EMC’s Offsite Computing Update HPC RAC 05 January 2012.

Slides:



Advertisements
Similar presentations
Multi-physics Multi-IC Ensemble Plan for 2012 Hurricane Season Zhan Zhang and Vijay Tallapragada NCEP/EMC HFIP Regional Ensemble Conference Call March.
Advertisements

Sustaining National Meteorological Services Dr. Louis W. Uccellini Director, National Weather Service Riverdale, MD June 18, 2013.
Numerical Weather Prediction Readiness for NPP And JPSS Data Assimilation Experiments for CrIS and ATMS Kevin Garrett 1, Sid Boukabara 2, James Jung 3,
1 NCEP Operational Regional Hurricane Modeling Strategy for 2014 and beyond Environmental Modeling Center, NCEP/NOAA/NWS, NCWCP, College Park, MD National.
LAPS Analysis & Software by Steve Albers. 2 Basic Solution LAPS coupled with MM5 NWP model Use diabatic initialization (“hot start”) Utilize parallel.
NEMS/GFS Overview Mark Iredell, Software Team Lead.
Statistical post-processing using reforecasts to improve medium- range renewable energy forecasts Tom Hamill and Jeff Whitaker NOAA Earth System Research.
“Where America’s Climate, Weather and Ocean Services Begin” NCEP CONDUIT UPDATE Brent A Gordon NCEP Central Operations January 31, 2006.
CHOICES FOR HURRICANE REGIONAL ENSEMBLE FORECAST (HREF) SYSTEM Zoltan Toth and Isidora Jankov.
DTC AOP GSI October 1, FY09 Funding Resource/Tasks AFWA (February January 2010): – GSI code management and support (1.1FTE)
Instituting Reforecasting at NCEP/EMC Tom Hamill (ESRL) Yuejian Zhu (EMC) Tom Workoff (WPC) Kathryn Gilbert (MDL) Mike Charles (CPC) Hank Herr (OHD) Trevor.
Tolman, December 1, 2014The NPS- looking forward, 1/10 The NCEP Production Suite Looking forward Hendrik L. Tolman Director, Environmental Modeling Center.
1 NGGPS Dynamic Core Requirements Workshop NCEP Future Global Model Requirements and Discussion Mark Iredell, Global Modeling and EMC August 4, 2014.
Presented by: Mark Iredell based on work done by Global Climate and Weather Modeling Branch 2014 NCEP Production Suite Review GLOBAL MODELING 1.
Exploitation of Ensemble Output (and other operationally cool stuff) at NCEP HPC Peter C. Manousos NCEP HPC Science & Operations Officer
NCEP Site Update WG-CSAB – Spring 2010 Allan Darling Deputy Director, NCEP Central Operations April 7-8, 2010.
Tolman, May 7, 2015MAPP Webinar, 1/14 Transition to operations at EMC What works and what does not work Hendrik L. Tolman Director, Environmental Modeling.
UKmet February Hybrid Ensemble-Variational Data Assimilation Development A partnership to develop and implement a hybrid 3D-VAR system –Joint venture.
Progress Towards a High- Resolution HWRF Samuel Trahan, Vijay Tallapragada (EMC/NCEP/NOAA) S.G. Gopalakrishnan and X. Zhang (HRD/AOML/NOAA)
Tolman and MehraCOPC WG/CSAB meeting 2013, 1/14 NCEP Coordinated Ocean Modeling COPC WG/CSAB meeting 2013 Hendrik L. Tolman and Avichal Mehra
Operational Global Model Plans John Derber. Timeline July 25, 2013: Completion of phase 1 WCOSS transition August 20, 2013: GDAS/GFS model/analysis upgrade.
1 Ensemble Reforecasts Presented By: Yuejian Zhu (NWS/NCEP) Contributors:
Status Report on Tier-1 in Korea Gungwon Kang, Sang-Un Ahn and Hangjin Jang (KISTI GSDC) April 28, 2014 at 15th CERN-Korea Committee, Geneva Korea Institute.
Donald Stark National Center for Atmospheric Research (NCAR) The Developmental Testbed Center (DTC) Wednesday 29 June, 2011 GSI Fundamentals (1): Setup.
Donald Stark National Center for Atmospheric Research (NCAR) The Developmental Testbed Center (DTC) Thursday 13 August, 2015 Downloading and Building EnKF.
National Weather Service National Weather Service Central Computer System Backup System Brig. Gen. David L. Johnson, USAF (Ret.) National Oceanic and Atmospheric.
Status of RSA LAPS/MM5 System Sustainment John McGinley, Steve Albers*, Chris Anderson*, Linda Wharton NOAA Earth System Research Laboratory Global Systems.
I.Boulder Community GSI Code Repository II.GSI Regression Test Suite III.GSI Code Release IV.GSI Community Support V.Collaborative Efforts.
1 Addressing Critical Skills Shortages at the NWS Environmental Modeling Center S. Lord and EMC Staff OFCM Workshop 23 April 2009.
64’th IHC, March William Lapenta,Naomi Surgi and Stephen Lord Environmental Modeling Center NOAA/NWS/NCEP Linking The HFIP Community With NCEP/EMC.
1 Global Model Development Priorities Presented By: Hendrik Tolman & Vijay Tallapragada (NWS/NCEP) Contributors: GCWMB (EMC), NGGPS (NWS)
Development of an EnKF/Hybrid Data Assimilation System for Mesoscale Application with the Rapid Refresh Ming Hu 1,2, Yujie Pan 3, Kefeng Zhu 3, Xuguang.
Hurricane Forecast Improvement Project (HFIP) Overview NOAA Hurricane Conference Ed Rappaport for Fred Toepfer and Bob Gall December 1, 2009.
1 Coupled Modeling for Seasonal to Interannual Presented By Suru Saha (EMC/NCEP) Contributors: Jack Woollen, Daryl Kleist, Dave Behringer, Steve Penny,
PetaApps: Update on software engineering and performance J. Dennis M. Vertenstein N. Hearn.
DTC HWRF Task AOP2009 & AOP /01/2009 Ligia Bernardet.
THORPEX Interactive Grand Global Ensemble (TIGGE) China Meteorological Administration TIGGE-WG meeting, Boulder, June Progress on TIGGE Archive Center.
Higher Resolution Operational Models. Operational Mesoscale Model History Early: LFM, NGM (history) Eta (mainly history) MM5: Still used by some, but.
1 “Where America’s Climate, Weather and Ocean Services Begin” FY16 Production Suite Plans Rebecca Cosgrove Chief, Production Management Branch, NCO August.
Tolman, May 13, 2015JCSDA NWS overview, 1/11 JCSDA Activities and Plans NWS overview & plans Hendrik L. Tolman Director, Environmental Modeling Center.
Summary of EMC-DTC Meeting June 18, DTC AOP 2010 Tasks to be continued from 2009: – WRF-NMM + WPP community support (Jamie Wolff) – Reference configurations.
Ligia Bernardet, S. Bao, C. Harrop, D. Stark, T. Brown, and L. Carson Technology Transfer in Tropical Cyclone Numerical Modeling – The Role of the DTC.
Higher Resolution Operational Models. Major U.S. High-Resolution Mesoscale Models (all non-hydrostatic ) WRF-ARW (developed at NCAR) NMM-B (developed.
Hurricane Forecast Improvement Project (HFIP): Where do we stand after 3 years? Bob Gall – HFIP Development Manager Fred Toepfer—HFIP Project manager Frank.
1 11/25/2015 Developmental Testbed Center (DTC) Bob Gall June 2004.
NAWIPS – AWIPS II Transition Update “Where America’s Climate, Weather, Ocean, and Space Prediction Services Begin” Brent Gordon NCEP/NCO/Systems Integration.
NRC Committee on the Assessment of the National Weather Service's Modernization Program “Where America’s Climate, Weather, Ocean and Space Weather Services.
10 October 2007 Brent Gordon NCEP Central Operations “Where America’s Climate, Weather and Ocean Services Begin” Asia-Pacific Satellite Data Exchange &
UCACN Model Advisory Committee: Kickoff Meeting Dr. William M. Lapenta Director, National Centers for Environmental Prediction NOAA/National Weather Service.
1 Group 1: Modeling and Data Assimilation Summary: 1. HPC access, HPC access, HPC access 2. resources: personnel inside (e.g. EMC) and externally funded.
CTB computer resources / CFSRR project Hua-Lu Pan.
1 National Environmental Modeling System (NEMS) Status M. Iredell and EMC Staff.
Toward GSI Community Code Louisa Nance, Ming Hu, Hui Shao, Laurie Carson, Hans Huang.
MyOcean2 First Annual Meeting – April 2013 WP 06 MONITORING & FORECASTING CENTRE for ARCTIC Laurent Bertino, NERSC MyOcean2 First Annual Meeting.
The Unidata-NCEP Partnership: Transferring Model Output and Software to the University Community Dr. Louis W. Uccellini Director National Centers for Environmental.
GEFS transition to EE Draft by Richard Wobus.
DTC Overview Bill Kuo September 25, Outlines DTC Charter DTC Management Structure DTC Budget DTC AOP 2010 Processes Proposed new tasks for 2010.
Ligia Bernardet NOAA ESRL Global Systems Division, Boulder CO University of Colorado CIRES, Boulder CO HWRF Initialization Overview 1 HWRF v3.5a Tutorial.
1 NCEP’s Climate Forecast System as a National Model “Where America’s Climate, Weather and Ocean Services Begin” 32 nd Climate Diagnostics and Prediction.
Towards Assimilation of GOES Hourly winds in the NCEP Global Forecast System (GFS) Xiujuan Su, Jaime Daniels, John Derber, Yangrong Lin, Andy Bailey, Wayne.
1 National Centers for Environmental Prediction: Where America’s Climate and Weather Services Begin Louis W. Uccellini Director, NCEP January 28, 2004.
NOAA Hurricane Forecast Improvement Project Development Fred Toepfer, HFIP Manager Bob Gall, HFIP Development Manager.
Central Operations Ben Kyger Acting Director / NCEP CIO.
Marine Modeling and Analysis Branch Ocean Waves.
Fostering Collaboration Between Operational NWP and Academic Communities Isaac Ginis University of Rhode Island 61 st Interdepartmental Hurricane Conference,
Architecture of a platform for innovation and research Erik Deumens – University of Florida SC15 – Austin – Nov 17, 2015.
HRRR Primary FAA-CoSPA NCEPESRL/GSD/AMB RAP Dev1 RAPv2 Primary HRRR Dev1 RAPv1 NCO RAP Dev2 RAP Retro HRRR Retro Retrospective Real-Time HRRR (and RAP)
Project Management Approach
Developmental Testbed Center: Governance highlights
UNIFIED GLOBAL COUPLED SYSTEM (UGCS) FOR WEATHER AND CLIMATE PREDICTION Saha-UMAC-09Aug2016.
Presentation transcript:

