Las Delicias, El Salvador Water Supply Project Implementation Proposal Phase I Trip Dates: May 2012 Presented to TAC: March 7, 2012.

Slides:



Advertisements
Similar presentations
Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler.
Advertisements

MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
September Wood to Warmth – Heat Networks Michael Beech TV Energy.
Las Delicias, El Salvador Water Supply Project Implementation Proposal Phase I Trip Dates: May 2012 Presented to TAC: March 6, 2012.
Fluid Mechanics.
Wastewater Collection (Sewer Alternatives). Sewer Basics Collection and transport of wastewater from each home/building to the point where treatment occurs.
DRIP DISPERSAL SYSTEMS Problems and Solutions Presented by Keith Surface.
Reducing THM via Aeration: A Case Study November 21, 2013 by Gary Williams, P.E. Jones & Henry Engineers Southeast AWWA District Meeting 1.
COLEGIO CRISTIANO AVIVANDO EL FUEGO
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
As presented by: Rodger Schuldt TCEQ Installer II License # OS19898 TCEQ Maintenance Provider License # MP00545 TCEQ Site Evaluator License # OS20270.
Potential Pathways for Coliform Contamination. Fixing Positive Coliform Results.
Cycle Stop Valves 1” through 16” 1 GPM to 10,000 GPM.
Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.
Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP Presented by Adam A. Brostow November.
BOB BROZ UNIVERSITY OF MISSOURI EXTENSION (573) ISE #78 WATER MANAGEMENT STRATEGIES FOR DROUGHT MITIGATION AND SUSTAINABLE AGRICULTURAL PRODUCTION.
Sustained Compliance for Public Water Systems, Chapter 2, Workshop Department of Environmental Conservation Drinking Water Program Anchorage, September.
Nunavut Water Board Public Meeting Water Licence Amendment Rankin Inlet 3AM-GRA-1015 January
Gravity Water Supply Design
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering AguaRed.
POTABLE WATER CVEN 451 Term Project. Demand Estimate Water Use Average Flow (GPD/Capita ) # of People ADD (GPD ) MDD^ (ADD*2.4) PHD^ (MDD*1.85) Residential.
Basic Hydraulics Irrigation.
Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP.
Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler.
SPRINGVILLE CITY WATER TANK AND WELL PROJECT WILLIAM GARNER, JEREMY FOWLER, AUSTIN JASPER The city of Springville has been experiencing a period of rapid.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Updated: 2/12/2012.
ENGINEERS WITHOUT BORDERS USA ALAMO PROFESSIONAL CHAPTER.
Hydronic Mechanical Controls
2010 Pipe Dreams Team: Ibrahim Ibrahim, Mike Johnson, Scott McCombie, Bronze Richards & Josh Schroeder.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Update: 2/2/2012.
Potential Underground Wiring Meeting with Residents Wednesday, September 15, 2010 lionsbay.ca Lower Lions Bay Water Line Replacement The Village of Lions.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2011.
EWB-MAP Water Tank Project Construction Progress June 5-12, 2012.
Wareham Fire District Water Department Glen Charlie Road Water Storage Tank Special District Meeting June 23, 2009.
Technical Review Needed Fire Flow Analysis Developer Services Summit November 16, 2010 Engineering - Asset Planning Joe Dugandzic, PE.
WESTERN CARY WATER STORAGE TANK Town of Cary Preliminary Engineering Report Progress Meeting June 8, 2015.
1 CTC 450 Review Water Quality Water Quality. 2 CTC 450 Water Distribution Systems Water Distribution Systems.
Lec.16 Underground pipeline irrigation system - structures for underground pipelines.
Project Location: El Chaguite, Yoro District, Honduras Northeastern University’s Student Chapter 1Project: El Chaguite Water System.
City of Polson April 5, 2010 PUBLIC HEARING Water System Improvements PRESENTATION ON PRELIMINARY ENGINEERING REPORT.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Water for Life Project Apatut, La Union, Philippines
Watering Options for Your Grazing System 2011 Georgia Grazing School John W. Worley.
EWB-NCSU Bolivia Water Supply Project. Why Do They Need Additional Water Supplies? School Students Add to Population Rainfall – Avg. 8.5 in/yr – 0.7 in/month.
Engineers Without Borders-USA 2009 Midwest Workshop.
LCWDBoardMtg_ pptx/1 LCWD Board Meeting January 14, Carneros Avenue, Napa Los Carneros Water District.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Las Delicias Water Supply System OPERATION AND MAINTENANCE MANUAL 1.
Engineers Without Borders-USA Mid-Atlantic Professionals Chapter Water for Life Project Apatut, La Union, Philippines Amanda Jacobs Project Lead.
CBE 150A – Transport Spring Semester 2014 Other Friction Losses Valves and Fittings.
Sizing Variable Flow Piping – An Opportunity for Reducing Energy
Las Delicias, El Salvador Water Supply Project Implementation Proposal Phase I Trip Dates: May 2012 Presented to TAC: March 7, 2012.
Drip Irrigation Systems By: Philip Hanrahan and Matt Garrity.
Hierbas Buenas Brian Bozzo Gerard Hubert Michael Newman Patrick Sweeney.
Existing System The system originally operated with everyone having 24-hour availability. The village then created a 3-day rotation which improved the.
Rural Water Projects in Guatemala Water for the Americas Agua para las Américas.
Pressure and Flow Analysis Through EPANET Open source software package for hydraulic simulation of water distribution networks Used to determine impact.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
National Diploma Mechanical and Electrical Services Construction Cold Water Supplies.
CONSTRUCTION OF A DTF DO’s and DON’Ts.
Watering Options for Your Grazing System
EXERCISES Two water reservoirs are connected by a pipe 610m of 0.3m diameter, f’=0.038 and the flow produced by the difference in water surface elevations.
Nunavut Water Board Public Hearing
Joshua Basin Water District Draft Findings & Rate Scenarios
Unit 37: Fluid containment Dr
Pinole-Hercules Water Pollution Control Plant Upgrade Project
City of Roundup, Montana
Detailed Design Review Solar Thermal Water Heater
Presentation transcript:

Las Delicias, El Salvador Water Supply Project Implementation Proposal Phase I Trip Dates: May 2012 Presented to TAC: March 7, 2012

Presentation Outline Overview of Las Delicias Community Current Water Supply System and Challenges Proposed Improvement to Water System – Phase I (May 2012) New Water Tank at Intermediate Elevation New Supply pipeline and distribution pipeline – Phase II (Fall 2012) New pump Improvements to distribution system Logistics and Implementation

Las Delicias, El Salvador Las Delicias

Las Delicias, El Salvador Community Facts – ~600 homes, 2700 residents – 15 miles NW of San Salvador – On Western Slopes of Volcan San Salvador – Homes Spread Out, but Las Delicias is Bordered by Several Similar Communities – Water Storage & Piping System installed 20 years ago With Water Delivery by Truck – Well and Pump Installed < 5 years ago – Residents are Poor (<$10/week income) – Community Well-Organized through Adesco and NGOs (FIAT & FIMRC) – Able to spend about $5 per household on water each month Project History Project FIAT and FIMRC have been active in Las Delicias for > 5 years Initial Contact with Project FIAT January 2009 Application to EWB-USA March 2009 Project Approved May 2009 Preliminary Assessment Visit July 2009 First Assessment Trip July 2010 Second Assessment Trip November 2011

Map of Las Delicias Water System DOWNHILL

Current Las Delicias Water Supply & Storage System Pump Runs 6 Hours a day 4 days/week  ~ 26 hr/wk. Pump flow rate: GPM.

260 Homes Served by Tanque 3 33 Homes Served by Tanque Homes Served by Tanque 1 DOWNHILL Map of current Las Delicias Water System from ADESCO with approx house locations indicated

Summary of Existing Water System

Challenges to Las Delicias Water Supply System High electric cost – Typical ADESCO revenue from water fee ~$2300/mo – Typical monthly cost for water system ~$2000/mo (mostly electicity ~$1500/mo) – Pumps run about 26 hr/wk – Not taking advantage of nightime off-peak rates – Power factor on pumps leads to monthly fine Inequitable water distribution – Some homes report receiving water <1x/week and low flowrates – “Valvulero” controls distribution via valves to zones (“Tramo”) throughout community – Large number of new homes at low elevation Culture of scarcity where residents hoard water when it is flowing Water Quality: – Effectiveness of in-line chlorination is not clear

Electric Bill Monthly Income for Las Delicias ADESCO Water System Expenses

Alternatives Analysis Summary Drilling another well ($3500 for hydrogeological study) Solar power for pump (eliminated due to cost >$50K) Additional tank locations (three considered – current location on public land and co-located with current tank) VFD (variable frequency drive – does not add much efficiency)

Proposed Updates to Las Delicias Water System Objectives – Utilize existing and new tank at intermediate elevation to supply water to lower half of Las Delicias – With new pump and supply line  reduced electricity costs – Improved distribution system  more equitable water supply to all homes (especially at lower elevations) Phase I (May 2012) – New Water Tank at Intermediate Elevation – New Supply pipeline and distribution pipeline Phase II (Fall 2012) – New pump – Improvements to distribution system – Improving power factor for pump via capacitors? – Enabling pumping during nighttime to take advantage of lower rates

117 Homes Served by Tanque 3 33 Homes Served by Tanque Homes Served by Tanque 1 Proposed Water Distribution System 280 Homes Served by New Tank DOWNHILL

Modified water system

Summary of potential changes in water distribution system CURRENT SYSTEM Storage – Tanque 1: 35,000 gal – Tanque 2: 11,000 gal – Tanque 3: 25,000 gal Pump supplies water to Tanques 1 & 3 at 175 gpm, ~3 days per week Spring supplies water to Tanque 2 (and other tanques) Homes serviced by Tanques PROPOSED MODIFICATION Storage – Tanque 1: 35,000 gal – Tanque 2: 11,000 gal – Tanque 3: 25,000 gal – New Tank: 28,600 gal Current 65 HP Pump supplies water to Tanques 1 & 3 at 175 gpm New pump supplies water to new tank at 175 gpm with much lower head Homes serviced by Tanques New: 280 New tank reduces demand of water from Tanques 1&2 (which require high head) by roughly 50%

Map of Current Water System (section relevant for EWB-MAP modifications) RED lines – supply lines to tank (uphill by pump) BLUE lines – distributions lines by gravity DOWNHILL Exisiting 11,000 gallon tank

Proposed update to Water System (section relevant for EWB-MAP modifications) RED lines – supply lines to tank (uphill by pump) BLUE lines – distributions lines by gravity NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2c NEW DISTRIBUTION LINE 2a NEW DISTRIBUTION LINE 2b NEW TANK A B C D E F DOWNHILL

New Tank Design – Location and Coupling with Old Tank

Design of New Tank – 3D view of Block/Rebar construction

Tank Design response to J. Knight concerns Concrete block vs poured concrete. Block recommended by Daniel Rivera. Assumed strength of concrete ( psi acceptable) Tank seal at base of wall

Proposed update to Water System (section relevant for EWB-MAP modifications) RED lines – supply lines to tank (uphill by pump) BLUE lines – distributions lines by gravity NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2c NEW DISTRIBUTION LINE 2a NEW DISTRIBUTION LINE 2b NEW TANK A B C D E F DOWNHILL Design of Additional Pipelines for - supplying water to tank - distributing water

A B C 105 m 240 m D 638 m 640 m 643 m 651 m Elevation: 640 m 655 m Supply Pipe 1 Pipe Profile NEW TANK Tee connect to 6” pipe Gate Valve 45° Elbow 90° Elbow with anchor Gate Valve 90° Elbow Pipe Exit PIPE FITTINGS Tee with Manual Air release valve Tee with Manual drain valve Road Crossing

Estimate of head losses in supply pipe 1 (smooth PVC) 4” PVC sufficient to keep major and minor losses to <10% of the elevation change

Supply Pipe 1 Trenching Based on recommendations from EWB Water Resource Guidelines and advice from Tony Sauder: – 70 cm trench depth (45 cm depth acceptable except in road crossing) with pipe buried below 50 cm – 10 cm bedding (2-12 mm soil) if stones/rocks present in trench – Back-fill with soil that is free of lumps, from stones (>3 cm), and from organic matter – PVC pipe joined in trench and cure for >10 hr prior to pressurizing. Keep joints exposed to check for leaks. Expansion joints not necessary – For road crossing, may bury PVC pipe inside steel or concrete pipe (ID > diameter of PVC joints); final decision to be made in the field after evaluating potential for erosion 70 cm trench depth 10 cm bedding 10 cm 50 cm

Valve Boxes Design options – Obtain pre-cast valve boxes with lockable lids locally – Build from bricks and mortar with metal lids Specifications – 4” Pipe centered about 55 cm below ground level – Box should extend 10 cm above ground level – Internal dimensions roughly 45cmx45cm – Place support under valve Photos of current valve boxes installed in Las Delicias

Thrust Anchors for Elbows &Tees From Russ Turner, Tetratech

Summary of May 2012 Implementation

Summary of Finances for Implementation Include contribution from community to construction, etc.

Logistics and Implementation Plan

Schedule for Implementation BRIAN

Contingency Plans (worst case scenarios) for Implementation

Material Procurement Emphasize connections through Project FIAT

Plans for Phase II Implementation (Fall 2012)

Metrics Increase water supply by ~20% Increase in % of homes receiving sufficient water (at least 2x per week)

Concluding Remarks