LBDS commissioning – MKD tests Viliam Senaj, 11/12/2013.

Slides:



Advertisements
Similar presentations
MKDV switch faults November V. Mertens L. Ducimetière with H. Bartosik, G. Bellotto, C. Boucly, P. Burkel, E. Carlier, D. Comte, S. Huon,
Advertisements

Connecting Speaker Level Outputs to Harman Amplifiers.
NFPA ELECTRIC VEHICLE SAFETY FOR EMERGENCY RESPONDERS Module II : Basic Electrical Concepts And Hazards Module II : Basic Electrical Concepts And Hazards.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC 18 & 19 April 2015 At 450 GeV with bumps, no increased MUFO activity. Beam screen 15R8 warming up to 80 K, ongoing for the day 09:00: Orbit studies.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
LHC Beam Dumping system
TS2-SPS & TS1-LHC. TS2-SPS (On Monday 15th of June for 24hrs) SPS – HW: Replacement of HV Switch PFN 7 MKP (Impact 65420) SW: « Smooth » upgrade in accordance.
1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.
Failure mode impact studies and LV system commissioning tests
FHCT SEB cross-section measurements at H4IRRAD and with cosmic rays and its influence to LHC abort system reliability Viliam Senaj RadWG meeting 04/10/2011.
LBDS Kicker Electronic and Slow Control Etienne CARLIER AB/BT/EC.
MKD stack upgrade MKD generator meeting Viliam Senaj 23/06/2015.
“What you get” Transverse damper system (ADT) F. Dubouchet W. Höfle G. Kotzian D. Valuch Special thanks to: A. Boucherie, A. Butterworth, S. Calvo, G.
K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site1 (Selected Items on) Quality Control at Aachen.
Solid-state based 60 kV 15 kA switch for the SPS vertical beam dumping kicker magnet L. Ducimetière, P. Faure, V. Senaj.
Cabling and connectors for future LAV stations Mauro Raggi LAV working group CERN 26/10/2009.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
HQ02b : Test plan overview Test plan overview: Main elements and Open questions H. Bajas TE-MSC-TF H. BAJASUpdate meeting on HQ02b assembly and test plan02/05/2014.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
Proposed LHC beam dumping kicker generator modifications for LS2 TE-TM Meeting Viliam Senaj 07/07/2015.
CAEN November 15, 2002 Vandelli W. 1 Test Conditions Prototype fed by CAEN Module 2527 through 100 m long cables From channels status page on generator.
4.1 Electrical Charges Opposite charges attract Same charge repels.
LHC Beam Dumping System Status and Readiness for LHC Run II Evian Workshop 2-4 June 2014 Nicolas Magnin – TE/ABT/EC On behalf of TE/ABT team. Thanks to.
LIBD on LBDSmeeting Viliam Senaj 04/02/2014. MKB test MKB vacuum level satisfactory for beginning of HV test: – B1: between 3.1x10 -7 and 5.7x10 -7 (new.
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
LBDS Power Triggering Etienne CARLIER & Jean-Louis BRETIN AB/BT/EC.
NATURAL SCIENCES GRADE 5 Energy & Change. Safety and Electricity NATURAL SCIENCES GRADE 5.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
LBDS KICKERS MPP workshop - Annecy Nicolas Magnin TE-ABT-EC.
Kicker generator and controls installation in ECA5? Etienne CARLIER
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
MKD Reliability run Viliam Senaj TCM meeting 18/11/2014.
MKD dust related actions Viliam Senaj Technical Coordination Meeting 27/01/2015.
1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting.
LMC 27 November 2013 Status of LBDS LS1 activities and plans for 2014 reliability run Jan Uythoven for the many, many people working on the mentioned equipment.
LHC Beam Dumping System Experience from reliability run and Re-commissioning procedures MPP Nicolas Magnin – TE/ABT/EC.
1 ABTEF - 16/05/2014 Maintenance of safety-critical systems : LBDS - MKD / MKB on LHC.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
YETS LHC 2015/16 - ABT Group TCM Francesco castronuovo.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
YETS status report TCM Francesco castronuovo.
TRIGGER DELAY 100µs. G. Gräwer AB/BT/ECLBDS Trigger Delay2 The trigger delay is a back-up system that generates an asynchronous dump trigger for MKD and.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
Technology Department 2 April 2015A.Adraktas1 MKD 3D field calculations A. Adraktas Acknowledgments: V. Senaj MKD meeting, 2 April 2015.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
YETS status report TCM Francesco castronuovo.
LCD Wiring Diagram Presentation B / B.
FHCT SEB cross-section measurements at H4IRRAD and consequences for MKD reliability Viliam Senaj LIBD meeting 24/01/2012.
Preparation for TS3 Mariana Rihl. Known issues Implications on light leaks on all modules – Visible on current feedback of bias – Confirmed by study performed.
MTE: Statistics of kickers faults Etienne Carlier, Luis Feliciano, Laurent Ducimetière, Brennan Goddard, Luc Sermeus 1 19 October 2015 MTE internal review.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Linac Weekly Operational Report May 9 th – May 16 th 2008.
LBDS YETS activity report Viliam Senaj MKD meeting, 19/01/2016.
MKDV upgrade LIU-SPS ABT meeting V. Senaj, L. Ducimetiere, P. Faure November 4 th 2014.
Fast retrigger path What threshold level we need for the fast trigger path?
Proposition of MKD & MKBH modification with the goal to reduce maximum voltage (and risk of erratic) Viliam Senaj, 05/05/2017.
Fast High Current Thyristor SEB test
LHC Beam Dumping System Reliability Run Summary
MKD/MKB Review Meeting Scope and Definition
Nikolaos TRIKOUPIS on behalf of TE-CRG-CI CRG-TM for LS2 preparation Preliminary activities of the CI section 25/09/2017
Viliam Senaj MKD meeting 23/05/2017
Overview of LBDS related tasks
Attempt to non-destructive SEB testing of 1.2 kV SiC MOS
Unexpected Failures of Modules on Rods
LHC Morning Meeting - G. Arduini
Model Output Current Battery Life BATPSU VDC 2A 1.2Ah BATPSU VDC 2.3Ah
Jan Uythoven For the LBDS Team
Status of the retriggering boxes and measurements
Presentation transcript:

