economic Analysis II. Engineering Economic Analysis Time Value of Money $1 today is more valuable than $1 a year later Engineering economy adjusts.
Engineering Orientation
Engineering Economic Analysis Canadian Edition Chapter 3: Interest and Equivalence.
ISU CCEE CE 203 EEA Chap 3 Interest and Equivalence.
The Time value of Money Time Value of Money is the term used to describe today’s value of a specified amount of money to be receive at a certain time in.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Interest Formulas – Equal Payment.
Chapter 3 Interest and Equivalence Copyright Oxford University Press 2009.
1 Engineering Economics.  Money has a time value because it can earn more money over time (earning power).  Money has a time value because its purchasing.
Example 1: Because of general price inflation in the economy, the purchasing power of the Turkish Lira shrinks with the passage of time. If the general.
Economic Equivalence Lecture No.3 Chapter 2 Fundamentals of Engineering Economics Copyright © 2008.
Simple and Compound Interest Simple Interest I = Prt Compound Interest A = P(1 + r)
(c) 2002 Contemporary Engineering Economics 1. Engineers must work within the realm of economics and justification of engineering projectsEngineers must.
Faculty of Applied Engineering and Urban Planning Civil Engineering Department Engineering Economy Lecture 1 Week 1 2 nd Semester 20015/2016 Chapter 3.
Responsibilities and Costs of Credit
Lecturer Week 4-5 Dr. Syed Faiz Ahmed Engineering Economics.
1 Engineering Economics Engineering Economy It deals with the concepts and techniques of analysis useful in evaluating the worth of systems,
Time Value of Money Chapter 5  Future Value  Present Value  Annuities  Rates of Return  Amortization.
Engineering Orientation Engineering Economics. Value and Interest Cost of Money Simple and Compound Interest Cash Flow Diagrams Cash Flow Patterns Equivalence.
Contemporary Engineering Economics, 4th edition ©2007
Equivalence Calculations with Continuous Payments
Equivalence Calculations with Continuous Payments
Interest Formulas – Equal Payment Series
Chapter 2 Time Value of Money
Engineering Economic Analysis
ENGINEERING ECONOMICS
Presentation transcript:

Time Value of Money – Part II Economic basis to evaluate engineering projects

Time Management The expected time to deliver this module is 50 minutes. 20 minutes are reserved for team practices and exercises and 30 minutes for lecture.

Learning Objective After this class the students should be able to: Describe the concept of equivalence as applied to cash flow diagrams; Understand the difference between Compound and Simple interest Define Present Value Define Future Value

Warm-up (Reflection) If the monthly inflation rate expected for this year is 0.5%. Which will be annual inflation rate expected? Each team is invited to answer this question and list the reasons that justify their respective answers.(5 minutes)

Warm-up (Refletion) If $100 is deposited in a saving account that pays 5% annual interest, what amount has accumulated by the end of the eight year? Each team is invited to answer this question and list the reasons that justify their respective answers.(5 minutes)

Simple vs. Compound interest engineering economy use Compound interest. Terminology: i: interest rate per year N: number of years P: initial deposit, or Present Value F: future value after N years

Simple interest With simple interest, the interest calculated for years 2, 3,... is based on the initial deposit. There is no interest computed on the accrued interest. F = P(1+ Ni)

Compound Interest The standard assumption is that interest is computed on the current balance which includes accrued interest that has not yet been paid. F = P(1 + i)N

Simple and Compound interest Figure 1

Simple and Compound interest Table 2

Simple and Compound interest The graph (figure 1 e table 2) illustrates the difference between simple and compound interest. This difference increases as the interest rate and/or the number of years increases I if simple interest were used, it would result in a linear increase in the amount in the bank. While, if Compound interest is used it would result in a exponential increase.

Purchasing an Equipment Ernie's Earthmoving is considering the purchase of a piece of heavy equipment. What is the cash flow diagram if the following cash flows are anticipated? (each team has 5 minutes)

Purchasing an equipment cash flow diagram Figure 4

Leasing Equipment Rather than purchasing the heavy equipment, Ernie's Earthmoving is planning on leasing it. The lease payments will be $25K per year. What is the cash flow diagram? (each team has 5 minutes)

Leasing equipment cash flow diagram Figure 5

Equivalence for four loans Equivalence is adjusting for the time value of money. Equivalence means that different cash flows at different times are equal in economic value at a given interest rate. $100 at year 0 and the $127.63 at year 5 were equivalent at 5 % (see figure 1) .

Figure 6 illustrates four ways to repay an initial loan of $1000 at 10% interest over 5 years. The business loan, bond, and consumer loan patterns are labeled according to their typical use. The constant principal payment pattern is rarely used, because the early payments are more burdensome than in the other patterns.

Cash flow for four loans Figure 6

Equivalent Present Value. The compound interest formula F = P(I + i)N, can be applied to each loan payment. The payment occurs later so it is the F, Future Value This P is calculated for each payment by dividing F by (I + i). This P is the amount of initial borrowing that could be repaid by that F.

The final column, Present worth, or PV, is the amount of initial borrowing that could be repaid by each payment. Each present worth amount is equivalent at 10% to a payment. Each equivalent amount is called a present worth, because each is at the initial point of the loan, or time 0. If the present worths of all of the payments are summed, the total is $ 1000, which was the initial loan amount.

Payments to repay $1000 at 10% Present worth for consumer loan

Exercises (10 minutes) Draw the cash flow diagram if Strong Metalworking borrows $100,000, to be repaid in 5 years. The interest rate is 11%, and no payments are made before the end of year 5. Compute the present worth of the principal and interest payments at an interest rate of a. 7%. (Answer: ‑$120AK) b. 11%. c. 15%.

Exercises (10 minutes) Draw the cash flow diagram if Strong Metalworking issues a $100,000 bond that pays 11% annual interest. The bond is repaid in 5 years. Compute the present worth of the principal and interest payments at an interest rate of a. 7%. (Answer: ‑$116.4K) b. 11%. c. 15%.

Exercises (10 minutes) Draw the cash flow diagram if Strong Metalworking repays a $100,000 loan with 5 annual payments of $27,057. Construct an interest table to show that this repays the loan at an interest rate of 11%. Compute the present worth of the principal and interest payments in at an interest rate of a. 7%. (Answer: ‑$110.94K) b. 11%. c. 15%.

Reference “Engineering Economic: Appling Theory to Practice” Ted G. Eschenbach Oxford University Press 2002 Part I