RF performance and operational issues The LHC RF team reported by A. Butterworth Special thanks: L. Arnaudon, E. Ciapala, Ph. Baudrenghien, O. Brunner,

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
RF Stability Working Group Jorn Jacob (ESRF), John Byrd (LBNL) General Issues RF phase and amplitude noise –filtered by cavity and translate into timing.
RF Commitments and Major Issues E. Ciapala Input from: P. Baudrenghien, O. Brunner, T. Bohl, A. Butterworth, W. Höfle, T. Linnecar, E. Shaposhnikova, J.
“What you get” Transverse damper system (ADT) F. Dubouchet W. Höfle G. Kotzian D. Valuch Special thanks to: A. Boucherie, A. Butterworth, S. Calvo, G.
Digital measurement system for the LHC klystron high voltage modulator D. Valuch, A. Mikkelsen, G. Ravida, O. Brunner.
RF Systems Commissioning O. Brunner AB/RF on behalf of the RF group (LTC – March ’08) Many thanks to L. Arnaudon, Ph. Baudrenghien, W. Hofle, D. Valuch,
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
RF strategy, limits and issues A. Butterworth L. Arnaudon, Ph. Baudrenghien, O. Brunner, E. Ciapala, W. Hofle, J. Molendijk, E. Shaposhnikova, J. Tuckmantel,
:30 meetingEBH 1  7:53 start VdM scans LHCb  8:18 beam dump: RF M2B1 crowbar (3 rd time within 24 hours)  Access for RF  Changed thyratron.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
ADT re-commissioning after LS1 A. Butterworth, W. Höfle, F. Killing, G. Kotzian, T. Levens, D. Valuch with many thanks to BE/OP LBOC, ADT re-commissioning.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
Update on Crab Cavity: Impedance (at fundamental), RF noise, operational scenario P. Baudrenghien, R. Calaga, T. Mastoridis March 21 st, th HiLumi.
ADT Tune Measurement F. Dubouchet, W. Hofle, D. Valuch Acknowledgement: R. Calaga, F. Roncarolo, E. Bravin, shift crews New developments and tests on August.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
LHC RF re- commissioning for run 2 with planned operation at 6.5 TeV/c and 0.55 A DC current P. Baudrenghien BE-RF with contributions from J.E. Muller,
POWER REQUIREMENTS FOR THE LHC HARMONIC CAVITIES WITH THE FULL-DETUNING SCHEME P. Baudrenghien, T. Mastoridis, CERN BE-RF 2nd LHC Harmonic Cavity meeting,
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
1 Consequences of RF system failures during LHC beam commissioning T.Linnecar AB-RF.
LHC transverse Damper Observations versus expectations W. Hofle BE/RF/FB CERN BE-RF team for ADT L. Arnaudon, P. Baudrenghien, A. Butterworth, G. Cipolla,
The LHC RF Power Systems Skip the intro… CWRF08 workshop - March'08 1 Presented by : Luca Arnaudon Slides by : Olivier Brunner & Luca Arnaudon Important.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
W. Hofle / March 5, 2008 Extended LTC meeting 1/22 Acknowledgements: P. Baudrenghien, A. Butterworth, E. Ciapala, B. Goddard, A. Koschik, F. Killing, G.
Readiness for RF capture Cavities – all 16 cavities commissioned with RF feedback loops closed klystron polar loop still to commission on 2 cavities 2.
RF acceleration and transverse damper systems
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Injectors BLM system: PS Ring installation at EYETS
RF interlocks for higher intensities (LMC 15 June)
Second SPL Collaboration Meeting, Vancouver May 2009
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Longitudinal beam parameters and stability
Friday 18/03 07:15 Test ramp with pilot after the test of dynamic FIDEL correction. Ramp was OK, but fill was stopped due to the trip of several RQTFs.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
RF and Sequences Andy Butterworth BE/RF
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Thursday morning – optics correction
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
LHC Morning Meeting - G. Arduini
Limits on damping times
Saturday 2/4/ :00-09:00 Problems with SPS:
Monday February 28th 8h00: Injection
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Beam dynamics requirements after LS2
Thursday Fill 1364 (24 bunch) dumped at 07h
LHC Fast Timing Commissioning
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Tuesday 20 September 2011.
Thursday 30th September De-bunching test
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Presentation transcript:

RF performance and operational issues The LHC RF team reported by A. Butterworth Special thanks: L. Arnaudon, E. Ciapala, Ph. Baudrenghien, O. Brunner, W. Hofle, J. Molendijk

Outline Operational difficulties – Klystron collector power – Spurious hardware trips – Switch-on problems – Controls & software – (De-)Synchronisation RF readiness for unsafe beam – interlocks Transverse damper readiness – cable issues – noise Summary & conclusions

Input cavityOutput cavity RF InRF Out Klystron collector power Nominal scheme for cavity operation: Injection: 1MV/cavity, Q = 20000, 135 kW Physics: 2MV/cavity, Q = 60000, 185 kW – Q is changed before acceleration using moveable cavity power coupler – Klystron DC power ≈ 500 kW (58 kV x 9A) But: in 2008/9, decided to work with fixed Q =  1MV requires only 45 kW P collector = P DC – P RFout  P collector close to rated maximum

Klystron collector power Collector opened 15/01/10 Potential concern - under investigation.

Klystron collector power Mitigation: reduce collector power: – fewer cavities with higher voltage per cavity – higher RF power per klystron  reduced collector power (below 450 kW) – 4 2 MV, many RF trips cavities had de-conditioned during 2 weeks of running at injection level – eventually +/- reliable with MV Other measures: – Automatically switch power system to READY when RF OFF reduced current, P collector ≈ 100kW

Choices for 2010 running 1.Reduce number of cavities – no limit in 2010 on beam current from impedance of unused cavities (detuned by 100 kHz) – cannot reach nominal 16 MV per beam in physics with Q=60000 – go to higher Q ? 2.Work at lower DC power – no headroom for feedback at 2MV during physics – reduce cavity voltage? 3.Commission nominal scheme: move coupler to change Q after injection – more time needed before startup to fine-tune loop parameters at different Q values – (2 weeks with cavities cold)  only long-term solution for higher intensities

Hardware issues: spurious interlocks “Slow” interlocks via PLCs – waveguide/coupler blowers – water flows... – threshold & detection time adjustable in PLC RF reflected power interlocks (wattcher) – changed integration time – slowed rf voltage ramp-up rate at switch-on also helps cryo stability Cryogenics – He pressure interlocks due to de-conditioning

Thyratron (crowbar) spurious triggers Many crowbars when starting/raising HV  Reduce HV power converter ramp rate Crowbar triggers do not come from klystrons – 1 coil to fire thyratron – 1 coil to generate power converter interlock – 1 coil for each klystron: used for interlock diagnostics – no triggers seen on klystron channels to klystrons

Thyratron (crowbar) spurious triggers Thyratron heater adjustment – 4 heaters must be regulated < 0.05V in 4.5V – drifts cause auto-triggers, e.g. when ramping HV  re-check adjustment and observe During conditioning in LHC and operation in SM18 there were almost no crowbars – difference in LHC is the earth system for the HV bunkers – earth connected in RB (far from bunkers) – sensitive to noise when machine is running – PC trips trigger crowbar  investigate: measure earth noise with scope

Power system switch-on problems Crowbars – repeated HV trips – power converter post-mortem blocks PC comms for ~1 minute RF application should inform of this Wrong manipulation: 18kV switched on with PC on (more than once) – broke some 5V power supplies in HV bunker – could have caused more damage... – a safety interlock on 18kV has been requested from EN/EL Alarm diagnostics – sometimes fails due to bug in FESA class, will be rectified before startup – alarms are yellow (should be red)... Software issues...

Application blocking & FEC crashes FESA classes running on cfc-ccr-cgplrf FESA shared server ACSLine ACSLinePLC ALLLine... Server process Real time processes Notification message queues Fixed display RF application Fixed display CMW subscriptions... cfc-ccr-cgplrf many subscriptions: machine starts to overload notification message queue between FESA RT and Server becomes full FESA surveillance mechanism notifies server via signal signal caught by any random thread  FESA crash... application “blocks” only hope of restart is to kill all clients and reboot Bug found, fixed & tested (thanks to FESA team)

Synchronisation problems Coarse frequency program reference for ring 2 – want to use ring 1 reference when rings locked together – using wrong reference can make synchro loop unlock on a large trim  FGC and sequencer mods to allow use of ring1 reference for both rings Phase loop problem with beam & RF off – at injection gives random phase -> phase loop kicks synchro loop out of sync – same when switching RF off with beam (e.g. for debunching)  added threshold in firmware -> switching RF off disables phase loop Beam control Clock generators – resync of 40MHz sampling clock had been forgotten from synchro initialisation sequence – used for sampling in beam phase module – come up with random phase if not properly resynced  added resync of 40 MHz to f rev Installed diagnostics (TDC measurements) – on BC1 crates (f rev master vs f rev prog) – in Synchro system between f rev prog 1 and 2 Synchro loop error (blue) during 855Hz trim ResynchronisationInjection (ns) Synchro loop unlocking at injection

Readiness for unsafe beam No beam interlocks on RF voltage or RF trips currently connected – at 1/2 nominal intensity, beam can survive 1 cavity trip – ultimately will need interlock on RF off for each cavity controller currently not implemented – but for now, add an interlock on the cavity voltage sum: beam dump if below threshold Frequency interlocks – coarse interlock on 40MHz (corresponds to +/- 10 kHz on RF) – fine interlock +/- 200Hz on RF: measured behind distribution in UX45 every 50ms implemented but not enabled (or tested) yet  test before startup, and enable for unsafe beam (maskable) – ring1/ring2 inversion check before each fill? – software interlock on cavities remote/local clock status? Synchronisation – de-synchronisation f rev master/prog during injection will make SPS inject in wrong bucket (possible over-injection) – should interlock the TDC measurement?

Low Level RF for 2010 Cavity controller – variable coupler: change of Q – put 1-turn feedback into operation further impedance reduction for increased intensity minor impact on operation Injection transient phase/synchro errors – fixed display done – automatic adjustment procedure for injection phase needs to be developed – reduce need for longitudinal feedback Longitudinal feedback (2 nd half 2010) – bunch by bunch damping of injection errors – needs firmware development – fibre cabling in progress – will need some (short) accesses after startup for equipment installation Emittance blowup by controlled noise – hardware/firmware in place – software in progress – MDs needed

ADT: Readiness for 2010 running Power system: – more than 2000 hours operating time accumulated Damper Lowlevel: – hardware completed and available in 2009 – feedback not yet closed (no time allocated for commissioning) Controls – application software tested and used operationally – Lowlevel software (function generators, expert software, abort gap cleaning) tested in dry-runs and during beam Abort gap cleaning tested with beam – software and firmware to generate the cleaning pulses worked very well – data analysis ongoing – optimization of cleaning pulse in order not to touch beam outside abort gap is necessary Major issues encountered – impulse response of cable from pickups (ripple) – reduction of beam lifetime by unwanted excitation through damper 

Signal from single bunch as measured on the surface; the large ripple is due to a periodic perturbation on the cable Good cable for comparison Issue with long 7/8” cables from pick-ups 7/8” Flexwell cable is known to have some ripple in the impulse response due to the corrugation The 16 cables for the ADT pick‐up cables from SR4 to the tunnel have a larger than expected variation of the ripple from cable to cable when excited by the bunch passing the pick‐up

Two cables being replaced during the technical stop reconsider pick-up signal processing if necessary (all cables show some signs of this problem) Issue with long 7/8” cables from pick-ups Periodic perturbation visible in reflectometry, compatible with pitch of ladder (attachment every 60 cm = 2 x 30 cm) Zoom into the time domain S 11 data of damaged cable

Tests done in UX45 Measured noise injected from the BI excitation input

Tune measurement (BBQ), BI input off, ADT level 3 (blue) on, versus level 2 (red) No influence on life-time 8 kHz + ~50 Hz lines

Disappearance of 8 kHz line in damper spectrum when UPS’ in UX45 and SR4 are bypassed line at 16 kHz probably caused by another ground loop involving other UPS or equipment

Reduction of damper noise at 8 kHz by common mode choke in UX45 choke will be improved, measurement shows that problem is a ground loop

Summary: RF Power system: – minor hardware problems understood and addressed – possible concern over klystron collectors operating mode needs to be defined – time needed to commission variable cavity Q Controls & software: – major operational problems solved Low level & synchro: – various causes for synchronisation problems understood and resolved Readiness for unsafe beam: – addition of interlocks on cavity sum, frequency and synchro To do... – Q change, 1T feedback, longitudinal feedback, emittance blowup...

Summary: ADT Commissioning with beam started, need dedicated time 2010 for commissioning ! Noise spectra need attention, remove ground loops by common mode chokes – improved ground between surface and underground areas necessary ? Two pick-up cables (7/8”) will be replaced during the technical stop, – performance for multi-bunch operation to be checked (residual ripple from cable) Abort gap cleaning promising, but pulse shape optimization

Additional slides

Details of spectrum; 8 kHz + lines spaced 100 Hz 8 kHz 8.1 kHz 7.9 kHz

Spectrum of 230 V perturbation in a rack supplied by UPS; main contributions: < 2 kHz, 8 kHz, 16 kHz one phase in damper racks (SR4) to neutral < 2 kHz 8 kHz 16 kHz

Reflection from cable in vertical part (in the pit) is high, periodic perturbation in frequency domain at approximately 200 MHz and 400 MHz (unfortunately) Issue with long 7/8” cables from pick-ups Seems to be due to the way the cables are attached in the vertical part of the pit going down

Simplified synoptic of ADT (transverse damper) 8x per beam HOM returns (32x) Currently disconnected

Lifetime test damper level 3 on without BI signal 9:58 BI signal on (via switch and timing on RF side)

Lifetime test damper level 3 on with BI signal 17:45 damper level 3 off

Issue with noise on ADT kicker Influence of damper level 3 (signal drive) on/off on beam lifetime and beam spectra observed (R. Steinhagen) Investigations of noise spectra at damper equipment by RF group lead to the identification of different contributions: – Contribution from BI input signal for tune measurement, triangular shaped noise from 50 kHz to 250 kHz, fix is underway (filtering) for 2010 (BI group), 2009 fix was to attenuate the signal – 8 kHz (and multiples) identified to come from the UPS power supplies; confirmed in 2010 when SR4 and UX45 UPS’ where switched off (effectively by-passed) Mechanism by which 8 kHz enters damper equipment is thought to be by ground loops (surface to under ground areas) – grounding scheme needs to be looked at, possibly improved ? For 2010 a scheme to suppress the noise is to install common mode chokes at the input of the damper equipment in UX45 – 10 dB suppression shown already – chokes with more windings will be constructed for better suppression – if problem persists, another solution would be to move some equipment from the surface to UX45  considerable investment in time, only if really proven necessary