CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES International Great Lakes Datum (IGLD) Overview Coastal Zone 2011 “ Cool Geodetic Resources.

Slides:



Advertisements
Similar presentations
1 Michigan HMOD Update Shawn Roy 2014 HMOD National Meeting NOAA Gulf of Mexico Disaster Response Center April 30, 2014 Mobile, AL.
Advertisements

Tidal and Geodetic Vertical Datums State Geodetic Advisor, NGS National Ocean Service, NOAA Sacramento, CA October, 2005 Workshop.
National Ocean Service Budget Update for the NOAA Hydrographic Services Review Panel Glenn Boledovich, Chief NOS Policy, Planning and Analysis Division.
Assistant Administrator National Oceanic and Atmospheric Administration National Ocean Service September 18, 2008 John H. Dunnigan Toward National Height.
Alabama Height Modernization Project, NAD 83(2011), and GEOID 12 in Alabama Overview of Height Modernization Project Overview of Height Modernization.
National Height Modernization Program (NHMP) Update Great Lakes Region Height Modernization Consortium Meeting Columbus, OH October 13, 2011.
Tidal Datums Text and Figures Source: NOAA/NOS CO-OPS Tidal Datums related publications.
Coastal Zone 2011 Conference “Cool Geodetic Resources For Your Project” A National Ocean Service, NOAA, Presentation 1)TOOLS TO OBTAIN GEODETIC CONTROL.
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting Tuesday, November 3, 2009 Juliana Blackwell Director,
NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.
2015 Height Modernization Partner Meeting April 14, 2015.
Better Positions and Improved Access to the National Spatial Reference System  Multi-Year CORS Solution  National Adjustment of 2011  New NGS Datasheet.
Refinements to the North American Datum of 1983 Multi-Year CORS Solution and the National Adjustment of 2011 Dr. Neil D. Weston Chief, Spatial Reference.
CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES GPS Requirements for the National Water Level Program Applications of GPS/GNSS in NOAA Cross-NOAA.
NOAA National Ocean Service Data and Datum-Informed Decision- Making: Understanding Essential Integrated Data Needs for Informing SAGE Juliana Blackwell.
and IGLD 85 Hydraulic Correctors
Juliana Blackwell, Director National Geodetic Survey, NOAA
Streamgage Datum Conversion Great Lakes Region Height Modernization Consortium meeting New Cumberland, PA April 13, 2011.
SENTINEL SITES: A NATIONAL NETWORK TO MONITOR SEA-LEVEL IMPACTS Coastal and Estuarine Research Federation Conference November 7th, 2013, San Diego, CA.
International Great Lakes Datum Overview Presented at a Height Modernization Program meeting January 9, 2014 by David Conner Geodetic Advisor to the State.
Streamgage Datum Conversion Eastern Region Height Modernization Consortium Webinar March 4, 2014 Jim Kolva, USGS, Office of Surface Water.
NGS HSRP Update Ronnie Taylor, Acting Director National Geodetic Survey, NOAA October 13, 2010.
The Future of the National Geodetic Survey Dr. Dru A. Smith Chief Geodesist, NGS/NOAA CSRC, Coordinating Council Spring Meeting La Jolla, CA April 28,
National Geodetic Survey Update Providence, RI May 6, 2010 Juliana Blackwell Director, National Geodetic Survey.
A New & Improved National Spatial Reference System Refinements of the North American Datum of 1983 through the Multi-Year CORS Solution and the National.
GRAV-D Project Update Vicki Childers, Ph.D. GRAV-D Project Manager.
Coastal GeoTools ’05, March 7, 2005 Coastal GeoTools ’05 Myrtle Beach, SC March 7, 2005 FGDC Marine and Coastal Spatial Data Subcommittee.
2010 Hydrographic Services Review Panel David Steele, PLS DNR Geodetic Survey Director & Spatial Reference Center of Washington.
Geoid Modeling at NOAA Dru A. Smith, Ph.D. National Geodetic Survey National Ocean Service, NOAA November 13, 2000.
GRAV-D the International Great Lakes Datum and a Tale of Subsidence Presented at a meeting of the Great Lakes Regional Height Modernization Consortium.
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting Tuesday, November 3, 2009 Juliana Blackwell Director,
Coastal Zone 2011 Conference “Cool Geodetic Resources For Your Project” A National Ocean Service, NOAA, Presentation 1)TOOLS TO OBTAIN GEODETIC CONTROL.
Lecture 18: Vertical Datums and a little Linear Regression GISC March 2009 For Geoid96.
AEC Summit NOAA’s National Geodetic Survey Update Brian Shaw Geodesist.
