Achieving Value: The How and Why of Value Engineering Paul Johnson, CH2M HILL Presented at the PNWS – AWWA 2008 Annual Conference Vancouver, Washington.

Slides:



Advertisements
Similar presentations
Solving Challenges Others Cannot Statutory Frameworks for Public Private Partnerships HMFA Lone Star Chapter 2009 Winter Institute Dallas, TX Christopher.
Advertisements

Roll-out Carts Proactive Replacement Programs. Outline – Proactive Replacement Program Background What (is proactive replacement)? Why (proactive replacement)?
Value Engineering How DOT’s uses this valuable tool in project development What is it When is it used How do we use it.
Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
26-1 C APITAL B UDGETING LONG-RANGE PLANNING CHAPTER 26.
Copyright © 2008 Prentice Hall All rights reserved 9-1 Capital Investment Decisions and the Time Value of Money Chapter 9.
CEM-512 Value Engineering Highway Project: South Interchange.
Vision North Texas Presentation by Karen Walz FAICP.
91 st Annual Meeting & Exposition April 1 – 4, 2012 Anaheim, California More money for student services with this easy saving opportunity.
Continuous Value Enhancement Process
Modeling Financial Achievability of Transportation Research Projects Patricia H. Born, Ph.D. and Randy E. Dumm, Ph.D. Center for Insurance Research, Florida.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
1 Proposal Defining The Purpose Preparation Components of Proposals.
How to Write Grants Version 2009.
1 City of Fremont. 2 Budget Development Strategies 1.Reduction in Overall Employee Compensation Expenses 2.Transition to Alternative Service Delivery.
Application of Asset Management Principles During Asset Creation and Design Presented By Pervaiz Anwar at: CWEA, San Francisco Bay Section Asset Management.
Lecture(2) Instructor : Dr. Abed Al-Majed Nassar
VM SAVE International providing value ….. to the world VM Briefing SAVE International introduces “ Value Methodology ” Presentation version 1.
KING FAHD UNIVERSITY OF PETROLEUM AND MINERALS CEM-512 Value Engineering Think Value Engineering Prakash Acharya Charles Pfrommer Charles Zirbel JOURNAL.
IACT901 - Module 1 Planning Theory - Scope & Integration ABRS Hong Kong 2004 Penney McFarlane University of Wollongong.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Lean Training through IMPLEMENTATION THE WORKSmart! DIFFERENCE.
How to Effectively Implement Set-up Reduction in Any Organization.
Virginia Department of Transportation (VDOT) Value Engineering Program Virginia Department of Transportation (VDOT) Value Engineering Program VDOT 6/14/2012.
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
Using Value for Money Analysis to Evaluate Highway Public-Private Partnership Projects ARTBA P3 Conference Washington, DC, July 15-17, 2015 Patrick DeCorla-Souza,
December 4, National Capital Heavy Construction Association Committee of the Whole 2009 Draft Operating and Capital Budgets Tax Supported Programs.
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
Introduction to. Sep. 4, 1997 r Engineering economy relates or applies many concepts from economics, mathematics, finance, accounting, statistics, and.
Value Engineering.
Chapter 8: Problem Solving
PPP in the UK Ian Rylatt, Chief Executive Officer, Balfour Beatty Investments.
Dtengineering 1 of 16 The Product Development Process Introduction.
What is Value Analysis? Value Engineering a.k.a. Architorture”
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Reviewing Internal Sales Activity / Rates Reviewing Internal Sales Activity / Rates Internal / External Sales Office.
Enterprise GIS Planning and Framework Jennifer Reek GIS Coordinator City of Brookfield, WI.
TAKING ACTION TO MANAGE ENERGY TAME Buildings Initiative.
1 ECGD4214 Systems Engineering & Economy. 2 Lecture 1 Part 1 Introduction to Engineering Economics.
Grants to States to Support Oral Health Workforce Activities HRSA Pre-Review Conference Call April 14, 2015 U.S. Department of Health and Human.
NCHRP Project 8-49 Procedures for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction Draft Guidebook.
Transport Planning Society Bursary Scheme 18 th November 2009 What is the Role for Buses in Britain’s Future Low Carbon Economy? Laura Price.
CVE 4070 Construction Engineering Value Engineering Prof. Ralph V. Locurcio, PE.
5-1 Lesson 5 | Common Issues & Challenges. Describe how RSAs address project schedule (time), project cost, and agency liability concerns. Explain the.
ARA Conference March 28, 2012 | 1DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 27 March SR case # 12-S-1515 applies Nicholas.
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Solving Challenges Others Cannot Statutory Frameworks for Public Private Partnerships NCPPP/AGC Conference Phoenix, AZ Christopher D. Lloyd January 27,
Huron Consulting Report: Review of Oversight & Compliance for Research-Intensive ISOs CRAD Meeting April 23, 2015.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
BUILDING STRONG ® Value Methodology Applied to Levee Repairs Missouri River Basin 2011 Flood Repairs.
1 Introduction to Value Analysis Caltrans Delivers Value By Renee Hoekstra, CVS RH & Associates, Inc. for Caltrans.
Business Case Ganesh Botcha, Ajoy Chatterjee 16 Nov ’15, Monday.
Mobilising Local Energy Investment Funds in Greater Cambridge (MLEI) Contract No: IEE/11/036/SI October 2015 The sole responsibility for the.
Sept. 10 and 11, 2007Lake Tahoe TMDL - Phase Two1 Lake Tahoe TMDL Phase Two Fall 2007 Public Participation Series Source Category Group Focus Team Meetings.
Project Budget Review _ Control Developed by: Daniel J. Renna 3/16/20161.
Value Engineering (VE)
Office of Major Project Development (OMPD) Overview November 2015.
New Directions in Auditing Construction and Public Works Projects Part 2 Beth Woodward, CGAP, CIA, CCA Senior Management Auditor Audit Services Division,
How to Procure and Fund Sustainable Buildings Kym Murphy Senior Vice President Corporate Environmental Policy The Walt Disney Company White House Summit.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
VALUE ENGINEERING PRESENTED BY MOHAMMED DAANISH 4PA06ME024 1.
Integrity Innovation Accountability Commitment to Excellence Teamwork Values Item 8C Ord. No. 889-A; Amending the Fiscal Year Annual Budget
Economic Analysis in the Public Sector Benefit/Cost Analysis.
Pennsylvania Climate Change Act
Fort Stanwix National Monument Energy Audit Contract
Introduction to Project Management
CIFA 2016 Workshop Performance Based Infrastructure
(Additional materials)
MHA 612 Competitive Success/snaptutorial.com
MHA 612 Education for Service/snaptutorial.com
Presentation transcript:

Achieving Value: The How and Why of Value Engineering Paul Johnson, CH2M HILL Presented at the PNWS – AWWA 2008 Annual Conference Vancouver, Washington May 1, 2008

What is Value Engineering? A systematic problem-solving method Multidisciplinary VE team Structured process: 5-day (40-hour) study Conducted on capital improvement projects to save money without compromising function And to enhance function within the Owner’s budget VE usually pays for itself on projects over $5 million Requirement to conduct VE on projects over $25 million involving federal funding

The Value Equation V = F/C Where V = Value from the Owner’s Eyes F = Function C = Cost

History of VE Larry Miles, Father of Value Analysis, GE, WWII DoD adopted VE in 1954 for US Navy Bureau of Ships Got the Job done Faster, with Limited Resources Charles Bytheway introduced “Functional Analysis” to the VE Process VE is Huge in Manufacturing VE Process is applied to Capital Improvement Projects: Water, Wastewater, Transportation, Public Sector Buildings SAVE International – The Value Society

Why Use Value Engineering? Focuses on essential functions, not systems or procedures Embraces creativity and out-of-the-box thinking Uses life-cycle cost analysis for decision-making Provides and organized, multi-disciplinary framework for creative alternative development Consistently achieves desirable results: ROI from 5:1 to 50:1 and higher; or savings >5% of estimated project cost

Opportunities for Savings Facility Costs 10% Design Completion 25% Design CompletionAward of Contract Construction Complete Time Cost Reduction Potential Break Point Cost of Change

Value Engineering Employs Six Steps Information Creative Analysis Development Presentation Implementation

When to Use Value Engineering At Concept-Level to select a preferred design approach if several alternatives are envisioned to meet the project requirements High Opportunity for cost savings or functional enhancement at the early-to-mid design phase Too late to incorporate VE at the late design phase (VE is not a Constructability Review)

VE Examples Example VE Proposal Narrative discussing current design vs. VE alternative Supporting Calculations Supporting Sketch Summary Table

Achieving Value Tupelo, MS WWTP –Suggested VE Savings: $1 million –Accepted VE Savings: $500,000 NDOT Boulder City Bypass –Concept Level VE with 5 highway alignment alternatives –VE team selected and refined a sixth alternative for functional enhancement and $35 million savings on a $170 million project ROI typically in excess of 5:1 Accepted savings as % of construction usually greater than 5%

Summary History of VE What VE is and isn’t When to do VE and on what projects How VE is implemented Why VE is conducted Value Achieved from VE Q/A