Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.

Slides:



Advertisements
Similar presentations
ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Advertisements

Fraser Centre State College, PA Tyler Strange Structural Option Consultant: Dr. Thomas Boothby April 13, 2011 Tyler StrangeStructural Option Fraser Centre.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
TYPICAL member spot checks & alternate systems design study
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
H OTEL | N ORTHEAST U.S. J ORDAN R UTHERFORD | S TRUCTURAL O PTION F ACULTY A DVISOR | D R. T HOMAS B OOTHBY AE S ENIOR T HESIS | A PRIL 8, 2013.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
Mathew Nirenberg AE Senior Thesis Structural Option.
Helios Plaza Houston, TX Advisor - Dr. Hanagan Kevin Zinsmeister Structural Option.
Seth M. Moyer Office Buildin g Sayre, PA Structural OptionAdvisor: Dr. Thomas E. Boothby.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Student Health Center Jacob Brambley - AE (structural option)
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Coppin State University Physical Education Complex Baltimore, MD Todd Drager Faculty Consultant: Lepage Coppin State University Physical Education Complex.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
Hunter Woron Spring 2012 Structural Professor Parfitt.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Mountain State Blue Cross Blue Shield Headquarters
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Ryan Johnson - Structural Option
FDA CDRH Laboratory Timothy Mueller Senior Thesis, Spring 2006
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Project: 250 West Street, Columbus, Ohio
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009

Outline Eric M. FosterCrocker West Building Structural Option  Overview of Existing  Proposal  Structural Depth Study  Architectural Breadth Study  Construction Management Breadth Study  Summary/Conclusions  Acknowledgements  ???

Overview of Existing Eric M. FosterCrocker West Building Structural Option  Location  224 Science Park Road  State College, Pa

Overview of Existing Eric M. FosterCrocker West Building Structural Option  Location  224 Science Park Road  State College, Pa  Just of SR 26 in Ferguson Township

Overview of Existing Eric M. FosterCrocker West Building Structural Option  Location  Use  40,000 s.f. Light Industrial  70,000 s.f. Office  10,000 s.f. Warehouse Storage

Overview of Existing Eric M. FosterCrocker West Building Structural Option  Location  Use  Zoning  Light Industry, R & D

Overview of Existing Eric M. FosterCrocker West Building Structural Option  Location  Use  Zoning  Owners  C2S, LLP. (Scott Smith & Mike Coyle)

Overview of Existing Eric M. FosterCrocker West Building Structural Option  Location  Use  Zoning  Owners  Size  3-Story Low-Rise Building (45 ft)  121,000 s.f.

Overview of Existing Eric M. FosterCrocker West Building Structural Option  Location  Use  Zoning  Owners  Size  Cost  Approximately $18 Million

Overview of Existing Eric M. FosterCrocker West Building Structural Option  Architectural Precast Concrete (APC)  Columns(24 in square columns)  Wall Panels (9 ½” & 12 ½” Thk. Insulated Panels) o Brick In-lay Finish  Inverted Tee (IT) Beams(18”-28” Deep)  4 ft wide Hollow-Core Plank (8”-12” Thk.)

Overview of Existing Eric M. FosterCrocker West Building Structural Option  Architectural Precast Concrete (APC)  Lateral System  APC Shear Walls

Outline Eric M. FosterCrocker West Building Structural Option  Overview of Existing  Proposal  Structural Depth Study  Architectural Breadth Study  Construction Management Breadth Study  Summary/Conclusions  Acknowledgements  ???

Proposal Eric M. FosterCrocker West Building Structural Option  Structural Depth Study  Request of Additional 3-Stories for Office Space  Redesign using Composite Steel Framing utilizing Concentrically Braced Frames (CBF) for Lateral

Proposal Eric M. FosterCrocker West Building Structural Option  Structural Depth Study  Architectural Breadth Study  Ramifications of Additional 3-Stories to Architectural Program and Overall Exterior Vision  Construction Management Breadth Study  Relative Cost Comparison of Different Framing Systems

Outline Eric M. FosterCrocker West Building Structural Option  Overview of Existing  Proposal  Structural Depth Study  Architectural Breadth Study  Construction Management Breadth Study  Summary/Conclusions  Acknowledgements  ???

