SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.

Slides:



Advertisements
Similar presentations
Yuba-Sutter Regional Conservation Plan EIS/EIR SCOPING MEETING January 6, 2015.
Advertisements

PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.
Sacramento Local Agency Formation Commission Peter Brundage, Executive Officer; Donald J. Lockhart, Assistant Executive Officer; Diane Thorpe, Commission.
It’s not my Fracking Problem! Regulations, Liability, and the Process of Hydraulic Fracturing Katie Heath November 30, 2010.
Proposed Tire Broker Regulations Informal Online Workshop Wednesday, March 4, 2015.
1 Workshop for the Proposed Gregory Canyon Landfill California Department of Resources Recycling & Recovery (CalRecycle) June 27, 2011 Fallbrook Public.
Environmental Justice (EJ) & Community-Based Transportation Planning (CBTP) Grant Programs California Department of Transportation District 3 January 25,
Division of Local Assistance Office of Special & Discretionary Programs December 2, 2010.
Pravin Amar Development Planners 14 July 2005, Assagay Hotel, 5pm Applicant: EnviroServ Waste Management (Pty) Ltd. Environmental Consultants Pravin Amar.
SB4 Implementation & Kern County Oil and Gas EIR Update Air and Waste Management Association – Golden Empire Chapter Western States Petroleum Association.
EOH 3101 PRINCIPLES OF ENVIRONMENTAL HEALTH LAWS AND RULES REGARDING POLLUTION AND HEALTH.
1 State Water Resources Control Board Environmental Review for State Bond Funded Grant Projects Presented by Lisa Lee, Environmental Review Unit.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Update on EPA Oil and Gas Activities Greg Green, Outreach and Information Division, OAQPS.
Colorado’s Groundwater Protection Program Monitoring and Protecting Groundwater During Oil and Gas Development Natural Resources Law Center Intermountain.
Water Supply Planning Initiative State Water Commission November 22, 2004.
The STRONGER State Review Process -Draft Air Quality Guideline ● Martz Summer Conference June 6, 2014 Bruce Baizel Chair, STRONGER Board
Presented By: Lori D. Ballance Gatzke Dillon & Ballance LLP Prepared For:Assn. of California Airports 2013 Fall Conference.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Skyline Heights City of Corona Scoping Meeting March 4, 2014.
Workshops on Discussion Draft of Guidelines December 2014.
2014 IRWM Drought Grants Sierra Water Workgroup Summit June Tracie L. Billington Department of Water Resources Financial Assistance Branch.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
1 CEQA and CEQA-Plus Presented by Cookie Hirn, Lisa Lee, and Michelle Jones Regional Programs Unit July 2008.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
California Integrated Waste Management Board Tire Flow Study Along the California-Mexico Border Region Special Waste Committee Meeting California Integrated.
Administrative Law The Enactment of Rules and Regulations.
Winery Ordinance Update Scoping Meeting for the Environmental Impact Report County of Santa Barbara July 16, 2014.
STAKEHOLDER CALL/MEETING TO DISCUSS AND PROVIDE INPUT ON ZEV INCENTIVE PROGRAM GUIDELINES CALIFORNIA AIR RESOURCES BOARD March 7,
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
Safeguarding California: Implementation Action Plans Listening Tour October 2015.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
Tracey Ferguson Project Manager, Integrated Water Resources ATKINS.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
Status Report On Staff Review Of Board Regulations For Alternative Daily Cover, Food And Green Waste Composting, Farm And Ranch Composting, Compostable.
CEQA and the Delta Plan Presentation to Delta Stewardship Council February 24, 2011.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Planning & Community Development Department Lower Hastings Ranch Moratorium Extension City Council January 25, 2016.
White Hill Middle School Initial Study/Mitigated Negative Declaration Ross Valley School District Community Meeting November 1, 2011.
NYS Department of Environmental Conservation Flow Standard Amendment to New York’s Water Quality Standards Regulations Scott J. Stoner Chief, Standards.
City and County of San Francisco Scoping Meeting Environmental Impact Report (EIR) PURPOSE To solicit participation in determining the scope.
W HEN F RACKING I SN ' T C ALLED F RACKING : Flawed Well Stimulation Definition in Proposed State Oil Legislation (HB 191/SB 318) Excludes Most Common.
CEQA 101  CA Legislature passed CEQA in 1970; signed by Governor Reagan  CEQA statutes are found in Public Resources Code sections et seq.  The.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
Welcome to the Public Comment Hearing on the Proposed Regulatory Update to the California Environmental Quality Act AB 52, Gatto (2014) Heather Baugh Assistant.
Office of the State Fire Marshal Pipeline Safety Division
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
Department of Environmental Quality
Scoping Meeting April 20th 6:00 pm
Overview of the Draft EIR
Cannabis Cultivation: A Growing Threat to California’s Water Quality
Introduction to the California Environmental Quality Act (CEQA)
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Facebook Campus Expansion Project EIR
City of Los Angeles Department of Public Works Bureau of Engineering
Overview What is the CEQA environmental review process?
South San Gabriel Boulevard Pacific Square SG Scoping Meeting Case Planner: Tracy Steinkruger, Planning Manager.
Fifth Standard Solar Project Complex
City of Los Angeles Department of Public Works Bureau of Engineering
Groundwater and Waste Management Committee November 9, 2016
Butte County Board of Supervisors April 21, 2015
Julie Woosley, Division of Waste Management
Vista Verde Residential Project Environmental Impact Report Public Scoping Meeting May 19, 2010 Michael Brandman Associates.
Brackish Water Desalination Project Draft EIR
Sacramento Local Agency Formation Commission
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT OF C ONSERVATION DIVISION OF OIL, GAS, & GEOTHERMAL RESOURCES

