Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

Operations Scheduling
Scheduling.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Theory of Constraints Scheduling APICS PDM January 14, 2009.
DOM 102: Principles of Operations Management Operations Scheduling
Short Term Scheduling Introduction What – Scheduling or timing of operations Where – Timing of operations affects the overall strategy Why – Reduce costs,
23–1. 23–2 Chapter Twenty-Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Short-Term Scheduling
Operations Management
Inputs and Outputs to Aggregate Production Planning
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 6 SCHEDULING E
Operations Management R. Dan Reid & Nada R. Sanders
Operations Management
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Scheduling.
1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16: Learning Objectives
Operations Scheduling. Scheduling in a Process-Focused Environment.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
1. Facility size 2. Equipment procurement Long-term
Copyright 2009, John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Scheduling Operations Management - 5 th Edition Chapter 17.
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
Production Activity Control
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Operations Management Operations Scheduling
1 Slides used in class may be different from slides in student pack Chapter 19 Operations Scheduling  Work Center Defined  Typical Scheduling and Control.
Chapter 15 – Scheduling Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough - UNH.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Scheduling for Low-volume Operations
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
CHAPTER 4 : SCHEDULING Presented by: HAMKA BIN TAIP
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
Chapter 16 & 9 Scheduling Work & Employees. Scheduling Outline What needs to be scheduled? –doctor’s office, restaurant, mfg. plant, hospital –employees.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Activity Scheduling and Control
Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Scheduling.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter Twelve Capacity Planning Operations Management Contemporary.
16 Scheduling (focus on sequencing; FCFS, SPT, EDD pages , and Johnson’s rule pages ) Homework; 6, 7, 11.
Production Activity Control
Scheduling Operations
Manufacturing Planning and Control
Inputs and Outputs to Aggregate Production Planning
CHAPTER 8 Operations Scheduling
Chap 11 Learning Objectives
Introduction to Scheduling Chapter 1
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Manufacturing Planning and Control
Inputs and Outputs to Aggregate Production Planning
Presentation transcript:

Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin

13-2 Chapter 13 Outline Batch Scheduling Gantt Charting Finite Capacity Scheduling Theory of Constraints Priority Dispatching Rules Planning and Control Systems

13-3 Synonyms Shop Floor Control Scheduling Operations Production Activity Control (PAC) Detailed Planning and Scheduling (DPS)

13-4 Scheduling Operations Last and most constrained decision in the capacity planning hierarchy Results in a time-phased plan Time frame ranges from a few hours to a few months Has conflicting objectives –High efficiency –Low inventories –Good customer service

13-5 Batch Scheduling Very complex scheduling environment Can be thought of as “Network of Queues” Customers or jobs spend most of their time at work stations waiting to be processed Typical for actual work to be 20 percent or less of the total throughput time Closely related to MRP (see Chapter 16)

13-6 Batch Processing Move-queue-work-wait-move WS 1WS 2 Work is done according to work orders wait move queue move waitqueue move

13-7 Difficulties Of Batch/Job Shop Scheduling Variety of jobs processed Different routing and processing requirements of each job Number of different orders in the facility at any one time Competition for common resources

13-8 Responsibilities of Production Control Department Loading –Check availability of material, machines & labor Sequencing –Release work orders to shop & issue dispatch lists for individual machines Monitoring –Maintain progress reports on each job until it is complete

13-9 Gantt Charting Proposed by Henry Gantt in 1917 Machine performance measures: –Makespan – total time to complete a set of jobs –Machine utilization – percent of make span time a machine (or person) is used. Used primarily to monitor progress of jobs One technique for executing the production plan

Job Data for Scheduling Example 13-10

13-11 Scheduling Example Process AProcess C Job 1 A C B Process B Job 3 In what sequence should the jobs be done? Job 5 Job 2Job 4

13-12 Where is the bottleneck? Total machine times for the five jobs: –Machine A: 15 hours –Machine B: 12 hours –Machine C: 16 hours C appears to be the bottleneck. But! A is used for every job; C is not. Either one could determine makespan.

13-13 Gantt Chart for Example

13-14 Conclusions about Batch Scheduling Performance is highly sequence dependent. Waiting time depends upon job interference in the schedule and available capacity. Finding optimal schedules is not practical, but good heuristics are available.

13-15 Finite Capacity Scheduling (1) Finite capacity scheduling loads jobs onto work stations being careful not to exceed the capacity of any given station. Done at the detailed planning and scheduling (DPS) level. Part of the loading responsibility for executing the production plan.

13-16 Finite Capacity Scheduling (2) Can be used to identify bottlenecks. A bottleneck is a work center whose capacity is less than the demand placed on it, and is less than the capacities of all other resources. A bottleneck will constrain the capacity of the entire shop (or office).

13-17 Theory of Constraints (TOC) Proposed by Goldratt in The Goal (1983) Goal is to make money Key elements of “goals” according to TOC: –Throughput—sales minus cost of goods sold –Inventory—raw materials –Operating expenses—cost of conversion including overhead Production does not count until it is sold!

13-18 Theory of Constraints (TOC) A constraint is anything that is slowing down production—a bottleneck. A constraint is anything that is slowing down production—a bottleneck. –A machine or workstation –The market –Procurement system The bottleneck determines the capacity of the system. Implication: The operations manager should focus on the bottleneck to increase capacity and throughput (and make more money).

13-19 Theory of Constraints (TOC) The bottleneck should be scheduled to achieve maximum throughput. Non-bottlenecks should be scheduled to keep the bottleneck busy. A work-in-process queue should be in front of the bottleneck. Non-bottleneck resources may be idle. Find ways to relieve or reduce the bottleneck.

13-20 Theory of Constraints (TOC) Ways of reducing the bottleneck or constraint: Increase capacity. Divert work that doesn’t need to go through the bottleneck. Catch rejects before they get to the bottleneck. Increase output at the bottleneck. –Larger batches –Reduced set-up times

13-21 Priority Dispatching Rules What are priority dispatching rules? –If you have more than one job waiting at a work station, how do you select which one to process next? The criterion you use for selecting the next job is your dispatching rule. In front office services, the most common rule is “first come, first served” (except for emergency services) Part of the sequencing responsibility

13-22 Priority Dispatching Rules Commonly used in services: –FCFS (First Come, First Served) Commonly used in manufacturing: –CR (Critical Ratio, Minimizes average lateness) –MINPRT (Minimum Processing Time or SPT, shortest processing time) This rule minimizes total waiting time.

13-23 Planning and Control Systems What delivery date do I promise? How much capacity do I need? When should I start on each particular activity or task? How do I make sure that the job is completed on time? Sometimes referred to as Advanced Planning & Scheduling (APS)

13-24 Summary Batch Scheduling Gantt Charting Finite Capacity Scheduling Theory of Constraints Priority Dispatching Rules Planning and Control Systems

13-25 End of Chapter Thirteen