GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS 4.1.9 I&T Engineer B. Grist.

Slides:



Advertisements
Similar presentations
The Gamma-Ray Large Area Space Telescope: UNDERSTANDING THE MOST POWERFUL ENERGY SOURCES IN THE UNIVERSE Anticoincidence Detector for GLAST Alexander Moiseev,
Advertisements

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 S. Ritz 1 GLAST Large Area Telescope: Instrument Design Steven M. Ritz Goddard.
GLAST LAT ProjectI&T&C Particle Beams - Pre PDR Presentation– Oct. 2, 2001 Gary Godfrey1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST June 8, 2000, P. Roger Williamson, BFP - 1 Balloon Flight Planning Roger Williamson June 8, 2000.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Gary.
GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 1 Introduction to Instrument Workshop 6 Eduardo do Couto e Silva Feb 27, 2006.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
T. BurnettGeant Workshop user presentation 1 Geant4 and GLAST Description of the mission and instrument Simulation requirements How we are a little.
GLAST LAT Project Collaboration Meeting 8/30/ Beam Test Plan - SLAC End Station A Secondary Beams Gary Godfrey August 30, 2005 GLAST Collaboration.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST Simulations Theodore E. Hierath Louisiana State University August 20, 2001.
30 Ge & Si Crystals Arranged in verticals stacks of 6 called “towers” Shielding composed of lead, poly, and a muon veto not described. 7.6 cm diameter.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 8 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
1 1.  - ray production by the reactions Li(p,  )Be and B(p,  )C tested at the Legnaro INFN Laboratory 2.Monte Carlo simulation of point-like Americium.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
T. Burnett1 GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 9, 2002 SAS Software: Sources Detector geometry model Simulation Event.
Gus Sinnis Asilomar Meeting 11/16/2003 The Next Generation All-Sky VHE Gamma-Ray Telescope.
GLAST's GBM Burst Trigger D. Band (GSFC), M. Briggs (NSSTC), V. Connaughton (NSSTC), M. Kippen (LANL), R. Preece (NSSTC) The Mission The Gamma-ray Large.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
Gamma-ray Large Area Space Telescope 15th INTERNATIONAL WORKSHOP ON VERTEX DETECTORS September , 2006 Perugia, Italy GLAST Silicon Tracker beam.
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
Abstract Several models of elementary particle physics beyond the Standard Model, predict the existence of neutral particles that can decay in jets of.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom1 Elliott Bloom Integration and Test and Calibration Manager
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
1 Study of Data from the GLAST Balloon Prototype Based on a Geant4 Simulator Tsunefumi Mizuno February 22, Geant4 Work Shop The GLAST Satellite.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 1 I & T Responsibility LAT I&T, Verification, and Calibration Flow VibeRandom vibrate/sine.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/ Particle Test 1 GLAST Large Area Telescope: Particle Test “Roadmap to Integration”
Report of GLAST Balloon Flight October Annual meeting of Astronomical Society of Japan T. Mizuno and other GLAST Balloon Team
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
I&T&C Organization Chart
Gamma-ray Large Area Space Telescope ACD Final Performance
GLAST LAT tracker signal simulation and trigger timing study
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope:
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope Instrument Science Operations Center
Integration and Test Organization Chart
Integration and Test Organization Chart
Imaging crystals with TKR
ACD Subsystem ACD segmentation and the
Mini Tower Preliminary Results
Integration and Test Organization Chart
Introduction and Overview
Integration & Test Instrument Operations Coordination
Analysis of GLAST Balloon Experiment Data
Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.
Presentation transcript:

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS Reliability & QA D. Marsh WBS Environmental Test Manager M. Lovellette Online Manager R. Claus Science Verification, Analysis, and Calibration E. do Couto e Silva Particle Test Manager G. Godfrey Integration, Facilities, Configuration, and Test L. Wai Instrument Operations Coordinator S. Williams Mechanical Ground Support Equipment TBD I&T Preparation EM1 Model I&T&C Calibration Unit I&T Flight LAT I&T Mission I&T Support I&T Preparation EM1 Model I&T&C Calibration Unit I&T Flight LAT I&T Mission I&T Support I&T Preparation Flight LAT I&T Mission I&T Support I&T Preparation EM1 Model I&T&C Calibration Unit I&T Flight LAT I&T Mission I&T Support

