Measure Up! 6 Sigma and Libraries Lesley Farmer and Alan Safer CSU Long Beach / 1.

Slides:



Advertisements
Similar presentations
Six Sigma Green Belt: Overview Robert Setaputra. What is Six Sigma? Six Sigma is the relentless and rigorous pursuit of the reduction of variation in.
Advertisements

Project Storyboard Template
How to Plan for the DMAIC Approach Gain buy-in of leadership Appoint team Members with variety of skills & experience Some who know the process to be studied.
Six-Sigma Management and Lean Tools
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Chapter 8: Project Quality Management
Lean Six Sigma: A Vision
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
1. 2 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
Measure Up! Data Analytics and Libraries Alan Safer CSU Long Beach Lesley Farmer CSU Long Beach
Lean Six Sigma A Methodology for Cultural Change and Continuous Process Improvement (CPI)
Overview of Lean Six Sigma
Overview of DMAIC A Systematic Framework for Problem Solving
Space and Airborne Systems NDIA/SEI CMMI Technology Conference Presented by N. Fleischer 1 Raytheon’s Six Sigma Process and Its Application for CMMI By.
Lean Six Sigma Black Belt Blended Learning Program Course Description Blended Learning FLEXIBLE: Class sessions can be 100% online or augmented with live.
Development of Six Sigma
Managing Project Quality
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Six Sigma - the Latest Approach in the Ongoing Development of Strategies for Business Improvement Use of analytical methods has grown steadily for over.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
1 Industrial Design of Experiments STAT 321 Winona State University.
Total Quality Management. 2 A philosophy that involves everyone in an organization in a continual effort to improve quality and achieve customer satisfaction.
“Safety is a Measure of Success”
ENGM 620: Quality Management 26 November 2012 Six Sigma.
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
Σ Six Sigma: Process Perfection Customer Satisfaction through Error Elimination.
CMMI Technology Conference and User Group November 2003 Experiences with Leveraging Six Sigma to Implement CMMI Levels 4 and 5 Jeff Facemire & Hortensia.
Welcome to Lean Six Sigma Green Belt Training
Black Belt Project Storyboard Template
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Introduction to Six Sigma. Learning Objectives The Need for Six Sigma Six Sigma - Vision, Philosophy and Statistical Method Breakthrough Strategy and.
 Name  Work experience  Background in continuous improvement activities  Expectations 1.
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
PRIMO Limited & 6 Sigma By HKU SPACE 6 Sigma Consultant Firm 30-May-2006.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Six Sigma Overview Presented by: >. Agenda What is Six Sigma? History of Six Sigma Six Sigma Methodology When to use Six Sigma? Different Six Sigma belts?
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
1 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
Project Quality Management.  Define project quality management.  Describe quality planning and its relationship to project scope management.  Discuss.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
UNIT 5.
© 2003 Six Sigma Academy0 The Roles of Six Sigma Champion Workshop.
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Analyze Wrap Up and Action Items
TM 720: Statistical Process Control DMAIC Problem Solving
Control Phase Wrap Up and Action Items
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
Six Sigma Approach.
Six Sigma.
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Chapter 2 Six Sigma Installation
Quality Certification
Lean Six Sigma DMAIC Improvement Story
OPS/571 Operations Management
Lean Six Sigma DMAIC Improvement Story
Quality Management Six Sigma
Six Sigma. Six Sigma What is Six Sigma? Philosophy: We should work smarter, not harder. Business strategy: We gain a competitive edges in Quality,
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Measure Phase Wrap Up and Action Items
Six Sigma Introduction 1 1.
Lean-Green belt six sigma program
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Measure Up! 6 Sigma and Libraries Lesley Farmer and Alan Safer CSU Long Beach / 1

Does this sound familiar?  I can’t get the articles I need!  The catalog says the book is there, but I can’t find it.  What does it take to get a new book on the shelf before it becomes old?  No one uses our self-check out system.  Should we subscribe to ebooks?  Why isn’t online reference service used? 2

The Answer May Be 6 Sigma!  …which is a Goal, a Measure, a Process, and a (set of) Tool(s)  6 Sigma is a management methodology Customer focused Data driven decisions Breakthrough performance gains Validated bottom line results 3

Example: Normal Distribution IQ Test  Mean = 100  SD =15  99.7% of people are between  = [mean – 3 SD, mean + 3 SD]  = [100 – 3(15), 100+3(15)]  = [100 – 45, ] = [55, 145]  95.4% of people between [70,130]  68.2% of people between [85, 115] 4

  PPM Sigma Sigma is a statistical unit of measure which reflects process capability. The sigma scale of measure is perfectly correlated to such characteristics as defects-per-unit, parts-per million defective, and the probability of a failure/error. (Distribution Shifted ± 1.5  ) Process Capability Process Capability Defects per Million Opportunities

6 Why “Quality Improvement” is Important: A Simple Example A visit to a fast-food store: Hamburger (bun, meat, special sauce, cheese, pickle, onion, lettuce, tomato), fries, and drink. This product has 10 components - is 99% good okay?

