 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.

Slides:



Advertisements
Similar presentations
Underground Storage Tanks at Duke Duke Medical Center –8 permitted USTs located on medical campus –Range in size from 2,000 gallons to 30,000 gallons Proper.
Advertisements

Airport planning.
DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
Presented by: Ronald O. Nichols LADWP General Manager
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Human- Environment Interaction North Africa and the Middle East.
Eld Polk County Southeast Regional Wellfield. Polk County, Florida  Central Florida (Landlocked)  554 Lakes  Headwaters to Multiple Rivers (Low Volume)
Hydraulic Optimization of the Northern Water Supply System Presentation by: Tom Charles, P.E., DEE Jim Kriss, P.E. Jennifer Wendrowski, E.I.T. September.
City of Dayton Water Supply and Treatment Division.
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
Presented by: Kevin J. Spencer, P.G. R.W. Harden and Associates, Inc. Benefits and Challenges of Developing Brackish Groundwater Supplies WATER Supply.
Chapter 19: Network Management Business Data Communications, 4e.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
L-THIA Long-Term Hydrologic Impact Assessment Model ….provides relative estimates of change of runoff and non point source pollutants caused due to land.
Tigard_WSP_0410. Existing System Miles of Pipe 2.Twenty One Pressure Reducing Valves (PRV) 3.Seven Pump Stations 4.Two Aquifer Storage and Recovery.
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
CE HYDRAULICS ENGINEERING
MODULE “STRATEGY DEVELOPMENT”
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Complex Network Analysis of the Washoe County Water Distribution System Presentation By: Eric Klukovich Date: 11/13/2014.
Your Water System Sources of Water reservoir underground aquifer Energy Sources pumps gravity Distribution Network of Pipes.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
2015 Needs Assessment Our Strategy for Success Scott Torpie Washington State Office of Drinking Water.
PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System.
Release Reporting. Lesson #17 - Release Reporting How Do I Know If I Have a Leak in My UST System?
Chris M. Kapheim General Manager May 5, AID Groundwater Map.
Water Treatment & Distribution System Overview.
Lecture 1 Water Distribution Systems
Water System Planning Study
Reducing the Threat of Fuel Release from the Red Hill Fuel Storage Facility A Unique Engineering Challenge.
Marina Coast Water District: A California Special District ORD COMMUNITY WATER AUGMENTATION DIRECTORS Dr. THOMAS P. MOORE President JAN SHRINER Vice President.
Water for Monterey County Regional Project Capital and O&M Cost Description 1 Lyndel Melton, P.E. RMC Water and Environment.
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
SAWS' Twin Oaks Aquifer Storage and Recovery Project SAWS' Twin Oaks Aquifer Storage and Recovery Project October Texas Innovative Water 2010 Roberto.
TACOMA WATER RESILIENCY Providing Clean, Reliable Water Now And In The Future.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Desalination Becomes A Reality In Tampa Bay Florida Jim Jensen Senior Project Manager PB Water Area Manager Parsons Brinckerhoff Quade & Douglas, Inc.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Risk management and disaster preparedness
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Proposed Retail Rate Change Effective January 1, 2008.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
Infrastructure Vulnerability Profile. Objectives: To identify key infrastructure concerns related to the pre-defined hazards and issues Identify needed.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
TOWARDS A WATER POLICY FOR AUROVILLE & TOWN PLANNING ISSUES: DECISIONS TO TAKE NOW.
The Pipeline Safety Trust “Restoring Trust In Pipeline Safety” New Orleans, LA November 2-3, 2006 Nate Muehl Damage Prevention & ROW Relations Manager.
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
Unit 8 Lesson 2 Human Impact on Water Copyright © Houghton Mifflin Harcourt Publishing Company.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
Water Supply Planning Workshop February 27, 2008 City of Hallandale Beach Commission Mayor Joy Cooper Vice Mayor Bill Julian Commissioner Keith London.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
“BACK TO BASICS” November 2, 2010 CITY BOND ELECTION Facilities & Infrastructure Municipal Court Courthouse (Proposition 401) Municipal Services Maintenance.
Infrastructure Discussion 1 Mark A. Harral and Raul Rodriquez April 19 th, 2016.
Unit 4 Lesson 1 Human Impact on Water
CHANNEL ISLANDS BEACH COMMUNITY SERVICES DISTRICT
Lecture (11): Water Distribution Systems
Electrical Distribution Design Services
Unit 4 Lesson 1 Human Impact on Water
Parkland/Brookdale Interceptor Replacement
Capital Area Council of Governments
Southwest Section AWWA 2018 – Baton Rouge, LA
City of Sunrise Wastewater Reuse Program
Presentation transcript:

 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies

 Master Plan Developed In 2006 ◦ Population/Flow Projections showed Increased Demands ◦ Major Capital Components  New RO WTP and Well field  New Booster Pump Stations  New Distribution PS/Storage  Continued R/R

Decreased demand projections:  Reduced need for added booster pump stations ◦ Property, structures, equipment and electric Changed economic conditions:  Delays construction of distribution pump stations and storage tanks

Wellfield and Aquifers - Biscayne meets all standards -Nitrate only parameter with up trend - Floridan meets standards, other than chlorides. RO system removes chlorides. Supply Protection Land management of wellfield Monitoring of ground and surface waters Action plans based on monitoring data and/or events

Transmission Main Assessment Vulnerability Assessment to determine ◦ Areas where leaks and corrosive soils occur ◦ Difficult access for repair ◦ Older sections for replacement

Pipeline Protection Cathodic Protection against corrosive environment  Steel pipe section along transmission main  Steel water storage tanks

Water Supply and Treatment Multiple Wells Multiple Treatment Units Emergency Power Generation Electric and Diesel Pumps

Water Supply and Treatment 2 MGD Emergency Seawater Desalination Stock Island(Diesel) 1 MGD Emergency Seawater Desalination Marathon (Diesel)

Transmission Pipeline Pumping Capability Four Booster Pump Stations Electric and Diesel Pumps Emergency Power Generation

Emergency Backpumping Three pumps on Stock Island Diesel/Electric Three pumps in Marathon Diesel/Electric 23 of 36 Million Gallons Storage Capacity For Backpump Operations

What Happens?

Land Based Pipe Failure

Reports To Manger of Operations: Exact Locations of Failure Needed Equipment, Supplies, and Personnel Estimates Amount of Time Required for Back Pumping and to Complete Repair Traffic Impacts

Determines: Amount of Water Stored in Affected Area Amount of Time Back Pumping Operation Possible Necessity of RO Plant(s) Operational Changes to Overall System

Occurred 11 Times In Past 5 Years In All Cases Stored Water Supply Was Sufficient Reverse Osmosis Plants Were Not Operated Confident Similar Emergency Repairs Will Have Same Success Of Timely Completion

Key Largo to Florida City Pipe Failure

Build Access Pad to Leak Site Utilizing Available Contractors Implement Water Excavation Stock Materials Needed for Repair Effect Repair Similar to Land Based

Never Been Done Availability Of Contractors Assume Up TO 4 Days To Complete Seawater ROs Only Water Supply

Mandatory Water Restrictions Needed Water Demands May Not Be Met For Days Intermittent Or Complete Shut Down Of Some Distribution Systems/Possible Container Filling Identify Possibility Of Expedited Repair Develop Emergency Plan With Monroe County

Bridge Failure

Dependent on DOT Contractor to Replace Pipe as Bridge is Replaced/Repaired Maintain Pipe Inventory for Repair Depend on RO Production for Supply

PIPE SIZEDUCTILE IRONSTEEL 36”194’40’ 30”212’769’ 24”446’516’ 18”36’61’

Repairs May Require Months To Complete Water Demands Likely Exceed Supply Barge/Ship Mounted RO Possible (Navy) Consider Long Term Pipeline Redundancy Plan Additional RO Capacity