LBDS commissioning – MKD tests Viliam Senaj, 11/12/2013

MKD/B2 tests HV tests (up to 5 TeV) without major problems: – noisy Trigout on Gen. H (up to 5V noise signal) – replaced chassis with PTU&PTC – Noisy output on one PTU of Gen. D – replaced PTU – Triax cable connectors on Gen. B – difficult to insert – replaced cables – Triax cable and 3 kV HV PS cable not fully inserted on Gen. E (27/11) No abnormal sparking activity observed - surveillance of retriggering pick-ups Cts2a&b – with the same settings for all generators DC 7TeV test: erratics on B (3 erratics 2 GTOs broken), D (6 erratics no damage), G (1 erratic no damage), J (3 erratics 2 GTO broken), N (2 erratics no damage) 48 hours ramp test: 10min 400 GeV; 10 min ramp to Emax; 90 min at Emax and (12h 6.5 TeV, 12h 6.75 TeV, 24h 7 TeV) - OK (without B&J)

Spontaneous firing of MKD/B2

Spontaneous firing of D/B2 on 16/11 02:13:06

Spontaneous firing (?) of B/B2 on16/11 20:41:10

Spontaneous firing of B/B2 on16/11 20:41:10

Spontaneous (?) firing B/B2 during switching off D/B2 18/11

Erratic of B/B2 during switching off D/B2

Non typical self-firing (?) of G/B2

Searching reasons of spontaneous firing Abnormally dry air observed in UA67 during tests (dew point - 9 deg) To find if it affects B1 – it was put in DC mode between 30/11-03/12: ~24h rising from 6 to 7 Tev; 36 h at 7 TeV and finally 24 h at 7.1 TeV; no self- firing observed

Searching reasons of spontaneous firing Hypothesis of charging of plexiglass insulation rods by friction of dry air blown by ventilators towards GTO stacks: switched off ventilators in Gen D, E, F, G, H, I, J – during 7 days – not confirmed Observation of noisy output of several PTU – even PTU signal before GTO current – on Gen. D:

Continuation tests Generators B and J in laboratory for tests DC test during Christmass DC and ramp test in 2014 Surveillance of PTU activity/retrigger propagation (thresholding)