INTRODUCTORY REMARKS

Welcome. This event is a scoping meeting regarding the EIR required by Public Resources Code section 3161, subdivision (b)(3), otherwise known as SB 4. SB 4 became law in September of this year, and one part of this new law requires the Department of Conservation, through its Division of Oil, Gas and Geothermal Resources, to conduct an EIR regarding the impacts resulting from well stimulation treatments, which includes hydraulic fracturing. The EIR is scheduled to be completed by July 1, This meeting is not part of the process regarding the public review of regulations to become effective in 2015 regarding well stimulation treatments, also required by SB 4. Information about that process can be obtained on the Department of Conservation’s website. There are a great many legal requirements associated with the preparation of an EIR in California. This meeting is just one step in the process, and that step is to receive comments from interested government agencies, and the public, about what the EIR should cover, that is, the scope and content of the EIR. Only one scoping meeting is required under the laws governing the preparation of EIRs, but the Department is holding five meetings in order to increase the opportunities for interested parties to comment. Written comments can also be submitted, and is encouraged. Information about submitting written comments will be provided later in this presentation. It may be important to you that this meeting is not being held to debate the pros and cons of hydraulic fracturing or well stimulation treatments. Rather, this process is to implement the direction set by the Legislature in SB 4. This meeting is held to receive verbal comments about what issues the public thinks the EIR should cover, and what concerns the public may have about the practices of well stimulation and/or hydraulic fracturing. Ultimately, any analysis, conclusions or recommendations appearing in this EIR will assist the Department in regulating these activities and ensuring the protection of the environment and human health and safety.

Agenda Overview of different processes required by SB 4 New Statutory Definition of Well Stimulation Treatments Directive to Prepare an Environmental Impact Report (EIR) Objectives of the EIR Approach to the EIR EIR Study Regions EIR Schedule and Future Participation Contact Information / How to Submit Scoping Comments

SB 4 Requires... DOC to implement interim (“emergency”) regulations regarding well stimulation activities occurring in 2014 (released this week). DOC to propose and receive comments regarding permanent regulations regarding well stimulation activities occurring in 2015 and beyond (released last month). Prepare an EIR to provide the public with detailed information regarding any potential environmental impacts of well stimulation in the State (THIS requirement is the focus of tonight’s meeting).

Statutory Definition of Well Stimulation Treatments ( added to Public Res. Code by SB 4 ): “[A]ny treatment of a well designed to enhance oil and gas production or recovery by increasing the permeability of the formation. Well stimulation treatments include, but are not limited to, hydraulic fracturing treatments and acid well stimulation treatments. Well stimulation treatments do not include steam flooding, water flooding, or cyclic steaming and do not include routine well cleanout work, routine well maintenance, routine removal of formation damage due to drilling, bottom hole pressure surveys, or routine activities that do not affect the integrity of the well or the formation.”

Statutory Directive To Prepare an EIR New Public Res. Code Section 3161, subd. (b)(3) and (4) require DOGGR to:  Prepare an EIR pursuant to the California Environmental Quality Act (CEQA) in order to provide the public with detailed information regarding any potential environmental impacts of well stimulation in the State.  Evaluate the well stimulation activities that may be conducted, as defined in new Public Res. Code Section 3157, that may occur at oil and gas wells in the State existing prior to and after September 20, 2013.

Proposed Objectives Objectives of EIR:  Ensure DOGGR’s compliance with new Public Res. Code Section 3161, subd. (b)(3) and (4).  Identify, evaluate and disclose the potential environmental impacts of well stimulation treatments.  Further the Legislature’s efforts to ensure that well stimulation practices are conducted in a manner that assures environmental protection, public safety, data collection and reporting, interagency coordination, regulatory oversight and monitoring, and public disclosure.  Allow for the safe recovery and production of the State’s oil and gas resources.

EIR Approach State California Environmental Quality Act (CEQA) Guidelines Section 15168: Program EIRs are allowable and encouraged under CEQA for a series of actions or activities that can be characterized as one large project and are related either: Geographically As logical parts of a chain of activities In connection with rules, regulations, plans or other general criteria governing a continuing program, and/or As individual activities carried out under common authority (statutory or regulatory) and having similar environmental effects which can be mitigated in similar ways.

EIR Study Regions

EIR Scope / Environmental Factors (non-exhaustive list) AestheticsLand Use and Planning Agriculture and Forestry ResourcesMineral Resources Air QualityNoise and Vibration Biological ResourcesPopulation and Housing Cultural ResourcesPublic Services Geology and Soils / SeismicityRecreation Greenhouse Gas Emissions / Climate ChangeTransportation and Traffic Hazards and Hazardous MaterialsUtilities and Service Systems Hydrology and Water Quality Alternatives

EIR Schedule & Future Participation Notice of Preparation Publication and Public/Agency Scoping November 18, 2013 – January 16, 2014 (60 Day Comment Period) Draft EIR Publication and Public/Agency Review and Comment September - November, 2014 (60 Day Comment Period) Public Workshops on Draft EIRSeptember – November, 2014 Final EIR PublicationJune, 2015 Final EIR Decision Making/CertificationJune, 2015

SB 4 EIR Basic Timeline... Dec Sept.-Nov June 2015 Scoping Comment on DEIR Final EIR _____I_______________I________________I_______ → → → → → → → → → → → → → → → → → → → →

Contact Information Written Scoping Comments via U.S. Mail: Ms. Adele Lagomarsino California Department of Conservation Division of Oil, Gas, and Geothermal Resources 801 K Street, MS Sacramento, CA Scoping Scoping Process Information:(916) SB 4 Information:

PUBLIC AND AGENCY SCOPING COMMENTS...