Structural Depth Study Eric M. FosterCrocker West Building Structural Option  Existing Floor System  APC Hollow-Core Plank System  Proposed Composite Floor System  3” USD Metal Deck w/ 3” L.W.C.

Structural Depth Study Eric M. FosterCrocker West Building Structural Option  In-fill Beams  W14x61  Girders  W18x76  Columns  Range from W12x40 to W14x211

Structural Depth Study Eric M. FosterCrocker West Building Structural Option  Existing Lateral System  APC Shear Walls  Proposed Lateral System  Concentrically Braced Frames (CBF)

Structural Depth Study Eric M. FosterCrocker West Building Structural Option  Lateral Framing  Total of Seven (7) CBF’s  HSS Bracing Utilized  Symmetrical Layout Hinders Torsional Irregularities  RAM  Used to Analyze and Design  Drift, Story Drift, Torsion included in Design Checks

Structural Depth Study Eric M. FosterCrocker West Building Structural Option  Bracing  HSS used for all CBF’s  HSS 12 x 8 x 5/8” typical size

Structural Depth Study Eric M. FosterCrocker West Building Structural Option  CBF Pro’s & Con’s  Easy Installation/Fast Erection Time  Cheaper than Moment Frames  Bracing Alters Program Requirements  Architectural Function  Used to accentuate exterior views by exposing CBF

Outline Eric M. FosterCrocker West Building Structural Option  Overview of Existing  Proposal  Structural Depth Study  Architectural Breadth Study  Construction Management Breadth Study  Summary/Conclusions  Acknowledgements  ???

Architectural Breadth Study Eric M. FosterCrocker West Building Structural Option  3-D Modeling  Building Information Modeling (BIM)  Autodesk Revit Architecture  Architecture  New Exterior Façade introduces New Style of Architecture to surrounding area

Architectural Breadth Study Eric M. FosterCrocker West Building Structural Option  Additional 3- Stories  Nearly Doubles Existing Height (79 ft Mean Roof Ht.)  APC Height Limitations  Facade  Metal Panel w/ Glazing In-fill  Glass Curtain Walls

Outline Eric M. FosterCrocker West Building Structural Option  Overview of Existing  Proposal  Structural Depth Study  Architectural Breadth Study  Construction Management Breadth Study  Summary/Conclusions  Acknowledgements  ???

CM Breadth Study Eric M. FosterCrocker West Building Structural Option  Cost  APC cost estimated $3.95 Million  Steel cost estimated $3.1 Million  Schedule  Similar Erection Times (APC vs. Steel)  Façade could prove to be largest difference between systems  13 month schedule would be difficult to beat

Outline Eric M. FosterCrocker West Building Structural Option  Overview of Existing  Proposal  Structural Depth Study  Architectural Breadth Study  Construction Management Breadth Study  Summary/Conclusions  Acknowledgements  ???

Summary/Conclusions Eric M. FosterCrocker West Building Structural Option  Structural  Steel Proved Viable  CBF Later System Design limits serviceability issues  Seismic Weight Reduced by switching to steel  Architectural  New Architectural Style to surrounding area  Maintained Overall Architectural Program  Construction Management  Cost and Schedule Comparable

Outline Eric M. FosterCrocker West Building Structural Option  Overview of Existing  Proposal  Structural Depth Study  Architectural Breadth Study  Construction Management Breadth Study  Summary/Conclusions  Acknowledgements  ???

Acknowledgements Eric M. FosterCrocker West Building Structural Option  Scott Smith and Scott Smeal of Civilsmith Engineering, Inc.  Mike Coyle of Northwestern Mutual Financial  Mike Evanko of Evanko-Renwick Engineering  AE Faculty and Staff  On-line Mentors  ALL MY FAMILY and FRIENDS

Eric M. FosterCrocker West Building Structural Option Thank You!

??? Eric M. FosterCrocker West Building Structural Option Questions