Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
Status of the ATLAS MM project
Status Update on Mechanical Prototype in Rome November 6,
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
QA/QC working group Working group ATLAS NSW - QA/QC working group - J. GIRAUD (20/02/2014)1.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Ferrara 8 june 2004M.Savrié1 Production Readiness Review Ferrara MWPC Production Site.
Status Report of activities in LNF Soldering procedure 1.Status of soldering machine 2.Measurement of wire position Chamber prototypes 1.Construction of.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Production Readiness Review Production steps and quality control 1.Panel production 2.HV bar gluing 3.Preparation of side material 4.Wiring and gluing.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
T.Schneider/LHCb Muon EDR
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of MWPC production and quality control The measure of the gas leakage, is obtained by correcting the P(t) behavior by using the data of the reference.
M. Bianco On behalf of the ATLAS Collaboration
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
Panel production status Panels needed according to official plan Oct-05 A rate of 250/month is mandatory to match the chamber production schedule.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Material procurement Panels 1300 produced (over 5700 planned) – Stop of the production in August (still at 50% of FR4 sheets delivered by ELTOS) – Restarted.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
G. Carboni - Muon Meeting – Draft Agenda Muon Meeting 6 April 2004 Introduction (15 min) Total 15 min MWPC prodution Material supplies,
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
To measure 0, mechanical oscillations of the wire to be tested are induced by applying a periodic high voltage (about 900 V) with a frequency of 300 ÷
M23 Inner Regions Upgrade with Triple-GEM detectors The EVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Status of production at LNF E.Dane’ and C. Forti – Meeting with LHCb referees Firenze 14-mar-05 Christmas 3 ch/week Ch. 43.
G. PassalevaFirenze - September 8, 2004 Production Readiness Review Firenze MWPC Production Site G. Passaleva.
Construction and Characterization of a GEM G.Bencivenni, LNF-INFN The lesson is divided in two main parts: 1 - construction of a GEM detector (Marco Pistilli)
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
1 9 December 2002A.P.Kashchuk (LNF/INFN), Frascati) New approach to CPC design.
Production and installation plan Construction sharing Production plan Installation sequence Material procurement P. Campana LNF – LHCb Muon EDR Cern April.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
University of Wisconsin
Overview of the Frascati Production Facilities
Pre-installation Tests of the LHCb Muon Chambers
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Presentation transcript:

Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana

Scope and Goals of the PRR Verify / assess : Readiness of the chamber design and of the construction procedures Readiness of the tooling and of the production site Quality controls and assurance tests Material procurement and its flow Interface and integration issues Chamber logistics Manpower availability Production and installation schedule

Status of LNF production site In August, the set up of the clean room (transfer and set up of tooling) In September-November startup of M3R3 (pre)production: 4 final chambers done (two more under construction) 2 chambers tested under beam : choice between double and single cathode readout test ASDQ vs Carioca Several upgrades of the tooling done and to be done (automatic gluing, more HV bar gluing tables, etc...) A lot of effort in finalizing QA/QC tests and in optimizing the work flow (this has still to improve) The production speed was limited by material availability and to several operations we plan to do in outside company (e.g. components on HV bars)

EDR recommendations 1.A small ‘pre-production’ series should be constructed and tested for each chamber type… The goal was to build and test 4 final chambers: we succeeded in building them, but due to time shortage, and many other commitments (…and a small accident…), only 2 were (nearly) fully tested 2. At least one of these pre-production chambers of each type should have undergone a successful ageing test … This has been done with LNF prototypes in Casaccia. This item has been discussed at length in CERN PRR and will be not treated here 3. The opening of the chambers should be exercised. In fact, the reviewers are mostly worried about the proposal to close two of the three chamber types by gluing… This will be discussed later

4.A wire replacement procedure should be defined and tested for each chamber type. This happened several times and will be explained in the afternoon 5. At nominal gas flow rate, the eventual formation of ‘pockets’ should be checked by efficiency mapping, especially in the case of the longest chamber type. We did uniformity checks and no particular problems appeared 6. As the gap size is probably the most critical parameter for pulse height uniformity, an effort should be made to produce panels of best possible flatness. This will be reported later 7. The sagitta of the panels due to wire tension should be measured, for those panels carrying wires only on one side. Calculations and direct measurements show no sizeable effect

8.The precision of the wiring should be checked on all pre-production chambers. This has been done for the pre-production 9. Gluing should be handled with the utmost attention, with well tested, constant procedures, in particular under <50% humidity … Does not represent a problem and its automatisation is under way 10. Chamber materials and components (panels, bars, wires, glue, resistors and capacities…) should be identical as much as possible for all chamber types. Largely achieved (already discussed at CERN PRR) 11. A well-defined testing procedure during production should be established with the pre-series, including some final two weeks of operation at nominal voltage with final gas mixture and flow. Fully done for 2 chambers, under way for the remaining On the basis of the experience gained with the pre-production series, the production schedule should be re-evaluated … This item will be discussed later

Chamber gluing and its reliability In the period , 11 MWPC chambers were built in Frascati of various dimensions (1.5/2.0 mm pitch, 6 of final size) and all the chambers have been glued and built with similar techniques None of the 960 wire pads of 9 chambers (some 15,000 wires), tested under HV showed problems so important to need a reopening of the chamber In these chambers we observed that after few weeks of constant gas flowing also the wire pads that initially were “more sensitive” to HV, recovered and could be operated at the same HV as the others In the overall design we considered of utmost importance the availability of the access to single pads: we believe this is mandatory for a detailed tracking of problems (especially before chamber closing) and even afterwards, in case a single pad shows some HV-weakness, it can be re-routed on a lower-HV line (the so called “hospital channel”, which we foresee in our layout), without spoiling the overall chamber efficiency and without the need of reopening (or worst) throwing away a full chamber

A stressing HV test should not be performed in the presence of humid gas, such as open air during their construction in the clean room We experienced that only after a very long (several weeks) training with increasing steps in HV and maintaining always a low current limit (in the range of nA for a gap of a big chamber), the chamber can reach operating voltage well beyond its working point The first two final M3R3 chambers (C001-C002) were kept for 3 weeks at 2.75 kV (200 V inside efficiency plateau) with currents of few nA/gap We observed that a resonably fast and simple HV test (few hours, current limited to 200 nA per wire layer) during the production in the clean room is able to spot problems (see Carlo’s talk) On the experience gained in two years of MWPC construction, we believe that, once reasonable HV QC tests have been performed, the chambers can be safely closed with a definitive gluing

Status of panel production It is going on (300 for PNPI for INFN) at a rate of 25-30/week for a single mould (yesterday, 130 done, 6 discarded) See Carlo’s talk for details on planarity measurements Rome 2 is setting up the automatic measuring device at the company New moulds (M2-3, M4-5) under construction (one ready by Christmas) The final set up (with 3 moulds) foresees 20 panels/day (total no. of panels 5360 >> 270 working days + spare) A detailed production plan for panels has to be setup to ensure continuity for various production centers We are planning also a clever scheme for expedition of panels to CERN/PNPI to minimize the number of transports and the number of boxes

Program outline Carlo – Construction procedures, travellers and QC/QA Davide – Source and cosmic ray test stands Gaia – Test beam on M3R3 chambers >>> break Alessio – Access to chamber construction information Adalberto - Interface and integration issues Pierluigi – Material procurement, logistics, manpower, production schedule >>> lunch Visit to production site