August 2003 Blackout Review Brant Eldridge Executive Manager - ECAR.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
NERC Compliance An NWP Perspective
1 EMS User’s Group Meeting Deregulation Session Midwest ISO Status Update June 7, 1999 Findlay, Illinois Walter O.Stadlin KEMA Consulting, Horsham, PA.
August 14, 2003 Blackout Final Report
REN-Rede Eléctrica Nacional,S.A. Can the California and New York crisis occur in Europe ? Rui Pestana IST - 25th October 2003.
1539pk 2003 MAJOR POWER GRID BLACKOUTS IN NORTH AMERICA AND EUROPE Copyright © P. Kundur This material should not be used without the author's consent.
NERC and Regional Efforts to Ensure Reliability Dave Nevius, NERC Sr. VP David Cook, NERC VP & General Counsel Louise McCarren, WECC CEO Don Benjamin,
1 “The National Grid” Presented To The Fall Tri-State Member Services Conference October 10, 2001 Covington, KY Jeff Mitchell ECAR Manager, Transmission.
The Continuing Evolution of U.S. Electricity Markets
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
The Midwest Independent Transmission System Operator, Inc. An update By Jim Torgerson President and CEO Midwest Independent Transmission System Operator,
1 Blackout 2003 See:
August 14 th NE Blackout and Common Roots of Blackouts Damir Novosel, PhD President KEMA Inc., T&D Consulting BLACKOUT AMERICANO E ITALIANO:
Dayton Power and Light Patrick Slone EMS Safety Coordinator.
FUNCTION 6 – CONTINGENCY PLAN, PREPAREDNESS AND CAPACITY BUILDING
Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
Draft SAWG/RAWG Agenda Survey A Presentation to the MISO Supply Adequacy Working Group by the OMS Resource Adequacy Working Group August 16, 2004.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Spare Transformer Equipment Program (STEP) Public Service Commission of Utah – Technical Conference July 8, 2014.
Integrated Security Analysis Pete Sauer, PSERC – Illinois Kevin Tomsovic, PSERC – WSU Steve Widergren, PNNL January 27-29, 2004 Washington, D.C. Transmission.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
Compliance Monitoring and Enforcement Audit Program Background Information.
FERC’s New Reliability Initiatives Kevin Kelly Director, Policy Analysis, OMTR Federal Energy Regulatory Commission NARUC Annual Meeting Nashville, TN.
George A. Godding, Jr. Director, Management and Communications Office of Market Oversight and Investigations Comments are the speakers and do not necessarily.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Overview of WECC and Regulatory Structure
Sec. 5 RE-REGULATION- EPAct 1992 FERC Orders 888 and 889 (1996) EPAct 2005 In short these three laws move the power industry towards an increase in competition.
1 August 14, 2003 Blackout MAC Meeting October 8, 2003 Paul Murphy IMO.
Mandatory Electric Reliability Standards and Transmission Expansion Suedeen G. Kelly Commissioner Federal Energy Regulatory Commission The Canadian Institute.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
Project Real-time Monitoring and Analysis Capabilities Mark Olson, Senior Standards Developer Texas RE NSRS October 5, 2015.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
1 RIC 2009 Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation George Wilson NRR/ADES/DE/EEEB March 11, 2009.
The Electric Reliability Organization: Getting from here to there. Gerry Cauley Director, Standards ERO Project Manager ERO Slippery Slope NERC Today Uphill.
RELATIONSHIP BETWEEN COMPETATIVE POWER MARKETS AND GRID RELIABILITY PJM RTO EXPERIANCE vis – a – vis PRACTICES FOLLOWED IN INDIAN GRIDS.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
Standing Up The New Electric Reliability Organization Ellen P. Vancko North American Electric Reliability Council.
NERC Event Analysis Overview ERCOT ROS Meeting Austin, Texas May 15, 2006.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
SUPPLEMENTAL ENVIRONMENTAL PROJECTS. KEY CHARACTERISTICS OF A SEP Projects must improve, protect or reduce risks to public health or environment. Projects.
1 MOSC Presentation Grid Collapse 2003 September 22/2004 Information is preliminary subject to ongoing investigations Certain material is from NERC and.
Briefing to the Portfolio Committee on Rural Development and Land Reform (DRDLR) Audit outcomes of the DRDLR portfolio 2 February 2016.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
PJM©2014www.pjm.com A System Operator’s Resilience Wish List Tom Bowe Executive Director Reliability and Compliance PJM Interconnection
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Reliability and the Market Place Perfect Together The Transition from NERC to NAERO Baltics Working Group June 6, 2001 Princeton, NJ The Transition from.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
NERC Reliability Readiness The Next Steps
EIA approval process, Management plan and Monitoring
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Regional Transmission Organizations
NERC TPL Standard Overview
Joint U.S.-Canada Power System Outage Investigation
Understanding Existing Standards:
Impacts and Actions Resulting from the August 14, 2003 Blackout
New England Resource Adequacy
The Electric Reliability Organization: Getting from here to there.
Adding Value Across the Board
Overview of WECC and Regulatory Structure
Presentation transcript:

August 2003 Blackout Review Brant Eldridge Executive Manager - ECAR

Presentation Topics ECAR Overview Blackout Review 2

3

Current ECAR Members (22) Allegheny Power American Electric Power Big Rivers Electric Corporation Cinergy Corporation Consumers Energy Dayton Power & Light Company DTE Energy Duke Energy North America Duquesne Light Company East Kentucky Power Cooperative, Inc. FirstEnergy Grid America Hoosier Energy Rural Electric Cooperative, Inc. Indianapolis Power & Light Company International Transmission Company LGE Energy Michigan Electric Transmission Company, LLC Midwest Independent System Operator Northern Indiana Public Service Company Ohio Valley Electric Corporation PJM Interconnection LLC Vectren Energy Delivery of Indiana 4

Current Associate Members (16)  American Municipal Power-Ohio, Inc.  Buckeye Power, Inc.  Municipal Cooperative Coordinated Pool  Wabash Valley Power Association, Inc.  Indiana Municipal Power Agency  Independent Electricity Market Operator  Commonwealth Edison  Tennessee Valley Authority  Cargill Power Markets, LLC  Mirant Americas, LLP  Constellation Power Source, Inc.  Conective Energy Supply, Inc.  FirstEnergy Solutions, Inc.  CMS Energy Resource Management Company  Edison Mission Marketing and Trading  PSEG Power, LLC 5

Blackout Review 6

Previous Major Outages November 9, 1965  30 Million People Affected  20,800 MW Load Dropped  13 Hours to Restore  New York, New England, Pennsylvania, Ontario July 13, 1977  9 Million People  6,000 MW  26 Hours  New York City 7

Previous Major Outages August 10, 1996  7.5 Million People  28,000 MW  9 Hours  12 Western States 8 July 2, 1996  2 Million People  11,850 MW  Several Hours  14 Western States, 2 Canadian Provinces, Baja Mexico

August 14, 2003 Outage Largest Cascading Blackout Ever  50 Million People  61,800 MW  45 Hours  Ohio, Michigan, Ontario, Quebec, Northern New Jersey, Massachusetts, Connecticut, New York City 9

4:13 PM – Cascading sequence essentially complete 10

Principal Investigations of August 14, 2003 Blackout U. S – Canada Power System Outage Task Force  Interim Report issued November 2003  Final Report issued April 2004 North American Electric Reliability Council (NERC)  Provided significant technical input to U.S. – Canada investigation  Initial Report issued February 2004  Final Report issued July 2004 ECAR  Two Reports issued February 2004  “Technical Report” and “Recommendations Report” 11

