Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 07/11/12.

Slides:



Advertisements
Similar presentations
International Civil Aviation Organization
Advertisements

Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
SOCM-2 Seminar Data Link Benefits Presented By: Dennis Addison, FAA
Federal Aviation Administration S1P1/P2 Production System: DCL Route Rules DCIT#32 16 April 2014.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
AOC/FOC Interface for Data Comm Production System
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #26 Plenary From: Matt Maki / DCL Trials Lead.
DARP.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Trials Activities/DTAP Update Schedule Timelines Matt Maki.
Federal Aviation Administration Data Communications Program Data Comm Trials and Production Requirements: High Level Impact Presented To: DCIT #23 Plenary.
12/01/2011 FEDERAL AVIATION ADMINISTRATION AIR TRAFFIC ORGANIZATION 1 Execution of Flow Strategies (XFS) (aka Go Button)
Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.
Harris.com Michael Earl Systems Engineering, Trials and OPR Trials Status and OPR Update.
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Data Link Communications
Data Communications Implementation Team (DCIT)
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Harris.com Alex Murray | DCIS Benefits Lead DCIT Brief Data Comm Benefits & Metrics Alignment with DC Program, NIWG, & NAC.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT25 Update To:DCIT25 Plenary From: Matt Maki Date:
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Federal Aviation Administration DCIT 39: S1P1 DCL E2E Summary DRAFT To: DCIT All WG From: Data Comm Production SE Date: DCIT 39, 11 March DRAFT.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #33 Agenda 6/4/2014 Harris – Washington, DC.
1 Departure Scenario 1 November 14, Scenario Overview Entry of Flight Data into AWIM SystemEntry of Flight Data into AWIM System –Embry Riddle.
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup.
Federal Aviation Administration Test Planning for AOC/FOC Interface for Data Comm Production System To: DCIT 29 From: Data Comm Production Sub-Team Date:
EWR DCL Trial Update Capt Gregg Kastman MD-11 Flt Trng Sup.
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT Meeting 08/24/2011.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #23 Plenary 05/09/2013 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Comm Production Summary vs. Trials: Presented To: DCIT WGs By: Production Sub-Team Date: March 13, 2014.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT 37 Plenary Agenda December 10, 2014 Harris Corp Washington, DC.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
Harris.com 02/01/2014 – 02/28/2015 Alex Murray | Systems Engineer DCIT 39 Plenary Health Monitoring Stats.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 08/22/12.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 2/1/13.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status Updates To:DCIT21 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Program Final Investment Decision (FID) – Update on May 30, 2012 Presented to:SC-214/WG-78 Plenary.
Courtesy Copy Messages DCIT WG meetings 3/6/2012.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
Federal Aviation Administration Subscriber Database (SDB) and Web Access To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 3/13/13.
Presented by: Roger Sultan, FAA, AFS-430 Date: October 11, 2011 Federal Aviation Administration FPAW 2011 AC Rewrite Plan.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
FAA NextGen Data Comm Tower Service: CPDLC DCL New Operator Introduction.
Federal Aviation Administration Test Planning for AOC/FOC Interface for Data Comm Production System To: DCIT 26 From: Data Comm Production Sub-Team Date:
Presented to: DCIT Flight Deck Working Group By: Andy Fry, Thane Inc. Date: October 12, 2011 Federal Aviation Administration Data Communications DCIT #10.
COPYRIGHT © 2013 BOEING. ALL RIGHTS RESERVED Identifying potential service enhancements to increase operator participation DCIT May 2013 Brad Cornell.
International Civil Aviation Organization
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
International Civil Aviation Organization
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup
Chapter 9 ICMP.
Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)
FANS (Future Air Navigation System) Flight Crew Procedures
International Civil Aviation Organization
Data Communications Program
Chapter 3: Open Systems Interconnection (OSI) Model
FAA Data Communications Program System Engineering
doc.: IEEE /454r0 Bob Beach Symbol Technologies
Operational Context and Use Case Focus Group
Presentation transcript:

Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 07/11/12

DCP SE AOC Sub-team 2 Federal Aviation Administration 11 July 2012 Recap Last Telecon Decisions- 7/02/12 Requirements for Production System (2015) 1.Add route string to DCL Courtesy Copy even if flight is Cleared as Filed, as FYI for AOC [Applies to both Trials and Production systems?] 2.FAA will send a new message (Gate ID Request message) to AOC when DCL is approved by controller. AOC will respond with Gate ID. Applies to both Trials and Production systems. 3.FAA will send the DCL Courtesy Copy to AOC when actual uplink is sent to pilot. Applies to both Trials and Production systems. 4.ICAO 2012 Flight Plan is a viable mechanism for AOCs to provide clearance delivery information to FAA, e.g., whether a specific flight will get a legacy PDC or DCL. New equipage/preference codes apply to Production system only. Trials will use Remarks field in current flight plan; no change for ICAO 2012 flight plan.

