Dr. Gunther Haller XES Controls & 11 July 2007 1 Experimental Area Controls and Data-Acquisition Gunther Haller Research Engineering.

Slides:



Advertisements
Similar presentations
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Advertisements

26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
Data Acquisition System for 2D X-Ray Detector Beijing Synchrotron Radiation Facility (BSRF) located at Institute of High Energy Physics is the first synchrotron.
Gunther Haller Parallel: X-Ray Controls & DAQ LCLS FAC Meeting 30 October Experimental Area Controls and Data-Acquisition.
LCLS Control Group Sheng Peng October 26, Injection Laser Stabilization Control System Preliminary Design Outline Introduction.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
Tom Fornek LUSI June 17, LUSI UPDATE – June, 2008.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
1 G. Haller 1 LUSI XCS FIDR June 17, 2009 XCS Photon Controls and Data Systems Gunther Haller XCS Instrument Final Instrument.
Robert C. Sass Facility Advisory Committee April XES Controls/DAQ 1 AMOS/LUSI Controls and Data Acquisition LCLS eXperimental End Stations (XES)
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 LUSI Overview J. B. Hastings January 2007 Lehman Review Response to Lehman Review.
Gunther Haller Plenary: X-Ray Controls & Data LCLS FAC Meeting 29 October Experimental Area Controls and Data-Acquisition.
Steve Lewis Direct Imager 06 Dec EPICS Controls Steve Lewis 07 December 2007 LCLS Direct Imager Final Design Review.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES LCLS Week 4-8 April, 2005 Steve Lewis X-ray Transport, Optics, and Diagnostics:
1 G. Haller 1 LUSI CXI FIDR June 3, 2009 CXI Photon Controls and Data Systems Gunther Haller Coherent X-ray Imaging Instrument.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
1 Gunther Haller 1 Photon Area Controls FAC Review June 09 Photon Systems Controls and Data Systems Gunther Haller Particle Physics.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
Steve Lewis XTOD Controls FDR 14 February 2008 XTOD Instrument Controls Final Design Review Steve Lewis 14 February 2008.
Steve Lewis XTOD Controls FDR 13 March 2008 XTOD Vacuum Controls Final Design Review Steve Lewis/Keith Kishiyama 13 March 2008.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
Gunther Haller LUSI DOE Review Aug. 20, 2008 Controls (WBS 1.6) p. 1 Breakout Session G. Haller – Sub-System Manager August 20,
Gunther Haller SiD LOI Meeting March 2, LOI Content: Electronics and DAQ Gunther Haller Research Engineering Group.
Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F I E D LDAQ – the New Lujan Center Data Acquisition Application Frans Trouw, Gary.
IMPLEMENTATION OF SOFTWARE INPUT OUTPUT CONTROLLERS FOR THE STAR EXPERIMENT J. M. Burns, M. Cherney*, J. Fujita* Creighton University, Department of Physics,
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Dayle Kotturi Lehman Review May 10-12, 2005 LCLS Timing Outline Scope SLC Master Pattern Generator Introducing the PNET VME receiver.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Haller/Lewis XTOD Controls July 27, XTOD Controls Preliminary Design Review Steve Lewis & Gunther Haller.
Instrumentation at CLS (Presentation to Saskatchewan Instrumentation Society Executive) Elder Matias Canadian Light Source University of Saskatchewan
Steve Lewis Gas Detector 6 December Instrumentation & Controls Steve Lewis Paul Pax Elden Ables 6 December 2006 LCLS Gas Detector.
Control Hardware Design Control Hardware Wiring IOC Software (Low Level) OPI Software (High Level) Final Test Front-End (Connection to SR1 Ring) Done Insertion.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS Timing System (pattern design, evGUI, and high level) Mike Zelazny for LCLS Timing.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
Laser Heater Controls Overview 21 August 2008 Matt Boyes Laser Heater Controls Design Overview EPICS IOC Team Meeting Matt Boyes.
Gunther Haller SiD Meeting January 30, 08 1 Electronics Systems Discussion presented by Gunther Haller Research Engineering.
1 EIR Nov 4-8, 2002 DAQ and Online WBS 1.3 S. Fuess, Fermilab P. Slattery, U. of Rochester.
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
DoE Review January 1998 Online System WBS 1.5  One-page review  Accomplishments  System description  Progress  Status  Goals Outline Stu Fuess.
Stephen Norum LCLS Oct. 12, LCLS Machine Protection System Outline Overview of interim MPS Update on the interim MPS.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
Daniel Piso Fernández Some Ideas about Integration Support Cases and PLC Activities at Controls Division.
Gunther Haller LUSI DOE Review July 23, 2007 Controls (WBS 1.6) 1 Control and Data Systems (WBS 1.6) Gunther Haller Scope Control.
BaBar Transition: Computing/Monitoring
ALICE – First paper.
LUSI Coordination with LCLS
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Experimental Facilities Planning
EPICS Controls Steve Lewis 13 December 2007
The IFR Online Detector Control at the BaBar experiment at SLAC
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
LUSI Controls and Data Systems W.B.S. 1.6
LUSI Controls and Data Systems W.B.S. 1.6
NEH - Status Stefan Moeller.
LCLS Machine Protection System
X-Ray Endstation Systems (XES) 2006 Schedule
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

