Naming Convention HFT PIXEL 12-June-2009 Updated 03/08/2013 By LG to include row and column information for Ultimate sensors.

Slides:



Advertisements
Similar presentations
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Advertisements

Status of Pixel Test Niigata University/RIKEN Kohei Fujiwara.
Z x 725 Sensor Mark 140 x Sensor Coordinates Bump Bond Pad Ø = 12/ FE PAD#2 110 x 210 LM Structure FE Chip Coordinates Bump.
2x2 module & stave layouts. 2 options “Small chip” “Big chip” Boundary between “small” and “big” is determined by the 6” sensor wafer layout that must.
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
1 Ladder assembly steps HFT PIXEL updated for ultimate chip ladders 2/12/2012 ladder fixture u.SLDASM.
Naming Convention HFT PIXEL 12-June pixel identification sector – ladder – chip - row - column 1-10in out1 out2 out Alternative.
Research and Development for the HFT at STAR Leo Greiner BNL DAC 03/15/2006.
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
Bump Bonding and Thinning of Hybrid Pixel Detectors Kiyoshi Tanida (RIKEN) Johann M. Heuser (RIKEN) PHENIX upgrade workshop, Aug 2002 Contents Bump bonding.
Sensor and ladder and dimensions dateChangeVersionwho 3/26/2013Updated with U2 fid positions 1.1LG.
Ladder assembly steps HFT PIXEL 1/04/2009 ladder fixture.SLDASM.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
1 ladder to sector out2 bond fixture HFT PIXEL 11/16/2008 ladder to out2 bond fixture.SLDASM.
Flashback Without a calculator, find the answer. 1. (7 × 7 − 3 × 6) ÷ ( ) ÷ 9.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
24 March 2014 The ups and downs of the MaPSA project March
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
F.Videbaek PXL geometry update. PXL ladder For realistic simulation it is essential to get the proper layout of ladders. Starting point 1.SW model 2.Material.
C.V. S.W. T.S. L.G. X.S. M.S. IPHC-LBL meeting, January 22, Probe Test Results for 5 wafers of Ultimate-2 sensors Outline:  Yield and wafer.
On a eRHIC silicon detector: studies/ideas BNL EIC Task Force Meeting May 16 th 2013 Benedetto Di Ruzza.
Grid References.
Matrix Multiplication The Introduction. Look at the matrix sizes.
You have 10 seconds to name…
$200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200.
Update on Bump Bonding GTK-Meeting Sep. 2, 2008 pr.
Quick look: 28th November 2007
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Objective: Today we will investigate the ‘magic’ in magic squares.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Align The Stars Continue.
Align The Stars Continue.
Align The Stars Continue.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.

Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
255` 255 0/9 3/9
255` 255 0/9 3/9
tab to select objects 0/9 3/9
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Align The Stars Continue.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Align The Stars Continue.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
255` 255 0/9 3/9
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
Tables Column 1 Column 2 Column 3 Column 1 Column 2 Column 3 Column 1 Basic Gold Column 1 Column 2 Column 3 Basic Black Column 1 Column 2 Column 3.
255` 255 0/9 3/9
Presentation transcript:

Naming Convention HFT PIXEL 12-June-2009 Updated 03/08/2013 By LG to include row and column information for Ultimate sensors

pixel identification sector – ladder – chip - row - column 1-10in out1 out2 out Alternative ladder naming in Orange

sector number STAR coordinates x z y

ladder naming follows right hand rule like the sector numbering Z positive out2 out1 out3 in Alternative ladder naming in Orange

chip naming on the ladder Z positive

pixel naming on the chip Z positive wire Bond edge column row 1-928