Simulation on ILC undulator based source with liquid lead target Wanming Liu ANL.

Slides:



Advertisements
Similar presentations
ILC positron source simulation update Wanming Liu, Wei Gai ANL 03/20/2011.
Advertisements

Simulations with ‘Realistic’ Photon Spectra Mike Jenkins Lancaster University and The Cockcroft Institute.
Phase Changes.
State Changes AKA= Phase Changes. Review: 3 States of Matter Solid Liquid Gas.
Collimator Damage Adriana Bungau The University of Manchester Cockcroft Institute “All Hands Meeting”, January 2006.
Overview of 300 Hz Conventional e + Source for ILC Truly Conventional Collaboration ANL, IHEP, Hiroshima U, U of Tokyo, KEK, DESY, U of Hamburg NIM A672.
Calorimetry Review : Specific Heat, Latent Heat, & Temperature vs. Heat Input plot Chapter 14.
Unsteady Heat Transfer in Semi-infinite Solids Solidification process of the coating layer during a thermal spray operation is an unsteady heat transfer.
Simulations of the Rotating Positron Target in the Presence of OMD Field* S. Antipov+, W. Liu, W. Gai Argonne National Lab +also Illinois Institute of.
16 th June 2008 POSIPOL 2008L. Rinolfi / CERN CLIC e + sources status L. Rinolfi with contributions from F. Antoniou, H. Braun, A. Latina, Y. Papaphilippou,
R.Chehab/Posipol2008/Hiroshima, june POSITRON SOURCES USING CHANNELING FOR ILC & CLIC R.Chehab, X.Artru, M.Chevallier, IPNL/IN2P3/CNRS, Universite.
Undulator Based ILC Positron Source Studies Wei Gai Argonne National Laboratory CCAST ILC Accelerator Workshop Beijing, Nov 5 – 7, 2007.
Design of the Photon Collimators for the ILC Positron Helical Undulator Adriana Bungau The University of Manchester Positron Source Meeting, July 2008.
Simulation of Positron Production and Capturing. W. Gai, W. Liu, H. Wang and K. Kim Working with SLAC & DESY.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
1 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, --- BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima: T.Takahashi,
Key luminosity issues of the positron source Wei Gai.
Update on ILC Positron source study at ANL since the Durham/UK Meeting10/2010 Wan-Ming Liu, Wei Gai.
Current standing of the undulator based ILC positron source Wei Gai AWLC 14 FNAL, May
Global Design Effort 1 Sources Parallel Session Summary Jim Clarke STFC Daresbury Laboratory.
1 Alexander Mikhailichenko Cornell LEPP, Ithaca, NY Linear Collider Workshop of Americas ALCPG, September 30, 2009 Albuquerque NM LITHIUM LENS STUDIES.
Phase Changes.
Phase Changes Notes on 3.3 Temperature  Temperature will not change during a phase change.  Once a substance reaches the temperature required for a.
PROBLEM 1 Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
Ian Bailey Cockcroft Institute/ Lancaster University IWLC October 21 st, 2010 Overview of Undulator-Based Sources for LC.
Phase Changes.
R.Chehab/ R&D on positron sources for ILC/ Beijing, GENERATION AND TRANSPORT OF A POSITRON BEAM CREATED BY PHOTONS FROM COMPTON PROCESS R.CHEHAB.
Energy and Phase Changes. Energy Requirements for State Changes To change the state of matter, energy must be added or removed.
Status: Cooling of the ILC e+ target by thermal radiation LCWS 2015, Whistler, Canada 3 rd November 2015 Felix Dietrich (DESY), Sabine Riemann (DESY),
Lesson 7: Just A Phase Key Terms. Solid A solid has definite volume and definite shape. The particles in a solid are closely packed and vibrate in relation.
Update on ILC Production and Capturing Studies Wei Gai, Wanming Liu and Kwang-Je Kim ILC e+ Collaboration Meeting IHEP Beijing Jan 31 – Feb 2, 2007.
Positron Sources for Linear Colliders* Wei Gai JPOS 2009, Jefferson Lab, March 26, 2009 * Acknowledgement of contributions from the ILC and CLIC e+ collaborations.
Target studies for the ILC 300 Hz conventional e + source 29-May-2013 ECFA LC Workshop at DESY T. Omori Target study team: K. Yokoya (KEK), J. Urakawa.
Undulator Based ILC positron source for TeV energy Wanming Liu Wei Gai ANL April 20, 2011.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim Posipol Workshop, Orsay, France May 23-25, 2007 Work performed.
Positron Source for Linear Collider Wanming Liu 2013 DOE Review.
DO NOW Give an example of a physical and chemical change Physical Change Chemical Change 1. 2.
G.Kurevlev - Manchester meeting1 Collimators Material Damage Study Previous results In our group - Adriana Bungau’s thesis - heat deposition on.
R.Chehab/FCPPL2010/Lyon1 AN HYBRID POSITRON SOURCE FOR ILC -Collaboration IN2P3-IHEP, with BINP, KEK, Hiroshima-U, CERN- X.Artru, R.Chehab, M.Chevallier.
Spin Tracking at the ILC Positron Source with PPS-Sim POSIPOL’11 V.Kovalenko POSIPOL’11 V. Kovalenko 1, G. Moortgat-Pick 1, S. Riemann 2, A. Ushakov 1.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim ILC GDE Meeting DESY May 30 – Jun2, 2007 Work performed for.
Fluka Simulations: Electron spectrometer window for AWAKE Jose A. Briz and V. Vlachoudis.
Some Aspects on Compton Scheme Positron Source Study Wanming Liu ANL Tsunehiko OMORI KEK.
Positron production rate vs incident electron beam energy for a tungsten target
Update on e+ Source Modeling and Simulation
Preliminary result of FCC positron source simulation Pavel MARTYSHKIN
Test of Hybrid Target at KEKB LINAC
Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
P. Sievers/CERN. A. Ushakov/Univ. Hamburg. S. Riemann/DESY-Zeuthen.
Phase Changes.
Unsteady Heat Transfer in Semi-infinite Solids
Heat load at the ILC positron target and collimator system
Phase Changes.
Target R&D for JHF neutrino
Welding Processes Types of Welding Processes
Phase Changes “It’s just a phase”.
ILC RDR baseline schematic (2007 IHEP meeting)
Phase Changes.
Phase Changes.
Heat Simulations with COMSOL
Capture Efficiency vs Spot Size
Summary for the Sources working group
Changes of State Chapter 3 Section 3.
Phase Changes and Heating Curve of Water
Phase Changes.
Phase Changes.
Phase Changes.
Presentation transcript:

Simulation on ILC undulator based source with liquid lead target Wanming Liu ANL

Parameters Undulator: K=0.92, lu=1.15cm AMD: 6T-0.5T in 14cm, immersed target Target: 0.5X0 liquid lead Yield estimated at 125MeV using damping ring acceptance window. No photon collimator applied Distance from target to undulator is 500m

EGS4 and PARMELA results Yield is about 2.09 per 100m Energy deposition per captured e+ 54.8MeV Assuming 2e10 e+ captured per bunch then energy deposition per bunch is J in target without windows Assuming 2e10 e+ captured per bunch then energy deposition per bunch is J in target, J in upstream window (BN) and J in downstream window (BN ~4mm).

Parameters of liquid lead and BN window Energy required to heat the liquid lead from 600K up to boiling point(2022K): Q b =~197.7J/g J/cm^3 Latent heat for vaporization of lead: Q L =~871J/g 9877 J/cm^3 To heat the liquid lead from 600K into vapor needs Q v =Q b +Q L =~ J/cm^3 Maximum use temperature of BN is ~3000 o C The current window brazing material (?, from Omori,) will be melted at ~900 o C

Distribution of deposited energy density pumping at 10m/s Energy density goes over 2241J/cm^3 easily but stays bellow the point of vaporization. The lead will stays in liquid form. The energy density on window surface is high enough to bring the temperature over the melting point of brazing material for current configuration.

Distribution of deposit energy density pumping at 20m/s Energy density goes over 2241J/cm^3 by about 200 J/cm^3 which is far bellow the point of vaporization. Lead will stay in liquid form. Energy density on window surface stays bellow the point where temperature will exceed the melting point of brazing material without considering the heat conduction.

Distribution of deposit energy density pumping at 30m/s Energy density stays bellow 1600J/cm^3 in the target and the lead will stay in liquid form.

Heat transfer simulation result without considering the latent heat The effect of latent heat for vaporization is not included The liquid lead is pumping at 20m/s With heat conduction considered, the temperature on surface of the window is about 1800K and is higher than the melting point of current window brazing material.

Temperature distribution along the depth of target at the middle of bunch train when pumping speed is 20m/s Temperature on surface of window:~1800K Current brazing material melting point: ~1200K The temperature on window surface without considering the effect of energy deposition in window is about 600K above the melting point of brazing material when pumping speed is at 20m/s.

Heat transfer simulation result without considering the latent heat The liquid lead is pumping at 30m/s The temperature is bellow the boiling point of lead and thus the latent has no effect here

Temperature distribution along the depth of target at the middle of bunch train Temperature on surface of window:~1400K Beryllium melting point: 1560K The temperature on window surface without considering the effect of energy deposition in window is still higher than melting point of brazing material of current configuration

Heat density at the middle of bunch train for different pumping speeds. Even with speed as low as 10cm/s the energy deposited in target is still not enough to vaporize the lead.

Energy deposition density in both window and target Pumping speed is 10m/s 4mm thick BN window applied on both upstream and downstream of liquid lead target. Energy deposition profile for a train of 2625 bunches shows that the energy deposition in window is < 2000 J/cm^3 which can only increase the temperature of window by ~700K which is far bellow the maximum working temperature of BN,3000 o C. With 10cm/s pumping, the lead will be at its boiling point 2022K, adding 700K to the downstream window only bring the window up to 2722K. It is still more than about 500K bellow the maximum using temperature of BN

Summary Numerical simulations shows that the undulator based ILC e+ with liquid lead target with BN window will work (if the issue of melting of brazing joint can be overcome). The pumping speed can be as low as 10cm/s without vaporizing the liquid lead or melting the BN window.