Meeting Agenda Introduction (20 minutes)  Project Definition  Complete Street Goals  Existing Conditions Summary Work Session (1 hour)  Mapping Exercise.

Slides:



Advertisements
Similar presentations
January 23, 2006 FAIRFAX COUNTY PEDESTRIAN TASK FORCE FAIRFAX COUNTY PEDESTRIAN TASK FORCE FINAL REPORT.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
Module 3 SMART PARKING. Module 3 Smart Parking Introduction This is one of seven Transit Oriented Development training modules developed by the Regional.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
Highway 76 Complete Streets Project Study Session February 7, 2013.
Healthy Food in Underserved Areas. Policy Areas Healthy Food in Underserved Areas School Gardens Summer Food Service Program Farmers Markets and Retail.
GreenPlan Downtown Design and Greenberg Development Services Report.
1 Complete Streets: Guide to Answering the Costs Question Companion Presentation, Part 3.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 15 Publication No. FHWA-HRT Bicycle Lanes.
City of Toledo Bancroft Street Neighborhood Public Meeting November 20, 2013.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Dudley Square Complete Streets Design Project Public Meeting #1 October 22, :00pm – 8:00pm Boys & Girls Club of Boston Yawkey Club of Roxbury.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Slide 1. Slide 2 Introduction How did you get to school as a child?
PROJECT KICK-OFF Jason Collins, Ph.D., P.E., AICP October 14, 2008.
East Boulevard Pedscape – Scott Avenue to Kings Drive April 6, 2005.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
SEATTLE LIGHT RAIL STATION AREA PLANNING City of Seattle Station Area Planning in Seattle SEATTLE LIGHT RAIL STATION AREA PLANNING.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Montgomery County Transit Task Force Meeting August 17, 2011.
1 UNION STREET Easthampton | Complete Street Conceptual Design { { Streetscape for Union Street Community Workshop October 28, 2013 Planning Department.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
City of Leawood Bicycle Friendly Community The Year in Review.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Pine Hills Neighborhood Improvement District PUBLIC HEARING Board of County Commissioners December 20, 2011.
Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
Instructions  Check in with Andrew Bomberger at TCRPC to let him know what muni you will be visiting so he can give you any specific info for that muni.
Chicago Department of Transportation Bobby L. Ware, Commissioner Richard M. Daley, Mayor Metropolitan Planning Council November 3,
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Village of Villa Park Comprehensive Plan Update CPAC Meeting December 2 nd, 2008.
Ames Area Long Range Transportation Plan Issues / Visioning Workshop Originally helpd …November 3, 2009 Welcome!
We have a policy, now what?  Throw a party and go home?
Traffic Safety. WHY ARE WE HERE To keep children safe around our schools What we will be discussing –Driving safely in and around Schools –Bicycle safety.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
SEPARATED BIKE LANE PLANNING AND DESIGN GUIDE. Separated Bike Lane Planning and Design Guide Context Conforms to federal and state standards and guidelines:
Livingston County Transportation Connectivity Plan Final Report December 2013.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
Smyrna’s Major Thoroughfare, Bicycle, and Pedestrian Plan TOWN COUNCIL RETREAT APRIL 14, 2015.
TOD University (2013) Complete Streets 101. Images: Fehr & Peers Transportation Consultants.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
City of Belmont Comprehensive Bicycle and Pedestrian Plan Parks and Recreation Commission Meeting 11/4/2015.
2035 General Plan Update Planning Commission Study Session on Draft Circulation Element February 2, 2016.
Complete Streets Training Module 4b – Designing for All Users.
ROUNDABOUTING WHAT YOU NEED TO KNOW
32 Transportation Midway City 2016 General Plan
Comprehensive Route Network Analysis
Complete Streets Award Program
Project Management Team Meeting #3
Col. Pike Multimodal: About the Project
Public Information Meeting NW 100th Street Reconstruction Project
High Street Streetscape Improvement Project
Bike Safety Tips and Precautions for a SAFE and FUN bicycling experience this summer.
Early Voting Starts Oct. 20 | Election Day Nov
City of Wilmington Bike Plan Update
Hillsborough County Initiatives to Address School Safety
Sarno Road Corridor Study
URBAN TRAIL PROJECT UPDATES
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Presentation transcript:

Meeting Agenda Introduction (20 minutes)  Project Definition  Complete Street Goals  Existing Conditions Summary Work Session (1 hour)  Mapping Exercise  Prioritize Desired Improvements Report Out (30 minutes)

Knox Project Included in the approved 2012 bond program Budget of $734,400 Project Limits: Central Expressway to the Katy Trail  4 blocks, about 1,660 feet

Preliminary Project Schedule  May 2014:Public meeting #1: Review existing conditions, project goals and preliminary design priorities  May – Aug 2014:- Develop preliminary design concept alternatives  Aug 2014Public meeting #2: Present and review design options; identify funding priorities  Sep - Nov 2014: - Finalize design strategy/concept  Nov 2014:- Thoroughfare Plan amendment (if necessary) - Award engineering design contract  Dec – Feb 2015: - Preliminary engineering (20% design)  Jan 2015: Public meeting #3: Present and review preliminary engineering design  Jan– Aug 2015: - Final engineering design  November 2015: - Award construction contract  December 2015: - Start construction

Primary Stakeholders Property owners within a 200’ radius of the project Knox Public Improvement District Friends of the Katy Trail

Interdisciplinary Project Team Public Works  Keith Manoy/Tanya Brooks/Jared White/ – Transportation Planning  Jaime Gomez – Engineering City Design Studio  David Whitley, Evan Sheets Sustainable Development and Construction  Peer Chacko, Luis Tamayo, Mark Brown Streets Operations  Steve Cherryholmes Storm Water Management (iSWM)  Dorcy Clark Economic Development  Vasavi Pilla, Jon Hubach

Complete Streets Goals  Build streets that are safe and comfortable for everyone; young and old; motorists and bicyclists; walker and wheelchair users; bus and train riders alike.

Preliminary Project Goals  To design and build street improvements to support continued economic development of Knox Street as a retail and mixed use corridor  To promote a safe pedestrian and comfortable environment  To support biking and transit use in the area

Existing Conditions Summary ROW Width  Approximately 60 feet Street Condition  Generally classified as ‘Fair’ with some ‘Failing’ alleys DART Bus Route  No DART routes on Knox  Rt #521 stops at Knox and Cole and at Knox and McKinney  Rt #24 stops on Central / Henderson

Existing Conditions Summary Issues to Consider  Traffic speeds  Vehicular turning movements  Angled / Head-in / Other parking  Sidewalk widths  Sidewalk conditions  Pedestrian crossings  Signals and Signs  Bike accommodations  Trail access  Landscaping  Utilities  Pedestrian lighting

Work Session Mapping Exercise  What you like  What you don’t like Prioritize Desired Improvements  Brain storm ideas for improvements  Prioritize desired improvements