World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Integrated Resource Planning: An overview Mark Howells & Bruno Merven Energy Research Centre Energy Research Centre University of Cape Town.
Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
1 AEP Perspectives on Development and Commercialization of CCS Technology for Natural Gas Power Generation Matt Usher, P.E. Director – New Technology Development.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
World Bank Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities December 3, 2005 Montreal.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
22 April 2010 EWEC 2010 Warsaw2 Jesper Munksgaard Ph.D., Senior Consultant Merit Order Effect of Wind Power – Impact on EU 2020 Electricity Prices.
Barriers to Greenhouse Gas Mitigation Options in Developing Economies like Sri Lanka and Strategies to Overcome them Professor Priyantha D.C. Wijayatunga.
POWER GRIDS AND CDM METHODOLOGIES Workshop for CDM stakeholders The World Bank Buenos Aires December 8, 2004.
Energy Infrastructure in Latin America the View of the IDB May 6, 2011 Miami, Florida Sustainable Energy for all.
STRATEGIES FOR PROMOTION OF ENERGY EFFICIENT AND CLEANER TECHNOLOGIES IN THE POWER SECTOR Synthesis Report Issue 1: Implications of Carbon & Energy Taxes.
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
UNEP rise centre - Demark Fourth regional workshop and training on “Capacity development for the clean development mechanism” 4-6 April - AIT Thailand.
Baseline methodologies for grid- connected electricity – Context and Introduction to the Combined Margin Baseline Calculation Martina Bosi, World Bank.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
IDMEC – IST - RGESD - Research Group on Energy and Sustainable Development CDM China – CDM Training Beijin - CHN - 26 – 30/11/2006 Hydro energy as CDM.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
Standardized approaches in CDM methodologies Daniel Perczyk 7th Joint Workshop 13/03/2011.
Development Alternatives Baselines & Additionality Methodologies Workshop on Clean Development Mechanism: Opportunities in Rajasthan January 28-29, 2005.
Renewable Energy: Legal and Policy Issues Frank Prager Vice President, Environmental Policy Xcel Energy November 20, 2009 Frank Prager Vice President,
Prototype Carbon Fund Training Workshop: Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30- October 2, 2002 Eduardo Dopazo.
Case Study 5: Gemina rice husk project, Nicaragua Sandra Greiner Carbon Finance Unit The World Bank World Bank methodology event.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
California’s Greenhouse Gas Emission Reduction Law and Nuclear Power California State Assemblyman Chuck DeVore January 26, 2009 Presented in the California.
1. Summit Implementation Review Group December 10, 2008 El Salvador Philippe Benoit Sector Manager, Energy Latin America and the Caribbean The World Bank.
CDM Methodologies and Project Design: Workshop for CDM Project Developers 12/5/2004. Buenos Aires. Analysis of the Additionality Tool (with project examples)
Case Study: Jepirachi Wind Power Project Northeastern Atlantic Coast Colombia Charles Cormier, PCF Team Tel:
CDM Methodology World Bank Carbon Finance: Interpretations and Approaches to Baselines, Monitoring and Calculation of Emission Reductions Bonn, 6 June.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
CD4CDMCD4CDM Estimating CO 2 Emissions Reduction by example.
Capital Financing for Energy – Related Projects George Williams, SVP and Chief Operating Officer El Paso Electric Company May 20, 2010.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
Bishkek, 7th of December 2009 Training Workshop: Baseline Study of the Kyrgyz Power Sector for Clean Development Mechanism Presentation III: Case Study.
Simplified modalities for demostration additionality to EE and RE projects: Approach to demostrate additionality in micro scale projects in Peru Ministry.
Min Hydro-Egypt 1 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX EGYPT : Damietta Barrage Small Hydropower Project Eng.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Regional Energy Integration Commission CIER CIER Argentine Committee CACIER Executive Secretary, CACIER Ester Beatriz Fandiño.
1 The Combined Margin Approach: Issues and Options Michael Lazarus, SEI/Tellus World Bank Power Sector Workshop Caesar Park Hotel, Buenos Aires December.
ENDA TM / CDM-PDD1 Analysis of a CDM-PDD illustrated by the El Gallo project Second Regional Workshop on CD4CDM August 2004 Maputo, Mozambique Dr.
Review of CDM methodology development process Annual Meeting of the Host Country Committee on Carbon Finance Washington DC, 15 February 2005 Lasse Ringius.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
Update on methodological work within UNFCCC and future outlook Workshop on CDM Methodologies and Technical Issues 3 rd December, 2005 Montreal, Canada.
Case Study 1: Comments on Transparency and Conservativeness Alan Silayan klima-Climate Change Center.
El Gallo Hydroelectricity Project PDD Analysis
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
Clean Power Plan TENNESSEE MINING CONFERENCE AGENDA November 3, 2015 John Myers Director, Environmental Policy and Regulatory Affairs.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
1 Case study: Sofia District Heating Dr. Venkata R. Putti Team Leader, Carbon Finance Assist The World Bank Minsk / Belarus, March 2007.
On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid Rochelle.
E:\The Carbon Market and Small Producers.ppt The Carbon Market and Small Producers 18 July, 2007 STRICTLY PRIVATE & CONFIDENTIAL.
NS4054 Fall Term 2015 Central American Energy Security.
U.S. Energy Information Administration Independent Statistics & Analysis Outlook for coal and electricity for National Coal Council November.
Some open questions in power sector methodology Sandra Greiner Carbon Finance Unit The World Bank World Bank methodology event Dehli,
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
1 Where Does Electricity Come From?. 2 Overview of Electricity.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Baseline for wind energy project in Tunisia Second National.
Case study 1 Review comments on Baseline Methodology Waste heat use project Prepared by Nguyen Van Hanh Vietnam.
Clean Energy Project Analysis Course Clean Energy Project Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – 2004.
Baseline approaches and methodologies: interpretation of Para 48(a)-(c) M&P Buenos Aires, – December 5 th, 2004 Johannes Heister – World Bank, Carbon Finance.
ELECTRICITY SECTOR IN CHILE ADJUSTMENT IN TIMES OF CHANGE
RENEWABLES AND RELIABILITY
Betül Özer, Erdem Görgün, Selahattin İncecik
Presentation title Methodological tool and data for the development of a SB for the emission factor of an electricity system CDM Standardized Baselines:
What is POWERBALANCE?.
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
Presentation transcript:

