Primary & Sub deduct surveys Andrew Stone/Chris Warner.

Slides:



Advertisements
Similar presentations
Marketing Research and Information Systems
Advertisements

Mod 0260 Post-Emergency Claims: Implementation Update Transmission Workstream - December 2009.
Third Energy Package for Change of Supplier 2009/73/EC.
Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
Potential reforms to the CoS meter reading process for smart gas meters Setting the open letter in context Rachel Hay 16/01/14.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Article 5 of the Energy Services Directive Edward Green.
Sub-deduct Networks Update Jessica Jarvis 26 th June 2014.
1 Packaging bio- methane connections for the future Dan Anderson CEng 11 th January 2012.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
22 March 2007 Slide 1 Sub-deduct Networks John McNamara.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
1 Chapter 4 Marketing Research and Information Systems.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Environmental Standing Group. 2 Background  Ofgem issued an open letter on 15 th April 2008 to consider issues associated with carbon assessment for.
 Scottish Household Survey Review Outcomes John Tibbitt Senior Principal Research Officer Development Department, Analytical Services.
Customer Charge On behalf of all DNs 25 October 2010.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Supply chain management Or logistic. Definition Supply chain management or logistic involves controlling the sequence of activities in the distribution.
Metering Standards and Impact on Shrinkage Issue for Consideration 1 October 2009 for Gas Transmission Workstream.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
Gas SO Incentives For 1 April 09 Transmission Workstream 3 July 2008.
“Amendment of Network Entry Provisions at the European Interconnector NTS sub- terminal at Bacton" Transmission Workstream 1 st December 2005.
Mod Proposal Prevention of "Timing Out" of Authority decisions on Modification Proposals Nick Reeves.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Industry Dialogue on xoserve Services 14 th September 2007.
PARCA Demonstration Data Information Flow Diagram Footnote:- No set timescales – timescales will be agreed by the Project Team Phase 0 Phase 1 Phase 2.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Background Current balance of LDZ System and Customer charges
Transmission Workstream 6 January 2011
Gas System Operator Incentive Review
Annual Review of Shrinkage and Leakage Model
Modifications iGT 039 and GT 0440 re iGT Agency Services background
Modification Proposal 0283 Update
Review of UNC Section Q “Emergencies”
Code Governance Review UNC Modification Proposals
Performance Indicators
UNC Trader User – Licence obligations
Modification Proposal 0192 – Draft Business Rules.
Chris Warner Network Code Manager
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
Exit Capacity Substitution and Revision
Consideration of issues raised by UNC Modification Proposal 0244
Chris Warner UNC Modification Panel 21 December 2017
Joint Office Presentation for Modification 0678
Topic raised at July 2009 Distribution Workstream
Credit Modification Proposals Update
Mod Proposal 0268 : AQ Backstop Date
Revised Tender Timescale for DN Interruption Arrangements
PROJECT NEXUS FUNDING – THE CUSTOMER’S VIEW
Consideration of issues raised by UNC Modification Proposal 0244
Sub Deduct Process Andrew Stone.
Revised Tender Timescale for DN Interruption Arrangements
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Presentation transcript:

Primary & Sub deduct surveys Andrew Stone/Chris Warner

2 How many?  National Grid – Approx 1,000 arrangements (ie: primary meters) Approx 2,230 sub deduct meters  Presentation provided by NGD at UNC Distribution Workstream in April 2007 on considerations/issues associated with possible adoption  National Grid does not own or operate any of the supply pipework downstream of the primary meter ECV.

3 Pre Collected Data

4

5 Ofgem aspirations  Requirement to survey all sub-deduct networks in Britain  GDPCR Final Proposals – 3 rd December 2007 Allowance for surveys  To be completed over 2008/9 and 2009/10 formula years  Purpose to gather technical data relevant to potential re-engineering and future adoption of these networks by GDNs To inform the anticipated DBERR review of the relevant exemption order (Statutory Instrument 1996/449) due to expire on 1 st March 2011  Final report to Ofgem 1 st April 2010  Method for conducting work dependant on resources and experience of each GDN

6 Next steps  National Grid is considering the most effective way in which it is able to meet Ofgem’s requirements  Options for Survey resourcing are currently under consideration. Use of direct labour. Shipper liaison to be facilitated by ‘customer’ department. Outsourcing to contractors by competitive tender. Contractor responsible for all Shipper/Supplier/Customer interfaces.  A method of capturing data in a consistent way needs to be developed  Confirm ownership of Primary/Sub-deduct Supply Point/User  Consistent method of contact with end-consumer needs to be agreed (contact letters, etc)  Extent of NGD liaison with Shipper/Supplier of key importance