Who Needs New Datums? NGS Says… ftp://ftp.ngs.noaa.gov/pub/marti Marti Ikehara California Geodetic Advisor, Sacramento.
National Geodetic Survey – Continuously Operating Reference Stations & Online Positioning User Service (CORS & OPUS) William Stone Southwest Region (UT,
The GRAV-D Project and The Future of NAD 83 and NAVD 88 A briefing for FEMA leadership Dru Smith, Chief Geodesist NOAA’s National Geodetic Survey.
The National Geodetic Survey Gravity Program Benefits and Opportunities Juliana Blackwell, Director National Geodetic Survey (NGS)
New Vertical Datum: plans, status, GRAV-D update FGCS San Diego, CA. July 11, 2011 Mark C. Eckl NGS Chief of Observation and Analysis Division, New Vertical.
NATIONAL READJUSTMENT WHAT WHY HOW WHEN NAD83(NSRS)
U.S. HYDRO 2007 TIDES WORKSHOP May 17, 2006 UNCERTAINTY WORKSHOP SKGILL SLIDES.
NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES CO-OPS NWLON and Seasonal Gauging in the Great Lakes - FY14 Efforts September 16, 2014.
MISSISSIPPI HEIGHT MODERNIZATION PROJECT JUNE 11, 2009 By Ronnie L. Taylor Chief, Geodetic Advisor Branch NOAA, National Geodetic Survey.
Great Lakes Environmental Research Laboratory Review – Ann Arbor, MI November 15-18, Click to edit Master text styles –Second level Third level.
Why do Millimeters Matter? NOAA Models and Tools Support High Accuracy Positioning for Ecosystem Restoration and Ecological Research Surface too low: too.
2015 International Great Lakes Datum Height Modernization Project Dave Rigney NGS Geodetic Advisor Michigan Great Lakes Region Height.
NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Laura Rear McLaughlin Center for Operational.
National Ocean Service NGS, NOS, NOAA Real-Time GPS Positioning of Ships To Integrate Navigation Services Real-Time GPS Positioning of Ships To Integrate.
The Height Modernization Program in the United States and the Future of the National Vertical Reference Frame 1 Renee Shields National Geodetic Survey,
VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey January 10, 2012.
Benefits of the New Reference Frames Dru Smith Joe Evjen 60 minutes April 13, Geospatial Summit1.
Height Modernization in the U.S.: Implementing a Vertical Datum Referenced to a Gravimetric Geoid Model Renee Shields National Geodetic Survey, U.S.A.
Datums Computation Overview Center for Operational Oceanographic Products and Services January 8, 2009.
The Delta Levees Program
National Geodetic Survey Update Hydrographic Services Review Panel Honolulu, HI May 4, 2011 Juliana Blackwell Director National Geodetic Survey.
Understanding your reference datum – it can be a cost saver!
Height Modernization Activities at NGS Christine Gallagher National Partner Meeting April 30, 2014.
GREAT LAKES REGION HEIGHT MODERNIZATION CONSORTIUM NATIONAL HEIGHT MODERNIZATION PARTNER MEETING APRIL 14, 2015.
National Height Modernization Program Strategic Plan Renee Shields, Height Modernization Program Manager.
Geodetic Applications of GNSS within the United States Dr. Gerald L. Mader National Geodetic Survey NOS/NOAA Silver Spring, Maryland USA Munich Satellite.
Precise Digital Leveling Section 6 Vertical Datum.
VERTICAL DATUMS APRIL 08, 2008 By Ronnie L. Taylor Chief, Geodetic Advisor Branch NOAA, National Geodetic Survey.
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting 11 January 2011 Ronnie Taylor Acting Director,
GRAV-D: NGS Gravity for the Re- definition of the American Vertical Datum Project V. A. Childers, D. R. Roman, D. A. Smith, and T. M. Diehl* U.S. National.
Overview of Datums Commonly Used in Michigan and the National Spatial Reference System Michigan Society of Professional Surveyors 70 th Annual Meeting.
October 24, 2005 Silver Spring, Maryland MinnesotaDixon Hoyle MichiganDave Rigney Illinois Chris Pearson Ohio Dave Conner KentuckyRoss Mackay Convocation.
Geodetic Control and Datums Where is it? How Accurately can we map it?
The Future of the National Geodetic Survey Dr. Dru A. Smith Chief Geodesist, NGS/NOAA NGS Convocation Silver Spring, MD October 24, 2005.
Lecture 17: Geodetic Datums and a little Linear Regression
Presentation transcript:

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES International Great Lakes Datum (IGLD) Overview Coastal Zone 2011 “ Cool Geodetic Resources For Your Project” A National Ocean Service, NOAA Presentation” Stephen Gill, Chief Scientist NOAA/NOS Center for Operational Oceanographic Products and Services