World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando Cubillos – World Bank, Carbon Finance Business

Financial Impact of CO2 Revenues Carbon Revenues make a difference, but not a big difference

Power Sector Projects System capacity Base load capacity replacement Major capacity addition Micro capacity addition Base load Dispatch margin CoalRenewableWind Thermal Hydro Dispatch additional?

WB-CFB Experience 2001, Chile - Chacabuquito, hydro r-o-r, 26 MW 2001, Costa Rica – Umbrella, wind and hydro, 10 MW 2002, Guatemala – El Canada, hydor r-o-r, 53 MW 2002, Colombia – Jepirachi, wind, 19 MW 2003, Mexico – El Gallo, hydro r-o-r, 30 MW  All of them well before CDM rules and methodologies were developed

Guessing CDM rules development How we developed the ERPAs/MP to buy VERs Baseline Studies to asses –if the project is part of the most likely course of action (additionality) –ERs projections using different scenarios –the best method to calculate verifiable ERs

Least cost baseline methods for power projects 1.Run expansion planning model with project:  is project not being picked up by the model? (Chile, Colombia) 2.Use expansion planning model to determine long-run marginal cost (LRMC): (Costa Rica, Chile, Colombia)  is project cost (per kWh) higher than LRMC? 3.Determine low/least cost project to represent expansion option (Guatemala, Chile) :  is project cost higher than cost of comparable expansion option? 4.Barrier analysis / additionality tools (Mexico) :  is project impeded by barriers other than costs  If yes: the baseline is the power system without the proposed project => project additionality

Chile – Chacabuquito Experience Comparison of the project with the Least Cost Option for the Expansion –Possible alternatives:

Chile – Chacabuquito (cont.) ERs Projection –Will the project postpone new capacity?, or –Will the project impact the actual operation? Size comparison of the project with the Least cost option for the expansion: –110 GWh of firm energy vs. 3,000 GWh –Theorical/modelling postponing  less than 1 months! Will that change in the grid affect the investment decision for the next capacity addition?