Dr. Gunther Haller XES Controls & 11 July Experimental Area Controls and Data-Acquisition Gunther Haller Research Engineering Group Particle Physics and Astrophysics Division 11 July 2007 v5

Dr. Gunther Haller XES Controls & 11 July Outline Hutch Assignments LCLS versus LUSI Responsibilities Main Control & DAQ Sub-System Component Descriptions XES (X-Ray End Station) Control & DAQ Architecture & Components Team/Organization Schedule Budget

Dr. Gunther Haller XES Controls & 11 July Hutch Assignments ** AMO: LCLS PP, XPCS, CXI: LUSI ** SXR Imaging, SXR Pump-Probe, HEDS are not funded at this time

Dr. Gunther Haller XES Controls & 11 July LCLS & LUSI Common Controls and DAQ System Design for LCLS and LUSI G. Haller is CAM for LCLS and LUSI Controls & DAQ, including XTOD Controls LCLS Controls & DAQ W.B.S Common services for all hutches PPS Laser PPS Accelerator timing interface 120 Hz beam-quality data interface Machine protection system interface User safeguards Network interface AMO experiment (NEH, hutch 2) All controls and DAQ 2-D detector Control and DAQ for detector itself only LUSI Control & DAQ W.B.S X-Ray Pump Probe, XRPP (NEH, hutch 3) X-Ray Photon Correlation Spectroscopy, XPCS (FEH, hutch 1) Coherent X-Ray Imaging, CXI (FEH, hutch 2) LCLS & LUSI Local data storage in halls

Dr. Gunther Haller XES Controls & 11 July Controls & DAQ Organization Online Systems organized into following main blocks Controls Vacuum, motion, power supply, etc Science Data-Acquisition Detector readout Data-Management/Processing Online data movement, processing, feature extraction, filtering Offline

Dr. Gunther Haller XES Controls & 11 July Example: AMO Instrument Controls & DAQ Main Systems Cameras Motion Vacuum Power Supplies Detector Data-Acquisition

Dr. Gunther Haller XES Controls & 11 July Main Controls Sub-Systems Viewing/Cameras Vacuum Motion Bias Supplies Gas Laser Accelerator Interface Systems Timing 120 Hz beam data Machine protection system Personal protection system Infrastructure (Racks, Cabling, Networking) Software Applications

Dr. Gunther Haller XES Controls & 11 July Viewing/Camera System Block Diagram 8 cameras PULNiX 6710CL (648x484, 9um x 9um) Up to 120 Hz Triggered by timing signal from timing system event receiver PMC card Centroid finding software running on VME IOC EDT DV CameraLink PMC card PULNiX 6710CL camera

Dr. Gunther Haller XES Controls & 11 July Vacuum System Block Diagram 2 Turbo-scroll pumps 5 Ion pumps 9 Cold cathode gauges 10 Pirani gauges Gamma ion pump controller

Dr. Gunther Haller XES Controls & 11 July Motion System Block Diagram 67 Stepper motors Hytec SMDS4-B driver Newport XCS controller

Dr. Gunther Haller XES Controls & 11 July Spectrometer Data Acquisition Up to 8 GHz waveform sampling, 1 usec record or 1-GHz, 500-usec window At 120 Hz -> 100 Mbytes/sec High performance to move or process data Waveform is time-stamped via EVR Respective beam-quality data is attached to each waveform Agilent Acqiris 8-GHz, 10-Bit DC282 cPCI Digitizer Module

Dr. Gunther Haller XES Controls & 11 July D Pixel Detector Data Acquisition 312 Mbytes/sec raw pixel data at 120 Hz 1 day: 27 Tbytes Data is moved from detector-specific front-end board to XES DAQ box via 4 x 2.5 Gbit/sec fibers XES DAQ box contains custom SLAC CE-board Virtex-4 FPGA 2 PowerPC processors RLDRAM 12 Gbytes/sec cpu-data memory interface 10-G Ethernet science data interface 1-G Ethernet control interface EVG timing fiber interface 120-Hz beam-data interface Realtime correction of raw pixel data

Dr. Gunther Haller XES Controls & 11 July Machine Interface PPS Standard Allan-Bradley and Pilz PLC’s, implemented by machine PPS group MPS Standard LCLS MPS pizza-box, inputs from valves, shutter 120 Hz Beam-Quality Data Dedicated ethernet or reflective memory Timing System EVR PMC card receiving fiber from LCLS EVG master module

Dr. Gunther Haller XES Controls & 11 July Applications/Software/Archive RTEMS Operating System Tasks Already ported to VME IOC (MVME6100) Porting to cPCI IOC in progress EPICS Device Support Camera Motion Vacuum Hall Sensor Temperature VME ISEG High-Voltage module cPCI cPCI Acqiris waveform sampling module Xantrex low-voltage supply (25V, 30A) EPICS Databases and EDM Screens

Dr. Gunther Haller XES Controls & 11 July Applications/Software/Archive (con’t) Archive Use standard EPICS archiver for slow controls DAQ archive requirements mostly complete Collaboration with LSST to decide on underlying tools Xrootd, MySQL, Berkeley DB etc. Preliminary design started. High Level Applications Camera centroid finding Channel archiver Archiver viewer Alarm handler Snapshot/compare/restore Integrated user interface for experiment Spectrometer waveform processing

Dr. Gunther Haller XES Controls & 11 July Racks Standard LCLS double-racks Air-cooling Plan to have all electronics in hutch Exceptions are PPS & user- interface racks in control room area

Dr. Gunther Haller XES Controls & 11 July XES Hutch X-Ray Transport (Photon Beam) SCCS XES private subnet XesCon Channel Access Gateway Data Monitor EELOG Beam Line Processor XES Data Cache Linux OS VME SBCRTEMS PC Linux OSPC EVR VME Beam Line Data PMC 1 Gb E 1 Gb Enet TOF Spectrometer 2D Pixel Detector 2 DAQ Channels SBC DAQ CE Module DAQ PPC 10 Gb Enet Experiment IOCs Controls IOCs & Controllers VME SBC RTEMS 1 Gb Enet Experiment Chamber cPCI ADC RTEMS Front End Board 1 Gb E 2.5 Gb Fiber 1 Gb E SLAC WAN (Ethernet) T-fiber 1 Gb E cPCI SBC 120Hz Beam Data Timing Strobe/Trigger Timing EVG (Fiber) 120Hz Data Exchange Channel Access (Ethernet) XES Hutch Controls & DAQ Architecture

Dr. Gunther Haller XES Controls & 11 July Organization XES Controls & DAQ Systems Manager: G. Haller Schedule/Budget: Bob Sass Online Manager: Amedeo Perazzo (REG) Controls Manager: David Nelson (REG) Controls Software Lead: Sheng Peng Racks/Cabling/AC: Ray Rodriquez (REG) DAQ Manager: Chris O’Grady (REG) Data Management: Steffen Luitz (SCCS) Tasks are allocated to control division engineers where appropriate PPS, MPS, EPICS

Dr. Gunther Haller XES Controls & 11 July Schedule - Milestones Preliminary Design ReviewAug 08, 07 Final Design ReviewDec 01, 08 Start Production Hardware Purchases Dec 01, 07 Software Final Design Start Nov 01, 07 Start Installation in NEH (L3 PO)Apr 16, 08 First X-Ray into NEH (L3 PO)Sep 02, 08 Start Installation in FEH (L3 PO)Aug 20, 08 (Gantt charts in review support documentation) L3 PO: Level 3 Milestone, Project Office

Dr. Gunther Haller XES Controls & 11 July Photon Systems Controls Budget (Before Contingency) TEC: Total Estimated Cost OPC: Other Project Cost TPC: Total Project Cost

Dr. Gunther Haller XES Controls & 11 July Summary Described XES Controls & DAQ Architecture Selected Specific Controller Candidates for most Areas Moving and Processing Science Data is Key Data- Acquisition task AMO data acquisition via 10-bit 8-GHz cPCI waveform sampling modules 2D-Pixel detector acquisition via SLAC XES DAQ Module Presented Budget and Schedule No Technical Risk Items Controls and DAQ will be in place when required