Polar Communications & Weather (PCW) Mission December 6, 2010 Guennadi Kroupnik, Martin Hebert CSA.

Slides:



Advertisements
Similar presentations
Environmental Application of Remote Sensing: CE 6900 Tennessee Technological University Department of Civil and Environmental Engineering Course Instructor:
Advertisements

The WMO Vision for Global Observing Systems in 2025 John Eyre, ET-EGOS Chair GCOS-WMO Workshop, Geneva, January 2011.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Barbara J. Ryan Director, WMO Space Programme.
ECMWF MetTraining Course- Data Assimilation and use of satellite data (3 May 2005) The Global Observing System Overview of data sources Data coverage Data.
Enhancing Resilience in a Changing Climate/ Renforcer la résilience en face de changements climatiques Earth Sciences Sector /Secteur des Sciences de la.
1 6th GOES Users' Conference, Madison, Wisconsin, Nov 3-5 WMO Activities and Plans for Geostationary and Highly Elliptical Orbit Satellites Jérôme Lafeuille.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Inventory & Evaluation of Space-based Instruments:
Meteorological Service of Canada – Update Meteorological Service of Canada – Update NOAA Satellite Proving Ground/User-Readiness June 2, 2014 David Bradley.
Earth System Science Teachers of the Deaf Workshop, August 2004 S.O.A.R. High Earth Observing Satellites.
TRMM Tropical Rainfall Measurement (Mission). Why TRMM? n Tropical Rainfall Measuring Mission (TRMM) is a joint US-Japan study initiated in 1997 to study.
Workshop On The Efficient Use Of The Satellite Orbital Resource
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
PHEOS PSRR Concept of Operations. 2 Scope The purpose of the PCW-UVI Concept of Operations (ConOps) is to communicate how mission systems will operate,
Lars Peter Riishojgaard Global Modeling and Assimilation Office/ Goddard Earth Science and Technology Center HIGH-LATITUDE WINDS FROM MOLNIYA ORBIT a mission.
1 GOES Users’ Conference October 1, 2002 GOES Users’ Conference October 1, 2002 John (Jack) J. Kelly, Jr. National Weather Service Infusion of Satellite.
Frank Stocklin Ron Vento Leslie Ambrose June 28,2001 SUPERNOVA/ACCELERATION PROBE (SNAP) Data Systems.
ATS 351 Lecture 8 Satellites
RADARSAT Constellation  Evolution of the RADARSAT Program (i.e. 3 satellites – 32 minutes separation);  Average daily global access of land and oceans.
EEE440 Modern Communication Systems Satellite Systems.
Polar Communications & Weather (PCW) Mission Aurora Borealis.
Status of the Polar Communications and Weather (PCW) mission to serve the Arctic A concept of Polar Communications and Weather (PCW) mission to serve the.
VENUS (Vegetation and Environment New µ-Spacecraft) A demonstration space mission dedicated to land surface environment (Vegetation and Environment New.
Remote Sensing of Mesoscale Vortices in Hurricane Eyewalls Presented by: Chris Castellano Brian Cerruti Stephen Garbarino.
This document is not subject to the controls of the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR)
 Introduction  History  Responsibilities  Policy Goals  Satellite Communications  Space Policy  Space Policy.
Lecture Week 5 Satellite Communications Fibre Optic Communications
Design & Operation of ABI for PCW 11GOESRJPSS J19.2, 8 January 2015 This document is not subject to the controls of the International Traffic in Arms Regulations.
NASA Goddard Space Flight Center Direct Readout Laboratory NPP/JPSS HRD/LRD Status Patrick Coronado NASA Goddard Space Flight Center directreadout.sci.gsfc.nasa.gov/ipopp.
Refinement of maritime users needs, Brussels December 18, 2002 The Galileo support to the Search and Rescue Programme (SAR/Galileo)
Joint Polar Satellite System Harry Cikanek Director, Joint Polar Satellite System March 18, Science Week.
→ Potential ESA- Roscosmos Cooperation in Education Activities.
Earth Observation, Navigation & Science Page 1 Capacity Final Presentation, , Estec, Noordwijk Report for WP 3300 WP 3300.
Retrieval of snow physical parameters with consideration of underlying vegetation Teruo Aoki (Meteorological Research Institute), Masahiro Hori (JAXA/EORC)
NOAA Satellite Conference April 8-12, 2013 Mary Kicza Assistant Administrator for Satellite & Information Services.
Indian Ocean METOC Imager (IOMI) Operational Concept Demonstrates Military Operational Utility and Enables Improved Global Weather Prediction Data to Naval.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Agency, version?, Date 2012 Coordination Group for Meteorological Satellites - CGMS Add CGMS agency logo here (in the slide master) Coordination Group.
Polar Communications & Weather (PCW) Guennadi Kroupnik (CSA)
Munawwar M. Sohul Dr. Taeyoung Yang Dr. Jeffrey H. Reed a
Polar Communications and Weather Mission Canadian Context and Benefits.
Space-Based Activities in Canada APSDEU-8 Montreal October 10-12, 2007 Mike Manore Environment Canada.
US BENEFITS. It Addresses Priorities The US and Canada have common scientific, economic and strategic interests in arctic observing: marine and air transportation.
GSFC GOES-R Notional End-To-End Architectures Satellite Direct Readout Conference for the Americas December 9 – 13, 2002 Miami, Florida Sandra Alba Cauffman.
1 IICWG, October 2007 RCM Capabilities for Ice & Sea-Ice Applications IICWG … G. Séguin, R. Girard, Y.Crevier.
Considerations for GOES-R Readiness in Canada
Overview of CEOS Virtual Constellations Andrew Mitchell NASA CEOS SIT Team / WGISS NASA ESRIN – Frascati, Italy September 20, 2013 GEOSS Vision and Architecture.
Modern Era Retrospective-analysis for Research and Applications: Introduction to NASA’s Modern Era Retrospective-analysis for Research and Applications:
NPOESS, Modis and AMSR-E Paul Seymour National Ice Center.
Future Integrated Satellite Architecture Brief to Third GOES-R Users Workshop Broomfield, Colorado Michael Crison NOAA Satellites and Information Service.
Introduction to satellite Communications Lecture (11) 12/24/20151Dr. Hassan Yousif.
Polar Communications & Weather (PCW) Mission Mike Manore, Louis Garand - Environment Canada Guennadi Kroupnik – Canadian Space Agency.
Satellite Oceanography Modified from a Presentation at STAO 2003 By Dr. Michael J. Passow.
The Evolution of Earth Observation in Canada - A Perspective Luc Brûlé Director General, Space Utilization Canadian Space Agency
LuNet Integrated Network Architecture for Sustained Human and Robotic Exploration Gary Noreen Telecommunications Architect Communications Architecture.
Presentation to Canada- Russia Intergovernmental Economic Commission Arctic and North Working Group May 27, 2011 Jack Rigley Director New Satellite Initiatives.
Satellites Storm “Since the early 1960s, virtually all areas of the atmospheric sciences have been revolutionized by the development and application of.
KMA Proprietary Material 4 th GOES-R Users’ Conference 1 Introduction to Communication, Ocean & Meteorological Satellite Hee-Hoon Lee Korea Meteorological.
Polar Communications & Weather (PCW) Mission Mike Manore, Louis Garand, David Bradley - Environment Canada Guennadi Kroupnik – Canadian Space Agency.
GEO and HEO weather satellites: natural partners Sixth GOES User’s Conference Madison, WI November 3-5, 2009 Louis Garand (EC) and PCW U&ST.
Overview of Climate Observational Requirements for GOES-R Herbert Jacobowitz Short & Associates, Inc.
Presented by G. Hena Mercy Sugirthem G. Hena Mercy Sugirthem M. Sharmila M. Sharmila.
Canada-U.S. Workshop on the Polar Communications and Weather (PCW) Mission ‘Extending GOES-R to the Arctic’
The ESA call for the 9 th Earth Explorer mission (EE9)
EUMETSAT 2 nd MTG User Consultation Workshop Locarno, April Introduction Observation Payload Imagery Missions (HRFI and FDHSI) Infra-Red Sounding.
Satellites: New Technologies and New Systems
COMPUTER NETWORKING 2 LECTURE 6: satellites technology.
Proprietary and Confidential – Use or distribution subject to restrictions on first page TerreStar Global Connectivity no matter where you are driving.
International Civil Aviation Organization
Global Positioning System
Presentation transcript:

Polar Communications & Weather (PCW) Mission December 6, 2010 Guennadi Kroupnik, Martin Hebert CSA

Outline Introduction Mission overview System level trade-offs Meteorological payload considerations Communications payload considerations Project status Challenges and Opportunities Conclusion 2

Mission Objectives Reliable communications services in the high latitudes (North of 70º) to ensure: –Security –Sustainable Development –Support to Northern Communities –Safety of the Air and Marine Navigation –Arctic Science Provide high temporal/spatial resolution meteorological data above 50º N in support of: –Numerical Weather Prediction (short to medium range) –Environmental monitoring, emergency response –Climate change monitoring Space weather monitoring 3

Mission Overview 2 satellites in HEO to provide: Continuous GEO-like imagery above 50º N (refresh rate 15 minutes) 24/7 High data rate communication services in Ka-band (X-Band under review) 12h period 63.4º Inclination Apogee: ~39,500 km Perigee: ~550 km 4

Areas of Interest (AoI) Meteo requirements pertain to the entire circumpolar domain Meteorological AoI: requirement >50º N: will provide Level 1b and 1c data that meets quality requirements Meteorological AoI: goal >45º N: will aim to provide Level 1b and 1c data that meets quality Communications AoI requirement Communications AoI Goal Image quality requirements met for viewing angles (local zenith angle) >70º 5