DCP SE AOC Sub-team 3 Federal Aviation Administration 11 July 2012 Gate ID Request : Summary 1.Scope –Gate ID Request message is designed to provide same functionality as in current response by AOC to PDC from FAA. No change to PDC exchange. –Gate ID Request/Response messages will be exchanged for all DCL flights –If users do not currently provide gate, only requirement for DCL is an AOC Host computer system response in the agreed to DCIT format. 2.Gate Changes –No requirement for users to provide unsolicited Gate ID messages for gate changes after the initial message exchange 3.Error Handling. –Same as today (for PDC) –If there is a mismatch or missing referent message number for an acknowledgement from AOC, no error will be returned by FAA

DCP SE AOC Sub-team 4 Federal Aviation Administration 11 July 2012 Gate ID Request : Summary cont’d 4.Gate ID Request Message from FAA to AOC Similar header to DCL Courtesy Copy with unique identifier as Gate ID Request message Flight Identification includes: Flight ID (e.g., XYZ123), Tail Number if available, and Departure Airport. Format being worked today 5.Response Message from AOC to FAA Similar header to Gate ID Request message with unique identifier as Gate ID Response message and sequence number from request message Flight Identification is same, e.g., Flight ID (e.g., XYZ123), Tail Number if available, and Departure Airport. Gate ID field content –If gate known, gate number is inserted into this field –If gate is unknown, “G” is inserted into this field. Format being worked today

DCP SE AOC Sub-team 5 Federal Aviation Administration 11 July 2012 Next Steps Determine if any other DCIT document changes needed DCIT Plenary July 12 Coordination with larger community for ICAO 2012 flight plan codes in Field 18/DAT Questions?

DCP SE AOC Sub-team 6 Federal Aviation Administration 11 July 2012 Back Up

DCP SE AOC Sub-team 7 Federal Aviation Administration 11 July 2012 Pilot Flight Data Initial Departure Clearance : Gate ID and CC messages 4. Clearance for approval 11. Departure Clearance Request AOC/FOC Automation AOC/FOC Automation Data Comm 2. Flight Data Avionics 12. Departure Clearance 15. Departure Clearance Response 3. Flight Strip 5. Approved Departure Clearance Pilot will request DCL x minutes before departure Pilot will request DCL x minutes before departure 6. Session Start 8. Gate ID Response 7. Gate ID Request Tower Controller Tower Controller 1. Flight Plan Circa P-Time- 60 min Circa P-Time- 30 min Circa P-Time- 20 min 9. Revised Flight Data 10. Rev Approve Clearance 13. DCL CC This case shows a revision occurs before pilot downlink request. Is the same as nominal without any change. 14. DCL CC Ack

DCP SE AOC Sub-team 8 Federal Aviation Administration 11 July 2012 Fld 10a and 18 – Proposed Codes for Data Comm 8 Cas e User Preference DescriptionICAO 2012 Fld 10a ICAO 2012 Fld 18 New ? Codes for DAT/ Comments 1PDC onlyAll flights at this airport get PDC E3J4* Z DAT/PIdentifies domestic PDC preference 2DCL onlyAll flights at this airport get DCL E3J4* Z DAT/FIdentifies domestic DCL FANS 1/A. If no DAT/F, then assume J4 applies to Oceanic 3DCL/PDCDCL if available; PDC if not J3J4E3* Z DAT/FP^*Any order. ^FP order shows preference, e.g, FANS DCL then PDC 4VoiceNo PDC or DCLE3J4*Equipped but not receiving PDC or DCL. No requirement to file Fld 10 5Oceanic onlyFANS CPDLC in Oceanic airspace E3J3?No requirement to file Fld 10a?