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES An International Partnership Natural Resources Canada Environment Canada Fisheries and Oceans Canada

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Why and How was IGLD Established? The management of Great Lake water resources is a shared responsibility between the US and Canada under the auspices of the International Joint Commission and other coordinating bodies. An international study was first established in 1953 jointly by Canada and the US in recognition of the need for agreement on hydrologic and hydraulic factors and acceptance of common reference datum. The Vertical Control-Waters Levels Subcommittee of the Coordinating Committee on Great Lakes Basic Hydraulic and Hydrologic Data established the International Great Lakes Datum (1955) that was implemented in January 1962 and used for the following 30-years.

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Why and How was IGLD Established? The Vertical Control-Water Levels Subcommittee addressed the following topics in the course of establishment of IGLD (1955): Establishment of a datum reference zero near the mouth of the St Lawence River. First-order leveling from the reference zero to Lake Ontario and between the lakes. Crustal movement in the Great Lakes Area, and Establishment of elevations of bench marks and reference surfaces in the Great lakes-St. Lawrence River System.

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Why and How was IGLD(1985) Established? The Vertical Control-Water Levels Subcommittee noted that crustal movements causesbench marks to shift in position, typically only small changes over a 3-5 –year period, but significant after years. The development of IGLD (1985) was designed to coincide with the development of the North American Vertical Datum (1988). The US-Canadian Network adjustment adopted for IGLD (1985) was based on 78 geodetic leveling loops and connecting over 80 water level gauges. Based on the recommendations of the Coordinating Committee, IGLD (1985) was adopted and implemented in January 1992

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Features of IGLD(1985) Elevations, consistent with one another as of a recent update (1985) were provided for bench marks throughout the Great Lakes-St. Lawrence River System, with the reference zero at Pointe-au-Pere/ Rimouski. The elevations given on IGLD (1985) are based on the dynamic principle, and are therefore more suitable for hydraulic studies. Elevations on IGLD (1985) greatly facilitated hydraulic, hydrographic and other engineering studies.

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES IGLD 85 Heights Dynamic heights are relevant near large bodies of water such as reservoirs or very large lakes, so the Great Lakes are an ideal candidate for dynamic heights. The Great Lakes are referenced to the International Great Lakes Datum of 1985 (IGLD 85) dynamic heights. IGLD (1985) elevations and NAVD (1988) elevations are not the same because IGLD (1985) elevations are published as dynamic heights and NAVD (1988) elevations are published as Helmert orthometric heights.

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Hydraulic Correctors An important component of the IGLD (1985) system is the computation of Hydraulic Correctors (HC). Hydraulic correctors are applied to each gauge location on a lake assuming each location should have the same Mean Water Level (MWL) as the Master Station for each lake. This is accomplished by performing simultaneous comparisons of MWL between subordinate gauges and the Master Stations for the summer months (June- September) over a 7-year period. For IGLD (1985)this was from The comparisons were referenced to Dynamic Heights at each station to obtain the hydraulic corrector. The Hydraulic Corrector for each gauge was then subtracted from the Dynamic Water Surface elevation at the station to obtain IGLD (1985) at the subordinate gauge.

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Master Stations for Each Great Lake Lake Ontario-Oswego, NY Lake Erie-Fairport, Ohio Lake St. Clair-St. Clair Shores, Michigan Lake Huron-Harbor Beach, Michigan Lake Michigan- Harbor Beach, Michigan Lake Superior-Marquette, Michigan

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Why is the IGLD important? Coordinated management of worlds largest fresh water resources, supports regulatory decisions. A fundamental requirement for shared management is a common elevation reference datum for water levels. IGLD is the reference for nautical chart datum/low water datum; update nautical charts for navigation safety. Accurate reference system provides geophysical framework for marine spatial planning. Supports beach re-nourishment and marsh/wetlands restoration. Climate change monitoring and assessment.

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Navigation Datums for each Great Lake and Interconnecting Waterways are Defined Relative to IGLD – These Reference Datums are called Low Water Datum (LWD) Elevations in Meters

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum (IGLD) Movement of the earth’s crust due to isostatic rebound requires the revision of the datum, or elevation reference system used to define water levels within the Great Lakes-St. Lawrence River system, every 25 to 30 years. This system, one of the world’s greatest fresh water resources, is shared and its resources jointly managed by the United States and Canada. The revision of this elevation reference system, the International Great Lakes Datum (IGLD) requires the updating of the Dynamic Heights so as to reference IGLD at approximately 140 small harbors, 50 subordinate control stations, as compared to the 5 master control stations in the United States alone. The revision is targeted for the central year 2015, implementation several years later. The revised datum is critical for updating nautical charts for navigation safety, particularly during periods of low water levels.