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey2 Verification Matrix Requirements flow down from –LAT Science Requirements Document – Level II Specification LAT-SS (found in LAT-SS-9.1) –Summarized by the Instrument Scientist (Steve Ritz)

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey3 What Calibration Means Low level calibration –Parameters are directly calculated from the data ADC chan / MeV response of each CsI crystal Which strips are dead in the tracker Timing accuracy Calibrate the GLAST Monte Carlo Simulation –Record LAT data for many particle types (e,p,  ), energies (20 MeV to 300 Gev), angles of incidence (θ,φ), and positions (x,y,z) of entry. –Compare data to simulated events and modify simulation if needed. Demonstrate compliance with the higher level science requirements using the calibrated simulation Effective area as a function of energy. Point spread function versus energy and zenith angle.

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey4 Particle Beam Sources Cosmics rays on the ground –All individual towers and the full LAT Van de Graff (17.6 MeV  ) –EM tower + 4 towers of calib unit + only known energy  into full LAT SLAC End Station A positrons (6 days) (1-45 GeV) –Four tower calibration unit –Calibrate energy response SLAC End Station A photons (15 days) –Four tower calibration unit –Verify MC simulation to measure PSFs and effective areas SLAC End Station A protons (30 days) –Four tower calibration unit –Verify MC simulation to measure proton rejection Cosmic rays in airplane (25, ,000 feet) (few hours) –Full LAT –End-to-end test (e.g. verify DAQ and software filtering ability to handle orbital rates).

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey5 Ground Cosmics Each tower as it becomes available at SLAC –~10 6 ~20 Hz x 1 day (use 3 in-a-row tracker trigger) –Natural cosmic solid angle distribution. No muon telescope. Four Tower Calibration Unit Full LAT –~10 8 ~300 Hz x 4 days (using 3 in-a-row tracker trigger) –Calibrate individual CsI xtals ADC chans/MeV Positional dependence –Calibrate tracker Dead and noisy strip map Straight tracks survey relative tray and tower positions –Calibrate ACD ADC chans / MeV Calibrate discriminator thresholds Efficiency vs position –Trigger and DAQ Search for problems Efficiency vs position

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey6 Van de Graff (450 keV) P + Li 7  Be 8 (1+)*  Be 8 +  (17.6 MeV) (~1 Hz into 2  sr) EM tower and qualification towers –Calibrate energy response and resolution –10 4 Hz x 1day Full LAT –Only known energy  the full LAT DAQ will see before orbit Xtal Ball spectrum. Sum of 37 NaI xtals. ~1800  in the 17.6 MeV peak. It’s 7% FWHM is due to the resolution of the detector. The bump at ~12 MeV is due to a broad excited state.

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey7 Measurement Strategy First, calibrate Four Tower Calibration Unit energy response –1–45 Gev e+ with variety of x,y,θ (6 days) (small extrapolation to  with MC) –.1,.2,.5, 1, 2, 5, 10, 30 Coherent brems  peaks, norm incidence ( 3 days) –20 and 50 MeV channeling radiation  peaks, norm incidence (2 days) –17.6 MeV  from Van de Graff Second, take photon data for calibrating the simulation. –Bremsstrahlung  beam at one e + energy (30 Gev) ( 10 days) –Simultaneously measures all  energies from 20 Mev to 30 GeV –Bremsstrahlung spectrum has equal numbers of  per % width energy bin. –The already energy calibrated LAT bins the photons into ±25% energy bins. –An example of bin edges= [GeV] –.017,.026,.038,.057,.086,.19,.29,.44,.65,.98, 1.5, 2.2, 3.3, 5.0, 7.4, 11, 17, 25 GeV Third, take hadron data for calibrating the simulation and measuring the pattern cut rejection factor. –~200 K /pulse x 30 Hz x 30 days x.58 accelerator efficiency –This is the number of protons we recorded in 30 days in Beamtest 99.

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey8 ESA Test Beams and GLAST Calibration Unit Beamtest Jan-Mar, 2004

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey9 Runtime Estimate: ESA Positrons

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey10 Runtime Estimate: ESA Coherent Brem Calculation (Peter Bosted) of  spectrum for four different beam energies and diamond crystal angles.

