COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM

Slides:



Advertisements
Similar presentations
Thule Smart RV™ Pod Kit Installation For Smooth-Sided Fiberglass RVs
Advertisements

Sectional Assembly and Installation
Lightweight Forming System and Roofs for Concrete Floors.
Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Drills & Drilling Drills & Drilling.
Technician License Course Chapter 9 Lesson Module 22 Mechanical Safety.
RockOn! Canister Integration RockOn! 2009.
1 FITTING INSTRUCTIONS DUCOSUN UNIFIT Cubic & Linear.
GLOBAL LIFT CORP COMMERCIAL SERIES PORTABLE KIT Portable Kit -
Types of Screw.
Split Sole 45 Degree Raker
Connector Installation Guide For Compression and Mechanical Connectors
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Rev: Section 3 Framing Operations. Rev: Learning Objectives: Section 3 Understand when fall protection must be provided Evaluate the use.
Foundation Systems.
TOUGHENED GLASS FIBER REINFORCED BODY TOUGHENED GLASS FIBER REINFORCED BODY ONE PIECE BODY FOR OPTIMUM INTEGRITY ONE PIECE BODY FOR OPTIMUM INTEGRITY STANDARD.
Global Lift Corp Understands that there will many questions Asked in regards to ADA Laws, this will guide you along The way of.
Global Lift Corp ADA Laws & Commercial Series Lifts.
Chapter 7 Metals.
Building with PolySteel. #1Footings Install standard (level) footings with rebar placed at the intervals required by your building design, as outlined.
SimTek Fence. About Us Founded in 2007, SimTek Fence has reinvented fence manufacturing with its patented design of rotationally-molded.
Solid Sole 60 Degree Raker
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
SANUS SYSTEMS THE UNION OF FORM AND FUNCTION Sanus Systems 2221 Hwy 36 West. St. Paul, MN
CONSTRUCTING A FIVE CABIN LATRINE
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
Metals. Introduction u Metal is used in various places in the construction process including: –rebar = reinforcing steel in round shapes –flashing = thin.
㈜ D.S.T. 자료용 1. Power film Installation 1. Install the heat insulation on the floor. 2. Install the power film on the heat insulation. 4. Connect the thermostat.
Openergo A self-build rowing machine
DROP IN ANCHOR DETAIL COMMERCIAL SERIES LIFTS INSTALLATION MANUAL Drop In Anchor/COMMERCIAL SERIES.
Installation. Indoor Unit Installation Typical Installation.
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
The Invisible Flood Control Wall ™ Flood Control America presents.
RLP Installation. RLP Approvals Most Servicing Railroads and ALL Class 1’s (excluding CSX) Require that the scale design, location and functionality be.
Section C Nonstructural Protective Measures
Chapter 43 Common Commercial Construction Materials.
Fundamentals of Structural Detailing
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
OVERVIEW OF INSTALLING A DOUBLE TRUSS CAISHEN CONTAINER ARCH SHELTER
Electrical Safety Authority
Easy Reach 7.0 Honda Element Packing List QtyDescriptionPacked 115ft 10ga Red Wire 16ft 10ga Black Wire 140amp Breaker 23/8 Yellow Ring Terminals 25/16.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Grounding the Electrical System Reference: AAVIM “Electrical Wiring” Created May 2007.
COMPONENT IDENTIFICATION AND INSTALLATION GUIDELINES FLOODBREAK, AUTOGATE FloodBreak, L.L.C Post Oak Blvd., Suite 5850 Houston, Texas
Section 2 Safety, Tools and Equipment, Shop Practices Unit 6: Fasteners.
Assembly of steering.
Mezzanine Build Plans.
VIEW SERIES with Sliding Door
Installation Walkthrough Image Guide
STEP 1: ASSEMBLE ANGLE PLATES
Concrete Lesson 2: Site Preparation
Grounding the Electrical System
Objectives Describe the fasteners, anchors, and adhesives used in construction and explain their uses. f. Identify various types of mechanical anchors.
Objectives Describe the fasteners, anchors, and adhesives used in construction and explain their uses. a. Identify various types of nails and cite uses.
MDX-R3 INSTALLATION PROCESS NON-ADJUSTABLE CONCRETE POOLS
Grounding the Electrical System
Easy Reach 7.0 Honda Element 2003
Easy Reach 7.0 Honda Element 2003
STEP 1: ASSEMBLE ANGLE PLATES
Stainless Steel Water Well Casing.
Assembly instructions for M-K all bolt together hoppercone kit.
Horizontal Installation Overview
DucoSlide Luxframe F Fitting instructions L.H. R.H.
ESS Concrete Pit Lids.
ALDRC HEAD GATE FINISHED VIEW
Neutron guide Shielding Concept
STANDING WATER FOOTBRIDGE
Where to Use Warning Lines
Presentation transcript:

COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM Patent Pending INSTALLATION MANUAL

TRI-POINT ANCHORING SYSTEM INSTALLATION COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM INSTALLATION Patent Pending PARTS LIST 1 - Anchor Plate with bonding Lug 3 - 5/8 Stainless Steel Bolts 3 - 6” Anchoring Rods

ANCHORING PLATE, ANCHORS & BONDING LUG 5/8’s Bolts

TRI POINT ANCHOR INSTALLATION – COMMERCIAL SERIES Anchor Plate’s front edge should be no closer than 17” to the pool wall Attach copper wire to the bonding lug and then to your bonding grid Cold Pin’s should be ½” rebar 6” to 8” long Water Pool Wall Minimum 17” Distance From pool wall Overview 3’ Anchor Plate Section Detail 3’ 3’ 6” Threaded Anchor’s Cold Pin 6” Bonding Lug Cold Pin Concrete Concrete SAND 5/8 Bolts

NOTE: Contact Qualified Contractor for installation! Step 1: Determine the location for installation (Make sure all ADA requirements are met) Step 2: Make sure that all the parts are present (Refer to the parts list) 1 - Anchor Plate with Bonding Lug 3 - 5/8 Stainless Steel Bolts 3 - 6” Anchors Step 3: At the determined location for installation, chalk out a 3’ X 3’ area prior to cutting out the concrete. (Refer to overview, the front end of the Anchor Plate must be no more than 17” from the pool wall and at least 6” deep). NOTE: Contact Qualified Contractor for installation! Step 4: Once the 3” X 3” area is cut out, make sure you drill in the inner wall of all 4 sides of the area (refer to the section detail) for the purpose of cold pinning the new concrete to the old concrete. Use 1/2” rebar, 6” to 8” in length. Step 5: Attach the 3 – 6” threaded anchor’s with the 5/8’s bolts (included) to the Anchor Plate and tighten down.

Step 6: Place the Anchor Plate in the area, make sure that the front of the Anchor Plate is no less than 17” from the pool wall. (refer to overview) A key element is to make sure that the Anchor Plate is level and square with the pool so that your Commercial Series Lift sits properly on the deck. Step 7: Grounding the unit – The bonding lug is already installed on the Anchor plate (furthest point from the pool wall on the Anchor Plate) locate the bonding lug, attach at a minimum 14 – 16ga copper wire and then attach to your bonding grid. NOTE: Contact electrician to make sure you comply with the BONDING CODES. Step 8: Pour in your concrete, (make sure you cover the holes in the 3 threaded anchor’s so you don’t get concrete in the threads) minimum of 4,000 psi with reinforcing rod. Also make sure that the tops of the threaded anchors are flush with the deck. Before you install your lift make sure you let the concrete set up for 48 hours. Step 9: After the concrete has set for 48 hours, now it’s time to install your lift. Place your Commercial Series Lift over the anchor holes, screw in the Anchor bolts that are included and tighten down securely. Once you have completed the installation, please refer to User’s Manual for a safe operation.