ACORDE REPORT Pedro Podesta UAS Mexico. Geometry ( No changes) Alignment (No changes) QA (No changes ) Shuttle (In progress) To do Outline.

Slides:



Advertisements
Similar presentations
5 th Workshop on ALICE Installation and Commissioning April 1 rst & 3 rd, CERN Muon Tracking (MCH) Conclusion of the February/March 08 ALICE COSMIC run.
Advertisements

11th April 2008TOF DA & ppChiara Zampolli. DAQ-DA Three DAQ-DAs implemented, deployed, validated, and tested: TOFda TOFnoiseda TOFpulserda DCS-DA One.
TOF offline and calibration A. De Caro (University and INFN of Salerno)
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
Far Detector Data Quality Andy Blake Cambridge University.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Tracking System at CERN 06 and 07 test beams Michele Faucci Giannelli.
Chiara Zampolli in collaboration with C. Cheshkov, A. Dainese ALICE Offline Week Feb 2009C. Zampolli 1.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
SSD Status P. Christakoglou (NIKHEF-UU) for the SSD collaboration Thanks to: Marco vL, Enrico, Mino, Marek and Massimo.
SVX Software Overview Sasha Lebedev VTX meeting 09/07/ SVX Software web page:
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
PHOS offline status report Yuri Kharlov ALICE offline week 7 April 2008.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
V4-20-Release P. Hristov 08/08/ Changes: v4-20-Rev-38 #85151 Memory leak in T0 DQM agent. From rev #85276 AliGRPPreprocessor.cxx: Port to.
STAR Collaboration Meeting Rene Bellwied – Wayne State University July 2004 SVT Calibration and STI tracking status An update of work since the SVT review.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
107-July-2008ALICE Offline Week EMCAL Offline Status J.L. Klay Cal Poly, San Luis Obispo Offline Week - 07/July/2008.
DQM status report Y. Foka (GSI) Offline week from pp to PbPb.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
HMPID offline status report D. Di Bari, L. Molnar, G. Volpe ALICE Offline Week, CERN, 22 June 2009.
T0 offline status Alla Maevskaya for T0 team 8 March 2011 ALICE offline week.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
EMCAL : Online Software Status 1) General info/intro 2) DCS-related: detector configuration, Data Points 3) DAQ: Detector Algorithms 4) QA, AMORE 5) Offline-related:
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
1 SDD offline status Francesco Prino INFN sezione di Torino ALICE offline week – March 15th 2010.
Features needed in the “final” AliRoot release P.Hristov 26/10/2006.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Forward Carriage Commissioning CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update1 ECAL PCAL FTOF Panel 1A FTOF Panel 1B Detector Status PMT.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Six modules Micromegas TPC beam test & Test bench 12/4/2012W.Wang_RD51 mini week1 D. Attié, P. Colas, M. Dixit, P. Hayman, W. Wang.
Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.
A. De Caro for the ALICE TOF Offline Group (University of Salerno and INFN)
PHOS offline status report Yuri Kharlov ALICE offline week 7 July 2008.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
 offline code: changes/updates, open items, readiness  1 st data taking plans and readiness.
ArgonneResult_ ppt1 Comparison of data and simulation of Argonne Beam Test July 10, 2004 Tsunefumi Mizuno
MICE Tracker Software A. Dobbs CM32 9 th Feb 2012.
D. Elia (INFN Bari)Offline week / CERN Status of the SPD Offline Domenico Elia (INFN Bari) Overview:  Response simulation (timing info, dead/noisy.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
D. Elia (INFN Bari)ALICE Offline week / CERN Update on the SPD Offline Domenico Elia in collaboration with H. Tydesjo, A. Mastroserio Overview:
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
10/8/ HMPID offline status D. Di Bari, A. Mastroserio, L.Molnar, G. Volpe HMPID Group Alice Offline Week.
V4-19-Release P. Hristov 11/10/ Not ready (27/09/10) #73618 Problems in the minimum bias PbPb MC production at 2.76 TeV #72642 EMCAL: Modifications.
ACORDE OFFLINE STATUS. OUTLINE ACORDE Visualization Raw Data Shuttle.
January 2009 offline detector review - 2 nd go 1 ● Offline – Geometry – Material budget – Simulation – Raw data – OCDB parameters – Reconstruction ● Calibration.
V4-18-Release P. Hristov 21/06/2010.
Christoph Blume Offline Week, July, 2008
The ALICE Cosmic Ray Physics Program
Marian Ivanov TPC status report.
An Automated calibration method from shower data
Simulation and Reconstruction code using Mathematica
Massimo Masera INFN sezione di Torino
TOF CALIBRATION DATABASE
v4-18-Release: really the last revision!
CLAS12 software workshop
Tracking System at CERN 06 and 07 test beams
Remaining Online SW Tasks
PCAL Cosmic Ray Tests Progress Report C. Smith μ U V W MODULE 2
ALICE Offline Week, CERN
TPC status - Offline Q&A
Cosmic-Ray Lithium and Beryllium Isotopes in the PAMELA-Experiment
مفاهیم بهره وري.
BESIII EMC electronics
西村美紀(東大) 他 MEGIIコラボレーション 日本物理学会 第73回年次大会(2018年) 東京理科大学(野田キャンパス)
Presentation transcript:

ACORDE REPORT Pedro Podesta UAS Mexico

Geometry ( No changes) Alignment (No changes) QA (No changes ) Shuttle (In progress) To do Outline

ACORDE 60 modules Resolution= (2 m x 0.4m x 0.1m ) We only know is module is fired PMT HV ~ 900 V Efficiency (HV) Pulse discriminator hardware controlled Upgrade underway (at least one Year)

Geometry AliACORDEv1.cxx Well description of the detector. Modules, supports, case plastic etc.. It is included by default now in the reconstruction/macros Thanks Federico …

Survey Alignment AliACORDEAlign.cxx The survey data Survey_865479_ACORDE Two points per module (will be better 3 to have the plane ) Alignment is per module (60 align modules ) Only z coordinate taken for now. No overlaps, average difference is 2 cm..

Alignment Macros  MakeACORDEFullMisAlignment.C  MakeACORDEResMisAlignment.C  MakeACORDEZeroMisAlignment.C Using gaussian distribution needed some real number From the survey

Alignment Need to check overlaps Put the data in OCDB Put x,y position or correct geometry. Thanks to Rafaelle

QA Remove all histograms from digits, hits, Energy. Keep only one histogram. We monitor rates online any big change is noticed quite soon, as for examples last week make a firmware update we realized something was wrong.

Shuttle We had some inputs missing from DCS and the preprocesor was failing it was a problem with ECS and the start of run. It was fixed (July 2008 ). Thanks to Mario Ivan chiara, Latchezar an Franco. For me was far from clear. No plans to change DA or update.

A few remarks -We need to include the QA objects in the OCDB and also alignment object -We do not miss any data from DCS,DAQ or HLT -For now we have no difference for high low flux runs, since ACORDE is for cosmics physics. - Due to the way ACORDE works we have no way to change threshold online. So for low or hi flux we can not change parameters, since the fired trigger will not be ACORDE. -RecoParams still missing. -Preprocesor and DA will not change -No second pass calibration for us. We have measured efficiency and need implemetation

To do - Finish alignment - RecoParams - QA Reference - Include the real efficiency All comments, very welcome