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey11 Runtime Estimate: ESA Channeling Radiation

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey12 Average number of photons / pulse =1 maximizes the Poisson probability of exactly 1 photon in the pulse, but: –Sometimes 2  /pulse (e.g.: 20 MeV MeV). PSF can’t tell which converted. –If the 980 MeV  converts we measure the correct 1 Gev PSF. –If the 20 MeV  converts we put tails on the 1 GeV PSF Calculation for 30 Gev positron beam and two #  /pulse (1 and.13) –Brems  ’s detectable 20 MeV to 30 GeV, ±25% calorimeter energy bins Therefore, trade off #  /pulse (runtime) vs. PSF pollution –Must compare data to an MC simulation that includes the Brems radiator. Brems Beam Measurements of PSF and Effective Area (Photons / Pulse vs. Photon Pollution)

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey13 Runtime Estimate: ESA Bremsstrahlung Use 30 Gev e + beam. Choose <n  to give 22% low energy  pollution for 1 Gev  bin. This is ~same pollution as in Beamtest 99.

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey14 Runtime Estimate: Protons Average of 1 particle/pulse maximizes the exactly 1 particle pulses. Beam is mostly positrons and pions protons/pulse were measured in Beamtest ’99. ~200 K protons =.0044 /pulse x 30 Hz x 30 days x.58 accelerator efficiency. Choose a variety of x,y,θ. Full proton rejection = ACD rejection x Pattern cut rejection Expect pattern cut rejection of to get full rejection of –Ignore the ACD (otherwise the scintillator will reject ~all the protons!) –Only measure the pattern cut rejection factor and validate the MC

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey15 End-to-End Test in Airplane (using Cosmic Rays) Full LAT in an airplane (during airplane ride to NRL environmental test) L1T trigger rate measured in single tower during Balloon Flight At 25,000 feet verify the flight hardware at orbital L1T rates –The BFEM was 1/25 of a full LAT. Scales by MC to ~17 x 540 = 9.2 kHz of L1T. –DAQ doesn’t crash –Software filter handles the rate and produces the expected downlink rate –Livetime is accurately measured At 35,000 feet test the flight hardware at > orbital L1T rates –~22 kHz saturates the LAT trigger –DAQ should not crash Alt [feet] L1T [Hz] Notes 025Ground 25,000540Same rate as in orbit 35,000900Airplane flight 50, Pfotzer max 127,000540~Orbital rate

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey16 EXTRA SLIDES

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey17 Verification Matrix

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey18 Verification Matrix

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey19 Verification Matrix

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey20 ESA Channeling Radiation Positron bounces back and forth between two lattice planes in a xtal. Graphs below are for 6 Gev positron beam on a 50 um thick diamond xtal  / e + in the third plot’s peak Only ~.0001  / positron pollution of peak from bremsstrahlung (if e+ channels) Possible problem: Angular divergence of secondary e + beam is larger than the channel’s acceptance. The many e + that don’t channel will just cause brems background.

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey21 ESA Channeling Radiation Measurements made at SLAC in 1979 (Ted Fieguth, etal. JETP Lett. 29, 723 (1979)) Mev 4 Gev e + Avrg 1 e + /pulse Diamond 011 plane 10 Gev e + Avrg 1 e + /pulse Diamond 011 plane.007 rad lengths (dN / dE  ) x 10 5 per e+ E  x (dN / dE  ) per e+ per rad length

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey22 Calculation That Gives the Photon Pollution Plot

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey23 LAT Shipping Box Features Capabilities already present from taking cosmics in Bldg 33. –Mechanical support points on grid –Liquid cooled heat exchangers bolted to grid radiator surfaces –Portable 1-2 Kw liquid chiller (<0° C for SLAC pre-thermal-vac tests?) –Pseudo solid state recorder on the 30 Mbit/sec data cable –Cat 5 cable to the GSE computer (=Laptop computer in plane) –LAT runs on 28vdc New shipping box features –Shock mounts to support points on grid –Box thermal insulation so elec power + chiller stabilizes temperature –MicroDAQ (3 of them) Monitors (Temp,Press,Hum,3 axises accel) –Flow dry nitrogen to keep humidity low DAQ philosophy (like Balloon flight) –Turn on 28 v power and LAT comes up recording data in a preset config. –Laptop is for realtime voltage, current, environmental monitoring –Laptop is for limited “mission creep” (few commands, event display,..?) –~No new software beyond existing flight and GSE

GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey24 LAT Shipping Box Conceptual Drawing