EMC’s Offsite Computing Update HPC RAC 05 January 2012

HPC DetailsAcctsAllocationAllocation UsedProjects GAEA -Cray XT6 -ORNL -Oak Ridge, TN (pendi ng) 6.2% of System resources (5.04M Core Hours per month) <1% Develop GDAS/GFS parallel capability Test GFS Semi-Lagrangian development CFS-L completion GFS coupled atm/ocean testing T-Jet -Linux -GSD -Boulder, CO ~10HWRF – 1380 Cores GDAS – 5400 Cores SL-GFS 3000 Cores, 5 user accounts HWRF – 2011: 4.7 M Corehours GDAS – 3000 Cores 2.0 M Corehours in Q1 and Q2FY12 SL-GFS – User applications have been approved. Still waiting for tokens being delivered to users. HWRF FY12 pre-implementation testing of 3-km moving nest HWRF ensembles GFS Semi-Lagrangian development/testing for FY12 HFIP Demo and FY13 operational implementation Preliminary development of 4d-Var component of Hybrid DA Preliminary testing of ENKF ensembles to week 1 & 2 medium range NWP UCSD San Diego Supercomputer Center -Linux -San Diego, CA 1TBD Develop 30 year Hindcast database using WAVE Model. Reanalysis of winds with high resolution runs in North Sea, Mediterranean Sea, Horn of Africa DOE Computer0n/a Marine Branch working on getting project started here

Accounts: – 31 EMC staff have accounts – Requests for 11 accounts are pending approval by NCO Initial Code Porting finished: – GFS Ops and Semi-Lagrangian low resolution models – GSI Ops – HWRF – NEMS/NMMB – NDAS – RSM – GODAS/MOM4 – NEMS I/O – Numerous production libraries compiled: w3lib, splib, iplib, bacio, bufrlib, and crtm – Two versions of sfcio, sigio and gfsio required to support big or little-endian data. Functional Equivalence Testing on different platforms are still being performed. Codes have NOT been optimized as yet. They are just being ported correctly first. EMC Model Transition Update

Plans are underway for porting the following systems: – HYBRID EnKF – RTOFS – WAVEWATCH III – NEMS GFS and GEFS – SREF – CFSRL Script Porting: – Porting scripts requires significant changes to syntax and takes much longer to port. – Plan is to have a unified script package for use on IBM and GAEA/ZEUS – Global forecast, chgres and post scripts are working – Work is being done on the Global prep, verification and archival scripts No end to end systems have been run. Disk Storage: – Request for 20TB of permanent disk space on fast scratch space to hold 18 months of data ingest to run full assimilation experiments: not yet obtained. EMC Model Transition Update

Problems with Porting: A.Most users have not been given batch job access. B.MPI-Gather does not work. C.Threading does not work. D.Slowness in running codes. Example: – We cannot get T1148L64 SLG to run above 160 tasks: aborts with no traceback – Tests indicate this is NOT a code issue – Cray has not responded to a request for help EMC Model Transition Update

Overall Problems Still Remain: Data transfers to/from Gaea remains a serious issue. It is not possible to transfer large amounts between Gaea and NCEP without using a third party system (Jet) as a relay—not efficient. Restricted Data Policy: – This is a serious issue since we cannot conduct development testing without a policy in place – Requires administrative management action (NCO working the issue and can provide status on request) EMC Model Transition Update

Overall Progress being made: Increase in the number of users that now have access to Gaea More documentation has been provided to NCEP All day user support workshop to be held Nov 1 at NCEP Plans to have reliable help desk support EMC Website set up for Model Transition Team Activities EMC Model Transition Update

Plans for Herc/Zeus being made: List of priority users being prepared for the TDS system Disk configuration plans for Zeus are being prepared, similar to the configuration on the CCS systems (scrub, noscrub, save, etc) Will require direct data transfers from the CCS machines to Zeus. Will require restricted data policy on Zeus. EMC Model Transition Update