Empowering Rural Electrification in Myanmar: Opportunities and Policies Tungapuri Hotel Nay Pyi Daw, Myanmar Dr. Chris Greacen March 9, 2013.

Slides:



Advertisements
Similar presentations
Hydropower Development Policy & Regulatory Framework
Advertisements

UK-Malawi Trade & Investment Forum March 20, 2013 Energy Sector Perspectives Rob Mills World Bank.
AFD support to geothermal development
- P G Ajith kumara.  Introduce strong community/ business concept  Build capacity of non technical aspects  Build capacity of technical Aspects  Identify.
Citizen’s meeting on Power Sector Reform Chris Greacen November 25, 2007 Bangkok, Thailand Solar, wind, hydro, CHP in Thailand: technology, cost, potential,
Climate Investment Funds SCALING-UP RENEWABLE ENERGY IN LOW- INCOME COUNTRIES (SREP) Investment Plan for Solomon Islands June 2014 Government of Solomon.
The Renewable Energy Development in Cambodia
Climate Change and Energy Access in Island States -
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
1. 2 The Problem 75% of our energy expenditures leave the state, versus growing jobs, incomes and revenues here at home. Indiana already imports essentially.
Cambodian Energy Sector Development Ministry of Industry, Mines and Energy Vietnam, Ho Chi Minh, 11 November, 2011 Greater Mekong Subregion Fifth Meeting.
Chris Greacen Li Garden Hotel, Hat Yai, Thailand 20 Nov, 2005 Solar, wind and micro-hydropower: options, costs, resource assessment Palang Thai.
Outline of JICA’s Assistance prepared for
Practical Policies for Decentralized Electricity Generation Chris Greacen Palang Thai MEE-Net Workshop 18 January 2012 Bangkok.
Financing renewable energies in Myanmar COMMITTEE 2 ON RENEWABLE ENERGIES AND CLIMATE CHANGE ADAPTATION.
Alternative Energy Development Plan (2008 – 2022), Medium - and Long – term Investment Plan and the Role of the Private Sector Mr. Rangsan Sarochawikasit.
THE CURRENT STATE OF ENERGY SECTOR IN MONGOLIA, DEVELOPMENT TRENDS
Sustainable Energy at the World Bank: Policies and Experiences Anil Cabraal Lead Energy Specialist Energy and Water Department The World Bank Norway-World.
The NEP Workshop on Off-Grid Electrification in Myanmar
Environment and Energy Htun Paw Oo 1 June Content Environment and Energy Ecosystem services The role of energy Myanmar energy context Way forward.
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
Thailand situation analysis and initial idea for case study Chris Greacen Sopitsuda Tongsopit Chuenchom Greacen Palang Thai.
1 Guidelines for Developers of Small Power Projects (SPP) in Tanzania Main features of a draft for discussion 25 Feb 2009 Chris Greacen
FY Preliminary AssessmentQuick Wins by 2015 National Sector Strategy ● Need the mid- to long-term Power M/P based on demand forecast.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Chris Greacen Chiang Mai, Thailand 24 January 2013 Grid-connected renewable energy in Thailand under the VSPP and SPP programs MEENet workshop, session.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
Investment Policy of Lao PDR Thamma PHETVIXAY Deputy Director General Investment Promotion Department (IPD) Ministry of Planning and Investment, Lao PDR.
Energy Policy and Planning Office The Energy Conservation Promotion Fund for Developing RE Projects in Thailand Pinnara Premcharoen Policy and Plan Analyst.
Electricity in Thailand: current arrangements, impacts, alternatives 2 August, 2006 ERI Chris Greacen
Institutional Structures and Processes for High-Quality, Scaled Implementation Mini-hydro power for energy access Oliver J. Haas.
The NEP Workshop on Off-Grid Electrification in Myanmar Nay Pyi Taw, January 2015 South-South Cooperation to Power Rural Communities through Renewable.
1 Development of Renewable Energy Application in Vietnam Energy and Petroleum Department MINISTRY OF INDUSTRY.
Myanmar: Towards Universal Access to Electricity by 2030 Nay Pyi Taw, January 28, 2015.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
May 20, 2009 MeeNet, Thailand Micro-hydro, biomass, biogas: technology, cost, potential, applications Palang Thai.
Seite 1 REETA Planning Workshop, Georgetown 11./12. February 2014 Developing Public-Private Partnerships for Sustainable Energy.
Prof F.D. Yamba I NTERNATIONAL S EMINAR REFIT AND CHALLENGES IN ZAMBIA 30 TH – 1 ST M ARCH, 2015.
Renewable Energy Policies of Germany and China Masood Ahmed CRER, SZABIST December 24’ 2009.
Grid-tied decentralized power generation: experience from Thailand and Tanzania Chris Greacen Palang Thai AEPF 9 17 October 2012 Vientienne, Lao.
Regional Learning Session on Sustainable and Inclusive Marketing Arrangements Towards Increasing Farmers’ Market Power 9-11 May 2013 Manila Vedini Harishchandra.
Clean electricity options for a free Burma Chris Greacen Palang Thai Seminar on “Energy: Tragedy in Burma” 20 November 2007 Chulalongkorn University.
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
GMS Power Grid Who gains, who loses? Chuenchom Sangarasri Greacen 17 July 2005 Piyawan Resort.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
MiniGrid Group NEP Off Grid Electrification Breakout session.
Selling renewable energy profitably to the grid: The evolution and results of Very Small Power Producer (VSPP) Regulations in Thailand and Tanzania Regional.
REDUCING POVERTY AND ENHANCING ACCESS TO RESOURCES MAY 24, 2010 Best Practices for World Bank Energy Investment in Central Asia.
Governance issues in the Thai Electricity Sector WRI/TEI Workshop on Electricity Governance in Asia Chuenchom & Chris Greacen Palang Thai:
VANUATU Renewables Readiness Assessment Report November 2015.
Legal, Regulatory and Financial Incentive Framework to Support Landfill Gas Power Generation Project Development Presented by Leiping Wang Senior Energy.
BRIEF ON RE PROGRAMMES STATUS AND REFITS IN TANZANIA. For International seminar on Global Renewable Energy Support Programme focusing on Globally funded.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
Kazakhstan Electric Association KEA Established in 1998 Unites 21 participants and 12 observers Among participants 9 distribution companies 3 vertically.
“Access to electricity is … the connection that’s needed to plug Africa into the grid of the global economy. In partnership with African nations [and the.
Renewables Readiness Assessment -Background Jensen Shuma IRENA - local consultant Dar es Salaam, 9 March 2016.
Supporting Scaled Up Private Investments in Clean Energy Infrastructure. Washington, D.C., October 6&7, 2014.
Hanoi, October GROWTH RATE OF ELECTRICITY DEMAND Growth rate of Electricity consumption, period Growth rate of Electricity consumption,
Chris Greacen Integrated Resource Planning for Myanmar’s Electricity Sector Naypyitaw, Myanmar 11 Feb 2015 Integrated Resource Planning (IRP) -- a tool.
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
Renewable energy potential in Thailand
Off-grid Electrification Department of Rural Development
Engaging the private sector
THE REPUBLIC OF MALAWI MALAWI PRESENTATION AT
Mini-grids and the Arrival of the National Grid
Conditions for viability of minigrids
Connecting small renewable energy generators to the grid in Thailand: case studies & technical requirements Renewable Energy Forum Thursday, 28 October.
Connecting pigfarm biogas to the grid in Thailand – VSPP regulations
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Wind Development & Policy Options
Presentation transcript:

Empowering Rural Electrification in Myanmar: Opportunities and Policies Tungapuri Hotel Nay Pyi Daw, Myanmar Dr. Chris Greacen March 9, 2013

Outline Early indications of ADB/IFC/World Bank strategies Empowering rural electrification strategy: –Off-grid small power producers –Grid extension Supporting regulations

Electrification 26%

ADB / World Bank / IFC Early indications of power sector development strategies:

ADB/IFC/World Bank Stated goals “Inclusive economic growth” “Reduce poverty and improve quality of life” “ADB’s vision is an Asia region free of poverty” “Regional integration” Power sector strategies Committed $600 million for energy sector “Private sector participation” –Creation of legal and regulatory frameworks to lower risks to private sector (including foreign investment) –Unbundling –Bidding Focus on: – centralized, large-scale generation (each plant > 100 MW) Coal Natural gas (CCGT) Large hydropower –500 kV transmission

POWER SECTOR (IV) Future Generation Expansion –92 Hydro potential sites (46,000 MW) –13 by MOEP1 (2,572 MW) –7 BOT by local private sector (560 MW) –44 FDI (BOT or JV) - 42,145 MW; 2 coal, 870 MW, –1 gas power generation, 470 MW –1 coal in Yangon, J power, 600 MW? (new) Power Demand projections: 2001, no systematic approach –A power demand master plan is needed: generation, transmission and distribution –Planning softwares and capacity building is needed

ADB/IFC/World Bank Stated goals “World without poverty” In Myanmar: “focus on energy infrastructure development“ “Connecting people and businesses to a reliable electricity grid is critical for Myanmar to realize its enormous social and economic potential” Power sector strategies Short-term: –Committed $420 million with focus on energy –Replacing gas turbines –Providing $80 million grants for community-driven development health, education, water supply, rural electricity Long-term focus still unclear, but World Bank articles on Myanmar give example of WB work extending the grid in Laos and Vietnam. Telephone call with IFC in February: “focusing so far on centralized electricity”

Electricity for whom?

