© 2012 Pearson Prentice Hall. All rights reserved. FLEXIBLE BUDGETS AND OVERHEAD COST VARIANCES.

Slides:



Advertisements
Similar presentations
CHAPTER 14 Cost Allocation, Customer Profitability Analysis, and
Advertisements

©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 15 Overhead Application: Variable.
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs Chapter 11: Flexible Budgeting and the Management of Overhead and.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eleven Flexible Budgets and Overhead Analysis.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Flexible Budgets Distinguish between.
Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead.
2009 Foster School of Business Cost Accounting L.DuCharme 1 Overhead Variances and Management Control: II Chapter 8.
©2008 Prentice Hall Business Publishing, Introduction to Management Accounting 14/e, Horngren/Sundem/Stratton/Schatzberg/Burgstahler Introduction.
Flexible Budgets, Overhead Cost Variances, and Management Control
ACTG 321 Agenda for Lecture 14
Overhead Budgets n Most companies use flexible budgets to control overhead costs. –A flexible budget is not based on only one level of activity but is.
Flexible Budgets and Overhead Analysis Chapter 11.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Flexible Budgets and Overhead Analysis Chapter Eleven.
Copyright © 2015 Pearson Education, Inc. All Rights Reserved. Flexible Budgets, Overhead Cost Variances, and Management Control.
Flexible Budgets/Variances II Chapter Eight. Developing Budgeted Variable Overhead Allocation Rates Step 1: Choose the time period used to compute the.
© 2009 Pearson Prentice Hall. All rights reserved. Inventory Costing and Capacity Analysis.
Copyright © 2003 Pearson Education Canada Inc. Slide 7-91 Chapter 8 Flexible Budgets, Variances, and Management Control: II.
Flexible Budget, Overhead Cost Variances and Management Control
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead.
Introduction Overhead costs are a major cost area for many organisations. Planning and control of overhead costs is an ongoing challenge to managers.
Financial and Managerial Accounting
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 17 Flexible Budgets, Overhead Cost Management, and Activity-Based.
Planning of Variable and Fixed Overhead Costs Effective planning of VOH involves reducing non-value added costs & consumption of cost allocation bases.
Copyright © 2015 Pearson Education, Inc., All Rights Reserved Flexible Budgets, Direct-Cost Variances, and Management Control.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.
Ch.11 Exercises Norwall Company’s Flexible budget manufacturing overhead (in condensed form) is given below : The following information is available for.
Principles of Managerial Accounting Chapter 11. Static Budget Set at the beginning of a budgeting period and that is geared to only one level of activity.
1 Brenda Mallouk Overhead Variance Analysis Management Accounting One.
Flexible Budget, Overhead Cost Variances and Management Control Lecture 19 1 Readings Chapter 8,Cost Accounting, Managerial Emphasis, 14 th edition by.
Variances Short summary. Static Budgets A static budget ( master budget) is prepared for only one level of a given type of activity. All actual results.
Flexible Budgets and Standard Costs Chapter 23 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead 11-1 Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides.
Chapter 13 – Overhead and Marketing Variances
© 2009 Pearson Prentice Hall. All rights reserved. Flexible Budgets, Overhead Cost Variances, and Management Control.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e By Kim Langfield-Smith 11-1.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
ACC3200 STANDARD COSTING.
Chapter 16 Fundamentals of Variance Analysis.
Flexible Budgeting Chapter 07, 08
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
The Islamic University –Gaza
1 Chapter 10. Standard Costs. M11-Chp-10-1-Standard-Costs Edited May 24, Copyright © 2011, Dr. Howard Godfrey This file contains illustrative.
CHAPTER 8 Flexible Budgets, Overhead Cost Variances, and Management Control.
Chapter 22. Prepare a flexible budget for the income statement.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
Part 1 Study Unit 7 Review Jim Clemons, CMA.
CHAPTER 14 Cost Allocation, Customer Profitability Analysis, and Sales-Variance Analysis.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
Chapter 17 Overhead Cost Management Flexible Budgets.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Inventory Costing Dr. Hisham Madi. Inventory Costing  The inventory costing system that is chosen determines which manufacturing costs are treated as.
Cornerstones of Managerial Accounting, 5e.
11th Edition Chapter 11.
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead.
Variance Analysis: Manufacturing Overhead
Production Cost Variance Analysis
Flexible Budgets, Overhead Cost Variances, and Management Control
Flexible Budgets and Overhead Analysis
17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting.
Flexible Budgets and Overhead Analysis
Flexible Budgets and Overhead Analysis
Managerial Accounting
© 2008 The McGraw-Hill Companies, Inc., All Rights Reserved.
Flexible Budgets and Overhead Analysis
Flexible Budgets and Overhead Analysis
Flexible Budgets, Overhead Cost Variances, and Management Control
Flexible Budgets, Overhead Cost Variances, and Management Control
Flexible Budgets, Overhead Cost Variances, and Management Control
Presentation transcript:

© 2012 Pearson Prentice Hall. All rights reserved. FLEXIBLE BUDGETS AND OVERHEAD COST VARIANCES

© 2012 Pearson Prentice Hall. All rights reserved. Class Announcements  Assignment #2 due February 10 th (MyAccounting Lab); available on-line  Midterm – February 17 th (in-class)  Accounting Case Competition at SMU March 6- 7 (Halifax); one team of two-four 3 rd and 4 th year; please let know of interest by January  NEXT CLASS – Case: Body Glove; available on-line

© 2012 Pearson Prentice Hall. All rights reserved. Case Approach & Selection  Context  In what business that they are in  Who are the people involved  Timeframe for resolution  Issue(s) Identification  Main Issue(s) (high priority) – often identified  Sub-Issue(s) (low priority)  Approaches to the Issues

© 2012 Pearson Prentice Hall. All rights reserved. Cases 2014

© 2012 Pearson Prentice Hall. All rights reserved. Class Objectives 1. Determining the flexible overhead costs (variance and fixed) 2. Calculating and interpreting variable overhead variances 3. Calculating and interpreting fixed overhead variances

© 2012 Pearson Prentice Hall. All rights reserved. Flexible Budget: Overhead  Overhead is the most difficult cost to manage, and is the least understood.  Overhead variances involve taking differences between equations as the analysis moves back and forth between actual results and budgeted amounts.  Variable overhead—as efficiently as possible, plan only essential activities  Fixed overhead—as efficiently as possible, plan only essential activities, especially because fixed costs are predetermined well before the budget period begins; consider long term capacity

© 2012 Pearson Prentice Hall. All rights reserved. Flexible Budget: Variable Overhead Variance Analysis Illustrated

© 2012 Pearson Prentice Hall. All rights reserved. Flexible Budget: Variable OH Variances  Variable overhead flexible-budget variance measures the difference between actual variable overhead costs incurred and flexible-budget variable overhead amounts.  Variable overhead efficiency variance is the difference between actual quantity of the cost- allocation base used and budgeted quantity of the cost per unit of the cost-allocation base.  Variable overhead spending variance is the difference between actual and budgeted variable overhead cost per unit of the cost-allocation base, multiplied by actual quantity of variable overhead cost-allocation base used for actual output.

© 2012 Pearson Prentice Hall. All rights reserved. Flexible Budget: Fixed Overhead Variance Analysis Illustrated

© 2012 Pearson Prentice Hall. All rights reserved. Flexible Budget: Fixed OH Variances  Fixed overhead flexible-budget variance (spending variance) is the difference between actual fixed overhead costs and fixed overhead costs in the flexible budget.  Production-volume variance is the difference between budgeted fixed overhead and fixed overhead allocated on the basis of actual output produced. (denominator-level variance or the output-level overhead variance)

© 2012 Pearson Prentice Hall. All rights reserved. Flexible Budget: Production-Volume Variance  Interpretation of this variance is difficult due to the nature of the costs involved and how they are budgeted.  Fixed costs are by definition somewhat inflexible. While market conditions may cause production to flex up or down, the associated fixed costs remain the same.  Fixed costs may be set years in advance, and may be difficult to change quickly.  Contradiction: Despite this, examination of the fixed overhead budget formulae reveals that it is budgeted similar to a variable cost.

© 2012 Pearson Prentice Hall. All rights reserved. Class Objectives - Revisited 1. Determining the flexible overhead costs (variance and fixed) 2. Calculating and interpreting variable overhead variances 3. Calculating and interpreting fixed overhead variances 4. NEXT CLASS – Case: Body Glove; available on- line