Key Findings  U.S. – Canada Task Force Investigation Initiation of blackout occurred in FirstEnergy’s system in northern Ohio Blackout could have been prevented Blackout caused by deficiencies in specific practices, equipment, and human decisions by various organizations Four basic causes of blackout  Inadequate system understanding  Inadequate situational awareness  Inadequate tree trimming  Inadequate Reliability Coordinator diagnostic support Final Report available on DOE and NERC websites 12

Key Findings  NERC Investigation Violations of existing NERC reliability standards contributed to blackout FE’s system in northeast Ohio was being operated with insufficient reactive margins Relay protection and controls could be used more effectively to slow or minimize spread of a cascading outage Key contributing factors from previous blackouts were repeated  “Three T’s” Final Report available on NERC website 13

Common Elements Of Major Outages  Trees  Vegetation Management  Tools  For system operators to monitor and assess wide area to evaluate what actions are needed to arrest a potential major outage  Training  Simulators, structured programs, drills to assure that operators are prepared to take appropriate actions 14 “Three T’s”

Key Findings  ECAR Investigation Two primary factors led to the disturbance  Tripping of lines below their emergency ratings  Insufficient intervention to relieve line overloads Absence of either primary factor would probably have avoided the disturbance becoming a cascading blackout Secondary factor that caused system conditions to be worse than otherwise as outages occurred was shortage of reactive resources in initiating area  But this factor did not initiate the disturbance Final Reports available on ECAR website 15

Examples of Blackout Investigation Recommendations U. S. – Canada Task Force  Need for Congress to pass reliability legislation that would make compliance with reliability standards mandatory and enforceable with penalties for non-compliance  Development of regulator-approved funding mechanism for NERC/RRCs to ensure independence from parties they oversee  Evaluate and develop appropriate modifications to existing institutional framework for reliability management  Examine and clarify future role of RRCs with focus on mandate, scope, governance, responsibilities, resource requirements, geographical boundaries 16

Examples of Blackout Investigation Recommendations  Remedial actions by FE, MISO, and PJM by June 30, 2004 to address causes of August 14, 2003 blackout  Strengthen and implement communication protocols between Reliability Coordinators, Control Areas, and RTOs  Review, update, and train on contingency plans for loss of monitoring and control systems  Review, update, and train on emergency plans  Confirm that transmission line ROWs are clear of obstructions  Readiness audits of Control Areas and Reliability Coordinators  Re-evaluate system design, planning, and operating criteria  Develop standard for vegetation management 17 NERC

Examples of Blackout Investigation Recommendations  Take action regarding violations of NERC standards on August 14, 2003  Conduct “peer review” of ECAR member companies seasonal and long-term transmission assessments  Audit existing vegetation management plans and adherence to the plans  Confirm that ECAR RCs have authority to order CAs to drop firm load if deemed necessary to prevent a cascading outage, and that CAs will do so if ordered  Review reactive and voltage practices of ECAR members  Revise existing ECAR Documents/develop new ones, as needed, to address blackout investigation recommendations 18 ECA R

Closing Observations Since August 2003 blackout, considerable progress has been made to minimize likelihood of another blackout Demand for electricity (load) continues to grow  As does generation capacity to serve the load In last two decades, relatively little new transmission infrastructure has been built Interconnected transmission system is now being used in ways for which it wasn’t designed  Long distance transfers of large amounts of power 19

Closing Observations Until transmission system gets enhanced/improved, system operators have to be even more vigilant than normal and ready to deal with problem situations to avoid potential major outages 20 Transmission system is operating with less overall margin than in past  Operating closer to limits more of the time  More vulnerable to something going wrong

Closing Observations Enactment of reliability legislation to make compliance with reliability standards mandatory and enforceable Enactment of broad policies that foster a healthier grid investment climate  New transmission lines are needed in some areas  Also need to utilize new technologies to enable existing lines to carry more capacity reliably 21 Two key things need to happen to improve the current situation

QUESTIONS ? 22