1 Construction Claims in Residential Houses in Saudi Arabia Presented by Adel Al Rabee.

Slides:



Advertisements
Similar presentations
FACTORS AFFECTING CONSTRUCTION COSTS IN SAUDI ARABIA By Yaser Abdulla Al-Juwairah Presented by Shaikh Imran Abdul Qayyum Gani.
Advertisements

ABC Change Orders College of Environmental Design
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Market Research Ms. Roberts 10/12. Definition: The process of obtaining the information needed to make sound marketing decisions.
King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management Presented to: Dr. Sadi Assaf CEM 520 Class Causes.
Summary of “Factors Affecting Construction Practices in Makkah, Saudi Arabia” Written by: Sami Barhamain October 1986 (CEM 520) Presented by: Ehab A. Qahwash.
Joint Ventures in Construction Firms in Saudi Arabia By Kamal Khalil Khairaddin Abbasi A thesis paper summary Summarized by Mahdi Fida Al-Adel.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS DHAHRAN, SAUDI ARABIA Construction Engineering & Management CEM-520 CHANGE ORDERS IN CONSTRUCTION PROJECTS.
Presentation for Thesis of Master Degree Done by Ali Abdullah Al Salman CEM – 520 Term Project (Paper Presentation) Assessments of Risk Management Perception&
Factors Governing Housing Construction Costs in Saudi Arabia Abdelrahman Al-Gwaiz Kamal Al Dihan Faisal Al Ankary.
Change Orders in Construction Projects in Saudi Arabia Presented by Samer Al-Jishi & Hussain Al-Marzoug CEM 520 Term Presentation January 2007.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Three Cert IV - M. S. Martin January 2012.
Overhead Costs in Building Construction in Saudi Arabia Mohammad Al-Shahri Ahmed Al-Ojairi.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Presented By: Wasel A. Al-Muhammad 24 December 2002 by Ahmad I. Al-Musallami MS Thesis: CEM, KFUPM, 1992.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
TOOL TO DESIGN FOR CONSTRUCTION WORKER SAFETY An Article Written by Gambatese, Hinze and Haas 1997.
RESEARCH METHODS Lecture 19
Cost Implications of Architectural Design Variables Ahmed S. Al Zahrani December 2005 King Fahd University of Petroleum & Minerals Department of Construction.
Abdallah M. Al-Mahasheer
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Compilation and interpretation of primary and secondary sources of information. The integration of different sources will consolidate the write up of the.
WRITING A RESEARCH PROPOSAL. RESEARCH PROPOSAL Any research study should have a proper proposal in written form before it is actually carried out It is.
CONTRACT DOCUMENTS DISCREPANCY IN THE ROYAL COMMISSION BUILDING PROJECTS AT JUBAIL By: AHMAD SAID AE-KHAMIS CEM 520 Presented by Abdul-Mlik M Al-Saeed.
ولقد خلقنا السماوات والأرض وما بينهما في ستة أيام وما مسنا من لغوب (سورة ق )
CEM 520: Construction Contracting and Administration 03 June 2007
© Prentice Hall, 2003 Business Communication TodayChapter Finding, Evaluating, and Processing Information.
© Prentice Hall, 2005 Excellence in Business CommunicationChapter Planning Business Reports and Proposals.
Problem (Question) (Difficulty). Decisions Problem (Question) (Difficulty) Decisions Research.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
An-Najah National University Graduating project II Delay in construction projects.
1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University.
DATA COLLECTION DATA COLLECTION Compilation and interpretation of primary and secondary sources of information. The integration of different sources will.
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
Chapter 8 Marketing Research. The Information Pyramid Info Advantage Information Parity Information Deficit.
FACTORS INFLUENCING IMPLEMENTATION OF MAJOR INFRASTRUCTURE PROJECTS IN KENYA: A CASE OF THE SOUTHERN BYPASS ROAD, KENYA By 1. Dr. Charles Wafula Misiko.
Presented by Mansour Ali Al-Zahrani Author: Ajibade Ayodeji Aibinu.
The Literature Search and Background of the Problem.
CONSTRUCTION ADMINISTRATION Construction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Workshop 2 – Administrative Structure Recycled Water Feasibility Study Rancho Murieta Community Services District January 8, 2008.
System Analysis-Gathering Requirements.  System analysis is the process of gathering info about existing system, which may be computerized or not, while.
CONSTRUCTION ADMINISTRATION Claims and Disputes Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate Program.
DATA COLLECTION DATA COLLECTION Compilation and interpretation of primary and secondary sources of information. The integration of different sources will.
College of Environment Design Construction Engineering Technology Assessment of Constructability Practice Among General Contractors in The Eastern Province.
Project Management Cross lifecycle Activity
MGT-491 QUANTITATIVE ANALYSIS AND RESEARCH FOR MANAGEMENT OSMAN BIN SAIF.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
© Pearson Education Canada, 2005 Business Communication Essentials, Canadian Edition Chapter Understanding and Planning Business Reports and Proposals.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
QUALIY MANAGEMENT PRACTICES AMONG A/E ORGANIZATIONS BY Gulam Farooq DEC 1997 Presented by: Hezam Al-Qahtani QUALIY MANAGEMENT PRACTICES AMONG A/E ORGANIZATIONS.
Interviews, Questionnaires, and control flowcharts Chapter 19.
RESEARCH METHODS Lecture 12. THE RESEARCH PROCESS.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
© Prentice Hall, 2005 Excellence in Business CommunicationChapter Planning Business Reports and Proposals.
Claims in Construction Projects
Causes of Disputes Prepared by : Ali Jamous Jasser Dwiekat
Variation Orders By: 1.majed bushnaq 2.mahmoud battat
Faculty of Postgraduate Studies and Scientific Research German University in Cairo Modeling to Reduce Variation Order in Construction Projects in Egypt.
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
Causes of Contractors’ Failure “ North West Bank” Graduation Project
Atuahene, B.T | Baiden, B.K | Agyekum, K
9/18/2018 Bids CONTRACTING Khamis…..
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Causes Of Contractors’ Failure In West Bank
An - Najah national university Civil engineering department
Supervisor: Eng. Mohammad abu neama
Faculty of Industrial Management CONCLUSIONS AND RECOMMENDATION
‘ Causes of Delay During Construction Phase at Palestine ’
Presentation transcript:

1 Construction Claims in Residential Houses in Saudi Arabia Presented by Adel Al Rabee

2 OUTLINE Objectives Objectives Methodology Methodology Results Results Conclusion & Recommendations Conclusion & Recommendations

3 RESEARCH OBJECTIVES Identify types of construction claims in KSA Identify types of construction claims in KSA Analyze severity and frequency of each type Analyze severity and frequency of each type Analysis causes of construction claims Analysis causes of construction claims Recommend solutions to eliminate or minimize claims Recommend solutions to eliminate or minimize claims

4 RESEARCH METHODOLOGY 1. Literature Search 2. Interviewing Involved Parties In Construction Projects 3. Preliminary Questionnaire Preparation 4. Survey Distribution 5. Data Gathering 6. Data Analysis 7. Recommendations

5 1 st Step: Literature Search First stage A comprehensive study of all types of construction claims Second Stage A literature search focusing on identifying claims causes A literature search focusing on identifying claims causes

6 2 nd Step: Interviewing Involved Parties In Construction Interviews and site visits to The Owner The Owner The Designer The Designer The Consultant The Consultant The Contactor The Contactor

7 3rd Step: Preliminary Questionnaire Preparation Develop a questionnaire to identifying The most important causes of claims The most important causes of claims The most frequent types of claims in single-family residential housing projects The most frequent types of claims in single-family residential housing projects

8 4the Step: Survey Distribution 20 Contractors 20 Contractors 19 Consultants 19 Consultants 5 Government offices from the Eastern Province 5 Government offices from the Eastern Province

9 5th Step: Data Gathering Printed copies to carry a two way communication tasks Printed copies to carry a two way communication tasks Questionnaire Questionnaire Interview Interview Hence, data was gathered through Hence, data was gathered through site visits site visits Interviews Interviews Discussions with owners, consultants, contractors and others involved in construction Discussions with owners, consultants, contractors and others involved in construction

10 6th Step: Data Analysis A computer statistical package (SAS) Tabulation and Cross Tabulation Tabulation and Cross Tabulation Statistical Techniques Statistical Techniques Ranking Ranking Correlation Correlation Significance Significance Statistical Result Statistical Result Coefficient of Variation Coefficient of Variation Correlation Correlation

11 7th Step: Results Disagreement Dispute Protest Claim Owner Contractor Construction Claims Stages

12 Most Frequent Causes Changes Order Claims Changes Order Claims Delay Claims Delay Claims Extra Work Claims Extra Work Claims Contractual Claims Contractual Claims 7th Step: Results

13 1. Payments schedule 2. Prepare the contract documents carefully 3. Owner should utilize consultant experience before signing the contract 4. Documents and written specifications to avoid ambiguities and conflicts between different parties 5. The government should establish a set of procedures to control the quality of the contractors and their construction work 7th Step: Recommendations

14 Questions