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Why is a new IGLD Update Required? Isostatic rebound continues from the retreat of the glaciers results in movement of the earth’s crust.

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Why is an IGLD Update Required? The rate is not uniform, with northern/western Lakes generally tilting up while southern/eastern Lakes are subsiding. Systematic inaccuracies inherent to 1980’s survey technology increased as level lines run from east to western Lakes. Differences ranged from inches to almost a foot and a half from east to west in the last update from IGLD55 to IGLD85.

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES How will IGLD1985 be updated to IGLD2015? Two coordinated components: Height modernization – Geoid based vertical datum Seasonal water level gauging – update heights and low water datum for small harbors

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Height Modernization Accurate gravity is foundation of heights. National Geodetic Survey recently published GRAV-D plan for modernization of new national vertical datum for Enables accurate transformation of ellipsoid (GPS) to orthometric (geodetic) heights. Improves accuracy of heights to a few centimeters Enables use of GPS for IGLD, eliminates need for more costly line-of-sight geodetic surveying The GRAV-D Project: Gravity for the Redefinition of the American Vertical Datum

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Continuously Operating Reference Stations (CORS)  13 CORS co-located with NWLON stations  Monitor varying rates of isostatic rebound  Helps to identify absolute long-term water level changes  Navigational positioning

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES CORS Operating at Great Lakes Gauging Stations in Support of IGLD Update Lake Ontario Oswego – (OSPA) Lake Erie Buffalo – (BFNY) Cleveland – (OHCD) Marblehead – (OHMH) Lake Huron Harbor Beach – (HBCH) Alpena – (MIAL) Lake Michigan Ludington – (MILT) Calumet Harbor – (CALU) St Mary’s River West Neebish Island – (MINB) Lake Superior Pt. Iroquois – (PTIR) Marquette – (MIMQ) Grand Marais – (GDMA) Two gauging stations built in 08 are ready for CORS equipment to be installed, Mackinaw City and Little Rapids, MI. Two new gauging stations are being built summer of 09 with expectations for installing CORS equipment, Holland and Menominee, MI.

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Seasonal Water Level Gauging Program  Update low water datum at >125 sites in small harbors and rivers  Requires data collection, localized leveling, and GPS observations at each site  Determination of hydraulic corrector for each site is the key product from the effort  Funding levels included in the CO-OPS strategic plan for the IGLD update  Support from various partners such as MDOT, WIDOT, MNDOT, OHDOT and other agencies is essential

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES NOAA Seasonal Gauging Program IGLD 2015 Update Install sites each summer; operate June – September 5-6 years data collection

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Preliminary Planning for IGLD Update  Planning team of NGS and CO-OPS personnel formed in April 2008  Planning first presented at the Canadian Hydrographic Conference in May 2008  Joint strategic planning between NGS and CO-OPS being emphasized  FY11 budget request submitted in May 2008 – included GRAV-D and seasonal water level gauging projects needed to update IGLD – but was not funded

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Preliminary Scaled-Back Planning for IGLD Update  Compute new updated Mean Water Level at 5 Master stations over new time period.  Continue to obtain GPS measurements at water level stations  Update IGLD elevations only at existing Great lakes stations and not at the >125 historical season gauging locations.  Continue with height modernization and GRAV-D in the region.  Continue to pursue local and federal funding opportunities to complete full implementation

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Outreach  Increased awareness of the need for the IGLD update increases chances of funding.  CHC Poster Session (May 08) in Victoria, BC.  NGS Height Modernization meetings (Sept 08) in Wisconsin and March 09 in Michigan  CO-OPS and NGS seeking additional outreach opportunities and partners  Similar actions by Canada demonstrate the international partnership required for the project  IJC and CCGLBHHD support also needed

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES CO-OPS and NGS Contacts Jeff Oyler, Field Operations Division Dr. Dru Smith, Chief Geodesist, NGS x 144 Tom Landon, Engineering Division x

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Upcoming Training and Informational Opportunities  Webinar:Introduction to Geodetic and Tidal Vertical Datums, August 16th and 18th, 2011 < Datums_0811.shtml>  Introduction to Geodetic Vertical Datums/: Tuesday, August 16, 2011, 1:00- 4:00pm ET, presenter Dave Minkel.  Introduction to Tidal Datums/: Thursday, August 18, 2011, 1:00-4:00pm ET, presenters Michael Michalski and Scott Duncan.  Geodetic Digital Leveling Class, October 25-27, Open seats. On-site class, to be held at the Corbin Training Center. < html>  Sign-up and get more information at: