An overview of Present Dam Safety Management in Sri Lanka Badra Kamaladasa Sri Lanka National Committee of Large Dams.

Slides:



Advertisements
Similar presentations
1 SAFETY ORGANISATION. 2 Safety Organisation 3 Safety Organisation - Regulator.
Advertisements

Matching the supply of technical assistance with recipient needs and ensuring best practices – a donor's experience Agust Jonsson, consultant
ROADS PAVEMENT FORUM ROODE VALLEI COUNTRY LODGE PRETORIA 13 November 2001 TECHNOLOGY TRANSFER CENTRES Kenny Kistan.
SYSTEM OF EVALUATION AND MANAGEMENT CONTROL RESULTS-BASED BUDGETING THE CHILEAN EXPERIENCE Heidi Berner H Head of Management Control Division Budget Office,
THE NORTH CAROLINA AGRICULTURAL WATER RESOURCES ASSISTANCE PROGRAM NC Water Resources Congress October 30, 2014.
Tailing Dams – A Consultants Perspective
INTERNATIONAL BEST PRACTICES IN ON-SITE INSPECTIONS OF INSURERS Thomas E Power Senior Manager, Emerging Market Practice Bearing Point.
Nineteen Years later…. Lessons learnt from Kantale Breach D W R Weerakoon Former Director General of Irrigation.
DAMS Dams are built for one or more of the following purposes: Irrigation Irrigation Flood Control Flood Control Power Generation Power Generation Water.
Public Procurement in The Rep. of Maldives
Central management of training Program development Local implementation of programs Government orientations, policies and structures Components of the.
Luke Gibbs. Job Description  Agricultural engineers use their knowledge to solve the problems of farmers and the agricultural industry. They work to.
Overview of Education Budgeting And Resource Allocation Process In Sri Lanka Nisha Arunatilake Roshani de Silva Institute of Policy Studies.
The National Institute for Certification in Engineering Technologies The “Hands-On” Partner of the Engineering Team.
Developing a Waste Water Discharge Fee Programme in Sri Lanka Kolitha Himal Muthukuda Arachchi Deputy Director General, Pollution Control Central Environmental.
WATER RESOURCES COMMISSION HUMAN RESOURCES AND WATER RESOURCES MANAGEMENT WASH STAKEHOLDERS WORKSHOP – HUMAN RESOURCES GAPS STUDY IN THE WASH SECTOR Water.
PUBLIC WORKS ORGANIZATION (S) by John Lisenko Definition: A public works organization is any organized system set up for the purpose of managing the physical.
Standards and Standardization. Standard Levels Standards preside according to the level. Their effect, image and their scope of work change from one level.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
3-1 Chapter 3 Central Bank. 3-2 Central Bank Definition:  “An institution which is charged with the responsibility of managing the expansion & contraction.
FINNISH LIBRARY NETWORK Division for Cultural Policy.
BP Centro Case Management job descriptions Team 5 Jiri Sorvari Jussi Tiilikainen.
SME SECTOR IN SRI LANKA. Definitions of SME’s Total Assets Value Excluding Land & Building less than Rs. 01 Mn- Micro Industries Total Assets Value Excluding.
ISO OPERATIONAL CONTROL
Project:“Support to the Internationalization of Kosova Higher Education System through establishment of the Kosova Students’ Union” Status Quo on Student.
OBJECTIVES 6. To compare road safety in a selected number of case studies: 1.Identify good practice in both LICs and HICs 2.Identify shortcomings 3. Summarise.
Workshop on the Legal Framework of EU Structural Funds’ Management for the Period Riga – Latvia, 4 & 5 December 2006 Head of Division, Preben.
Power Plant Construction and QA/QC Section 7.2 – Dams, Spillways, Water Conductors and Power Houses Engineering Technology Division.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Funding.
AUDITOR-GENERAL Presentation to the Public Service and Administration Portfolio Committee on the appointment and utilisation of consultants Report of the.
STRUCTURAL FUNDS MANAGEMENT IN GREECE: The experience of the Management Organisation Unit of the CSF Presented by: Dex. Agourides Director General M.O.U.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Azerbaijan.
VI. Developing a VSMP Program General Stormwater Training Workshop.
1 1st PMI AGC Energy Forum: DMS Debates NOCs in the GCC no longer need a PMC on a Project 2 nd June 2010 Essa Al-Ansari.
Maria J Moracho Ramirez Regulatory Activities Section
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Republic.
African Regional Director
1 E u r o p e a n C o m m i s s i o nDirectorate General Environment EU Water Initiative The EU Water Inititative The EECCA component.
16-17 November 2005 COSCAP – NA Project Steering Group Guangzhou, China 1 Co-operating with the European Aviation safety Agency.
SLANGPARK HOUSING DEVELOPMENT THEEWATERSKLOOF MUNICIPALITY.
Decentralizing Inspection Function in Thailand Warapong Tungittiplakorn Environmental Quality and Laboratory Division Pollution Control Department, Thailand.
1 Changes Brought by Implementing Regulations on Purchase / Sales of Cereals and Paddy Rice.
WELCOME 1.
1 The Future Role of the Food and Veterinary Office M.C. Gaynor, Director, FVO EUROPEAN COMMISSION HEALTH & CONSUMER PROTECTION DIRECTORATE-GENERAL Directorate.
Vocabulary Economic Basics Economic Systems Money and Banks
NHS Education & Training Operating Model from April 2013 Liberating the NHS: Developing the Healthcare Workforce From Design to Delivery.
1 Priority objectives for development of “Public Administration Reform, Local Government Decentralisation” sector UPGRADING THE LEGAL FRAMEWORK FOR CIVIL.
1 Response to Financial and Fiscal Commission Submission for The Division of Revenue 2010/2011 Presentation to Select Committee on Finance 06 August 2009.
IAEA International Atomic Energy Agency Arusha, Tanzania Uganda Dr. Akisophel Kisolo Project Counterpart 2 – 5 December 2013 RAF9038 Final Coordination.
Assessment of legislative and institutional mechanism for the river reservations in Sri Lanka: Case study in Geli Oya Sewwandhi Chandrasekara Research.
What is a Green Job & Where Can you Find One? Kevin Fleming Riverside WIB. April 21, 2010.
Capacity Building for the implementation of the Cartagena Protocol on Biosafety by the German Development Co-operation: German Federal Ministry for Economic.
Business Ownership. Owned & controlled by one person Most common type of business Found in wide range of activities.
1 Dams in Saudi Arabia: Types and Functions Faisal Fahad Al Harbi Majid Mufleh Al Motairi Hamad Al Mzroui Mulfi Mshej Al Otaibi Civil and Environmental.
Technical and Policy Guidelines to ensure successful adoption of rain water harvesting technologies for small scale irrigation in Zimbabwe Eng. Waddilove.
 Overview of Project management. ◦ Management. ◦ Project Management. ◦ Software Project Management. ◦ Project(Dimensions, Characteristics, Complexity,
Module 02 Essential Requirements for ATCOs. Training Objectives  Appreciate the content of the essential requirements for ATCOs as described within EASA.
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.
Making the Apprenticeship- Workforce Connection: Lessons from the Field
Egyptian Nuclear and Radiological Regulatory Authority (ENRRA)
The Development of Statistical Business Registers in
National Workshop on Planning for the GEOHealth Hub for Interdisciplinary Research and Training Policy, Regulatory and Organizational Frameworks Getnet.
Presentation of the case in Japan for Technical Committee K - Integrated Operation of Hydropower Stations and Reservoirs- Centers for Civil Engineering.
District Disaster Risk Reduction Managment Plan
China’s Standardization System
Collaboration with other government entities
Enterprise Content Management Owners Representative Contract Approval
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
Energy Regulatory Agency of Montenegro
IAEA - Department of Nuclear Safety & Security
Presentation transcript:

An overview of Present Dam Safety Management in Sri Lanka Badra Kamaladasa Sri Lanka National Committee of Large Dams

How many Dams in Sri Lanka? Medium and Large -320 Earth dams-307 Concrete gravity -08 Concrete double arch -01 rockfill -04 Small 12,000

Different categorizations Ancient dams – Original construction centuries ago, restored in 1850 onwards Recent dams – located in new places where no ancient dams existed Modern dams - dams with new technology Large Dams according to ICOLD classifications- 76

Who are the guardians? Irrigation Department Mahaweli authority Agrarian Development Department Provincial Councils Ceylon Electricity Board National Water Supply & Drainage Board Farmer Organisations NO PRIVATE OWNERS

Management Structure Irrigation Department Regional set up to cover whole country Practices and procedures developed over decades Services by Specialized Divisions Mahaweli Authority Engineers in charge at every major dam Practices and procedures developed over decades In house as well as Independent Inspection Team Agrarian Development Department Regional set up to cover whole country No regular inspection mechanism/Schemes are handed over to FOO Provincial Councils Different setups in different PCC Ceylon Electricity Board Outsource the relevant jobs until recently Established the dam safety organisation recently National Water Supply and Drainage Board Dam Safety function is diluted in the civil maintenance Farmer Organisations No definite setup

Financial capabilities Irrigation DepartmentLimited government funds (exclusively for dam safety) Mahaweli AuthorityLimited government funds (exclusively for dam safety) Agrarian Development Department Limited government funds (in a common budget) Ceylon Electricity BoardLiberal (even to get Loan facilities) Provincial CouncilsLimited central government /PCC allocation National Water Supply and Drainage Board Limited government funds Farmer OrganisationsNo funds

Technical capabilities Farmer Organisations – No technical background Agrarian Development Department – Dam Safety function is not identified National Water Supply and Drainage Board – Dam Safety function not identified, scope available to develop skill Provincial Council – Dam Safety function identified in certain PCC, Ceylon Electricity Board -Dam Safety function identified, scope available to develop skill Mahaweli Authority -Trained and Skilled group leaving / limited opportunities for newcomers Irrigation Department -Trained and Skilled group leaving / In a better position that other organisations/ limited opportunities for newcomers

Shortcomings Technical competency Financial limitations Absence of island wide national standards for designs Constructions Absence of island wide mechanism and standards for safety management Ambiguity over ownership and authority Priority always for water storage

Concluding Remark Absence of an independent regulatory authority Regulation done by the implementation agency itself Media becoming the pseudo regulating authority