Met Products and Services Winds from sequences of images: high priority product, Surface type analysis: ice, snow, ocean, vegetation and surface characteristics such as emissivity, albedo, vegetation index, Surface temperature, detection of boundary-layer temperature inversions, diurnal cycle, Mid-tropospheric humidity/temperature sensitive channels for hourly direct assimilation complementing GEO radiance assimilation, Volcanic ash detection, Smoke, dusts, aerosols, fog in support of air quality models and environmental prediction, Total column ozone, Cloud parameters: height, fraction, temperature, emissivity, phase, effective particle size. 6

7 Seamless 24/7 broadband, two-way connectivity to allow uninterrupted data (IP) transfer, as well as video-conferencing and imagery transfer, including entertainment content. Support to science, resource exploration and exploitation activities, and Search and Rescue operations. Interoperability with existing communications services. Support to icebreakers and marine navigation in the Arctic. UAV Missions: − Command and Control link − Communications link Potential support to Air Traffic Management (ATM) and E- Navigation. Comms Services 7

Spacecraft Concept (Core mission) 8

System Level Trade-offs Phase-A trades-off analyses: Image Navigation and Registration (INR) Analysis, PCW Communication Payload (PCP) Beam Pointing Analysis, Increased Imaging Operations Analysis, Constellation and Orbit Definition Trade-Off, Payload and TTC Downlink Trade-Off, PCW Met Payload Data Downlink and Transfer Trade-Off, User terminal (UT) performance versus Space Segment Analyses, User Terminal Design and Performance Analysis, and Communications Network Topology Analysis. 9

Payloads Core mission: Ka – band 2-way High Data Rate communications payload (up to 12 Mb/sec), Addition of X-band is being evaluated, Imaging Spectroradiometer (20 channels, km VIS, 2 km IR), Space weather suit of instruments. Enhanced mission (under evaluation): Scientific meteorological or space environment instrument (4 PHEMOS Phase 0 studies), GNSS augmentation payload (provided by ESA), Air Traffic Management (ATM) payload (provided by ESA), Technology demonstration. 10

11 PCW Met Payload Phase A Baseline design (COM DEV-ABB) meets performance requirements but requires ~ 10 years of development Options analyses: –RFI: ITT. Raytheon, Thales, and Astrium –Canadian Concepts: COM DEV and ABB Outcomes of options analyses: –Validated payload performance requirements –Possible path to launch in 2017 based on low NRE approach IR detectors cooled by a mechanical cooler, –Cooler attached to the S/C

Communications Payload X-band, commercial Ka-band, and government Ka-band planned. Ka-band is also to support downlink for met data. Ka-band Forward Link: 4 commercial channels + 4 government channels. Ka-band Return Link: 1 commercial channels + 1 government channel + 1 mesh channel. Ka-band coverage area to be served by 4 user beams and one gateway beam. X-band coverage area to consist of one user beam with re-use of Ka-band gateway beam.

Canadian Comms Requirements Commercial Ka Frequency BandMinimum Throughput 57 Mbps Government Ka 15 Mbps 20 Mbps Government X Mbps Met Downlink Ka

Carrier & Spectrum Frequency BandEarth to SpaceSpace to Earth Gov. X Band* Commercial Ka Band Gov. Ka Band 7.9 – 8.4 GHz 7.25 – 7.75 GHz 29.5 – 30.0 GHz 19.7 – 20.2 GHz 30.0 – 31.0 GHz 20.2 – 21.2 GHz * The following restrictions apply to the X-band: Mobile Applications: MHz (downlink) MHz (uplink) Fixed Applications: MHz (downlink) MHz and MHz (uplink) 14 Met Downlink (Ka)26.15 – GHz200 MHz Bandwidth

Communications Architecture Comm Area of Interest Gateway Station Two Dual Ka & S band Antenna User Terminals m Antenna MET data transmission 15

Ground Segment 16

Project Status Phase 0 completed: September 2008 Phase A Approved: November 2008 Phase A contract awarded: July 2009 Phase A Major Milestones: –Phase A kicked-off: July 2009 –Technology Readiness Assessment Review: October 2009 –Mission Requirements Review: February 2010 –Preliminary System Requirements Review: June, 2010 –Met Payload Options Analyses: November 2010 –Phase A contract close out: March 2011 Critical Technologies development contracts award: March 2011 Phase B/C/D contract award: June 2012 (TBC) Launches: 2017 (TBC) 17

Challenges Sever radiation environment Complex thermal management Spacecraft life limited by the environment Potential significant orbit perturbations caused by 3 body interaction Significant upfront investments Up to 40 month lead time for the components of the Met Payload Applications development 18

Opportunities Orbit design (f.e. a modified Tundra Orbit) “Make or buy” trade-offs Business model: –Major Crown Project vs. PPP –Canadian mission vs. International Partnership: Launch Met Payload Ground Segment Systems and subsystems of the spacecraft Applications algorithms and products 19

Conclusion PCW represents an exciting opportunity to close the gap in global broadband communication services and meteorological observation coverage in the Arctic. PCW is an engine for development of new technologies, applications and capabilities. The mission is open for international collaboration. Interesting opportunities have been identified and actively pursued. The Phase A outcomes clearly demonstrate merits of the PCW mission for Canada and in the international context. The technical feasibility of the PCW system is well established. 20