Large Plants Customers Small Power Producer Mini- Grid Customers Empowering rural electrification strategy: extending the grid and encouraging rural mini-grids National Grid

Energy export $ Donor funds $ Electrification Fund Regulatory framework allows for fair treatment of both

Mae Kam Pong, Chiang Mai, Thailand Built by government & community 40 kW Used to be off-grid; Making arrangements to sell electricity to grid

Mawengi village, Njombe, Tanzania LUMAMA hydropower project 300 kW – remote mini-grid

4 MW hydro - Tanzania electricity to 4000 households in >15 villages & sells to the grid

Rice husk gasifier Myanmar – Kayuklot Township electricity to 500 households

Biogas from Pig Farms Reduces air and water pollution Produces fertilizer Produces electricity 8 x 70 kW generator

Sugarcane bagasse -- Tanzania capacity: 17.5 MW powers factory, irrigation, hospital, school, thousands of homes sells 4 MW to main grid but can also operate as isolated minigrid 16

faster if local entrepreneurs are also empowered to build mini-grids Electrification

faster if local entrepreneurs are also empowered to build mini-grids

Electrification faster if local entrepreneurs are also empowered to build mini-grids

Supporting laws and regulations Include SPPs in national energy law Provides mini-grids with legal right to exist Provides for establishment of: –Rural Energy Agency (REA) (if suitable agency does not already exist) –Small Power Producer (SPP) regulations

Rural Energy Agency (REA) Provides technical and financial support to SPP developers; Manages Rural Energy Fund: –Pays up to $500 subsidy per new connection – EITHER on-grid or isolated mini-grid if built to national standard; –Subsidizes SPP business plans and feasibility studies Website of Tanzania REA:

$ Small Power Producer (SPP) regulations Thai “Very Small Power Producer” documents : Tanzania “Small Power Producer” documents:

SPP program includes Streamlined licensing and approval For grid-connected SPP: –Streamlined grid interconnection procedures –Standardized Power Purchase Agreement (PPA) –Standardized tariffs For off-grid SPP: –Flexibility in tariff setting –Provisions to reduce risk when main grid expands to formerly isolated SPP mini-grid

VSPP results in Thailand

What to do when the “big grid” expands to reach the “little grid”? Allow formerly off-grid generators to sell back to the grid; and/or Allow mini-grid operators to purchase wholesale electricity from the grid for resale to retail customers.

Who owns the minigrids? Nepal: –rural communities –local private sector Cambodia: –local private sector Tanzania: –local private sector –church, –communities, –utility

Thai Government loans funds at 0% interest to commercial banks for investment in: Energy efficiency improvement projects Renewable energy development and utilization projects January 2003 – present 7000 M Baht 11 local financial institutions have participated. Max loan amount: 50 MB Max. interest rate: 4% Max. loan period: 7 years Revolving Fund Low cost financing

28 Thailand’s Board of Investment (BOI)’s tax incentives for renewable energy projects: Corporate income tax holidays up to 8 yrs. Additional 50% reductions of corporate income tax for 5 yrs Import duty reductions or exemptions on equipment and raw materials Tax Incentives Tax incentives

Summary Question of "electricity for whom" must be in forefront. Concern that the ADB (and World Bank/IFC?) likely to focus on centralized approach unless requested to do otherwise. Better strategy involves both grid extension and encouraging off grid small power producers. Include SPPs in new national energy law. Rural energy fund (REF) capitalized by donor funds leveraged by revenues from energy exports. REF available as per-connection subsidy both to off-grid and on-grid, also subsidizes feasibility studies and business plans. SPP rules provide for streamlined interconnection to grid, standardized PPAs and tariffs. Isolated mini-grids can connect if/when main grid arrives.

Resources Tanzania Rural Energy Agency (REA): Tanzania Small Power Producer (SPP) rules and documents: Thai VSPP regulations and documents: Electricity Authority of Cambodia (license, regulations, tariffs for mini-grids):

Chris Greacen Palang Thai