Chile: Central Grid Generation and Dispatch to Meet Future Demand (to scale) GWh Year New 300 MW CC plants

Calculating the impact in the actual operation Ex ante Emission Factor –Coal is the most likely fuel of displacement (60% - 80%) –CCGT Natural Gas fired (15% - 35%) –Only other renewable Hydro (<5%) How to weight them for an ex-ante EF? –100/00/00; 80/20/0; 60/35/5; etc. Proposal: Ex-post monitoring based on Dispatch Analysis  No need to weight!

Some characteristics of Chile Power Sector Efficient regulation for more than 20 years Grid operation run by an independent agency (Dispatch Center) Detailed and public data available to calculate in a very accurate way the marginal plant and the emission factor associated

Monitoring ERs with Dispatch Analysis

Step 1: Hourly Net Generation from CDM Power Plant

Step 2 – Hourly Generation from all power plants in the Grid

Step 3 – Dispatch Priority List

Step 4 – Determination of the marginal generation displaced

Dispatch Analysis for the Chacabuquito Project: Emission Reductions Factor

Dispatch Analysis for the Chacabuquito Project: EF and Generation

Issues with dispatch marginal calculations Double Counting: –Central coordination may be needed to prevent double counting of displaced marginal generation –Calculate ERs for all CDM projects jointly or sequentially on a seniority basis? Capacity replacement: –How does CDM system expansion modify baseline system expansion? –What is the impact of one CDM project vs. the accumulated impact of many CDM projects? –Include emission factor of delayed capacity for time of delay Storage hydro: –Can operate at the margin to follow load. –Is not being replaced, but shifted in time. –Impact on CO2 emissions difficult to analyze. System bottlenecks and “political” decisions  setting system boundaries

Mexico – El Gallo 30 MW hydro Mexico’s grid mainly stated owned and operated centralized Thermal based energy matrix There are no public data available to calculate dispatch margin

Step 1: Analyze barriers to proposed project Sub-step 1: Analyze barriers to the proposed project: The following barriers identified: –(i) access to financing; –(ii) perceived technology risk; –(iii) transaction costs. El Gallo: Methodology for additionality test

Step 2: Discussion of similar projects It is demonstrated that the project differs in important dimensions from similar projects: 1.Comparable projects are less capital intensive 2.Most comparable projects had access to sufficient equity capital 3.Comparable projects are structured as auto-generators El Gallo: Methodology for additionality test

El Gallo (cont’d…) Baseline emission rate The emission rate is calculated as the sum of the emission rates of (1) the operating margin and (2) the build margin divided by 2: ER (tCO 2 /MWh) = W OM x OM + W BM x BM Default weights are set equal to 0.5.

El Gallo (cont’d…) where G i = the generation (MWh) from unit i, e i = the emission rate (in tons CO 2 /MWh) for unit i, and i = individual units, excluding low running cost or must- run plants (i.e. hydro, geothermal, wind, low-cost biomass, nuclear and solar generation)

El Gallo (cont’d…) where G j = the generation (MWh) from unit j, e j = the emission rate (in tons CO 2 /MWh) for unit j, and j = individual plants included among the lesser (in MW) of the most recent 20% or the 5 most recent (over 15 MW) units built

Lessons learned Complexity: –Baselines / ER calculation for projects in integrated technical or economic systems (e.g. power grids) can be highly complex –May require regional/country standardization as the number of projects grows. Meth Panel: –Prefers a combination of additionality tools and simple to calculate, predetermined, and conservative baseline emission factors. –Simplification / generalization is at the expense of accuracy and leads to more conservatively calculated ERs. Policies: –The problems of national and sectoral policies, supply shortage situations, transmission bottlenecks and “perverse” incentives needs.