7 Some Commercial Applications  Reducing average and variation of days outstanding on accounts receivable  Managing costs of consultants (public accountants, lawyers)  Skip tracing  Credit scoring  Closing the books (faster, less variation)  Audit accuracy, account reconciliation  Forecasting  Inventory management  Tax filing  Payroll accuracy

8 Six Sigma  A disciplined and analytical approach to process and product improvement  Specialized roles for people; Champions, Master Black belts, Black Belts, Green Belts  Top-down driven (Champions from each business)  BBs and MBBs have responsibility (project definition, leadership, training/mentoring, team facilitation)

9 What Makes it Work?  Successful implementations characterized by:  Committed leadership  Use of top talent  Supporting infrastructure  Formal project selection process  Formal project review process  Dedicated resources  Financial system integration  Project-by-project improvement strategy

Data Driven Decisions Y Dependent Output Effect Symptom Monitor Response Why should we test or inspect Y, if we know this relationship? X1... XN Independent Input-Process Cause Problem Control Factor To get results, should we focus our behavior on the Y or X ? f (X) Y=

Basic Implementation Roadmap Understand and Define Entire Value Streams Deploy Key Business Objectives - Measure and target (metrics) - Align and involve all employees - Develop and motivate Define, Measure, Analyze, Improve Identify root causes, prioritize, eliminate waste, make things flow and pulled by customers Control -Sustain Improvement -Drive Towards Perfection Identify Customer Requirements Vision (Strategic Business Plan) Continuous Improvement (DMAIC) Identify Customer Requirements

DMAIC  DMAIC is a structure problem-solving technique consisting of the following steps:  Define  Measure  Analyze  Improve  Control  DMAIC is usually associated with six sigma, but it can be used with any business or process improvement effort 12

13

Problem-Solving  What do you want to know?  How do you want to see what it is that you need to know?  What type of tool will generate what it is that you need to see?  What type of data is required of the selected tool?  Where can you get the required type of data?

Projects  Essential part of DMAIC  Needs: quality variation, unsustainable costs, ID process capability and problem basis  Breakthrough opportunity  Financial systems integration  Value opportunity of a project must be clear  Project selection  Project management 15

Case Study: University of Arizona  Study ILL article borrowing process  Why: improve service to meet increased demand  Drivers: customer expectations, cost reduction, leverage technology  Personnel: leadership, staff involvement 16

Define Phase  Reduce costs  Focus on articles (many processes possible)  ID customer expectations relative to turnaround time, scan quality, priority value  Fill 80% of article requests within 3 days  Premise: no additional staff or $ 17

Measure Phase  Current process capabilities through flow charts, performance matrixes, data collection sheets 18

19

Analyze Phase  ID root causes of problems in order to eliminate or reduce them  Tools: fishbone diagram, histogram, Pareto chart, XmR chart 20

21

22

23

Improve Phase  Cause: variations and delays in searching and delivery on evenings/weekends  Cause: lack of lender staff evenings/weekends  Cause: Choosing right ISSN  Lags in searching difficult requests  Pilot/evaluate solutions based on impact, cost, support

Implemented Solutions  Use downtime of other evening/weekend staff  Replace student workers with FT/temp staff  Add staff hours on evenings/weekends  Train  Schedule search requests  Encourage other libraries to increase evening/weekend staff, and use ODYSSEY 25

Control Phase  New quality standards  Responsibility/timeline for implementation  Method to measure user satisfaction  Methods to measure process control and capability  Progress reports 26

27

Lessons Learned  Increased cost for document supplier wasn’t worth it  Saved $2/request (even with more requests)  Use ILL system that tracks detailed data including processing steps  Get monthly data summary 28

Next Steps  Let’s work together!  Lesley Farmer  Alan Safer 29

Q&A 30

31

2.2 The Define Step 32

33 A process map or value stream map may also be prepared. These should be completed by at least the end of the Measure step.

34 The Define Step

The Define Tollgate 35

The Measure Step  Purpose is to evaluate and determine the present process state  Identify key process input variables (KPIV) and key process output variables (KPOV)  Data – from historical records, from sampling, from observational studies  Histograms, box plots, Pareto charts, scatter diagrams, stem-and-leaf diagrams may all be useful  In some businesses, the measurement system must be developed  Measurement systems capability may be important 36

The Measure Tollgate 37

The Analyze Step  Determine cause-and-effect relationships  Sources of variability – common cause versus assignable cause  Tools – control charts, hypothesis testing, confidence intervals, regression models, failure modes and effects analysis  Discrete event simulation 38

The Analyze Tollgate 39

The Improve Step  Process redesign to reduce bottlenecks  Mistake-proofing  Statistical tools – particularly designed experiments  DOX can be applied to either the physical process or a computer model of the process  Pilot test the solution to confirm that it will solve the problem 40

The Improve Tollgate 41

The Control Step  Complete all remaining work on project  Provide the process owner with a process control plan  Training documents (if appropriate) should be provided  Methods and metrics for future audits  Transition plan to the new process might include a validation step 42

The Control Tollgate 43