Chief Operating Officer Greg Johnson. 7 Million Sheets of Paper.

Slides:



Advertisements
Similar presentations
Bob Smith, P.E. Region 1 Benjamin Acimovic, P.E., Region 1
Advertisements

Internet Contracting Estimating and Accounting System ICEAS Multi-Client Software Presented By: I C E A S.
The Greening of North Carolina Network NCSU IES: GNCN:
Presented by Cheri Sylvester Asst. Estimates Coordinator Florida’s Turnpike Enterprise Presented by Cheri Sylvester Asst. Estimates Coordinator Florida’s.
FHWA Sustainable Highways Self- Evaluation Tool Tracking Environmental Commitments Recycle and Reuse Materials Construction Equip. Emission Reduction Construction.
Intuit Master Builder 7 System Tour Solution Resources
OTIA III State Bridge Delivery Program CEI Tool Ron Reisdorf, PE Senior Construction Engineer Oregon Department of Transportation April 9, 2008.
17 AND 18 AUGUST, 2010 EUGENE, OREGON RON SINGH CHIEF OF SURVEYS /GEOMETRONICS MANAGER OREGON DEPARTMENT OF TRANSPORTATION Design to Dozer.
Road and Bridge Contractor use of FieldManager in Michigan 2004 AASHTO TUG Mobile, Alabama Cliff Farr - Michigan DOT October 15, 2004.
Research Advisory Committee Annual Meeting FHWA Briefing Michael Trentacoste Associated Administrator Research, Development, & Technology Director, Turner.
Envisage BlackBerry Application. Envisage Software from Fusion5 Fusion5 is partnering with Gen-I to develop Envisage applications for BlackBerry handhelds.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Mayors’ Technology Summit.
Reverse Auctioning at the University of Pennsylvania SUNY Purchasing Association Fall Conference October 9, 2003.
Working with 3D Models in Design & Construction Panel Discussion 1.
Modernization of Approvals Presentation to Air Practitioners
ROI of social media for internal Communications & Collaboration Top Communications Conference - Davos Philippe Borremans Chief Social Media Officer Van.
By Joshua Reddick.  Direct and coordinate the design, manufacture, and testing of aircraft and aerospace products  Assess proposals for projects to.
Technology Tips to Enrich Your Enterprise Courier Magazine, September 21, 2011.
Wireless Solution Training for the (Enterprise) Carpeted Office February 2004 Tina Herrera
Xora GPS TimeTrack™ Take charge of your mobile workforce.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Jurisdictional Presentation May 21 st 2015 New Online Business Filing System.
FDOT’s Path to e-Construction
GETTING HELP FOR LARGE ENERGY EFFICIENCY IMPROVEMENTS AT A SMALL COLLEGE Anne Duncan, Environmental Sustainability Coordinator Terry Rowe, Sales Team Leader.
Safety Project Request received by TDOT Safety Project Request sent to RSAR Coordinator Safety Planning Office completes Letter of Findings for internal.
CEE8207 Summer2013 L# Today’s Topic Technology and Sustainable system  Renewable Energy  ITS  Materials CEE8207 Summer2013 L#7 3.
Richard Jordan, President OPM Winter Meeting 12/4/2012 How To Create A Paperless Office (without breaking the bank)
Itella Information 2010Itella Information1. Itella in Brief 2010Itella Information MEUR Net Sales 2009 Sales and Marketing Supply Chain and Logistics.
AASHTO Subcommittee on Construction 2010 Annual Meeting Summary of C&T Section Work Plan Surveys August 16–20, 2010 Summary of C&T Section Work Plan Surveys.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
NC Region Speakers:. Now What?  EBS  Pothole  Vac Truck  T & M  Force Account  Con Mod/Change Order  LCS  QMP (QC, QV, IA)  QC  QV  IA Excavation.
Encouraging Transportation Investment Saginaw County Chamber of Commerce Percolator Breakfast May 2, 2013 Horizons Conference Center Rich Studley, President.
Presentation Path  Introduction to Ved Consultancy and OpenText  Current Challenges  The Valued Customers and Sectors  Our Solutions  Demo. Together,
Overview Based on Indiana’s first A+B+C Contract. Why Warranty? What is in it for the Contractor? Lessons Learned?
© 2012 Bentley Systems, Incorporated Jimmy Lau Technical Resource Manager A Spatially Enabled Real-Time Traffic Information Managed Environment.
GPS TimeTrack™ for Distribution. Proprietary and confidential. All rights reserved. Xora, Inc. 2 Business challenges Limited visibility –It’s difficult.
Jennifer Livingston, P.E. ADOT – Senior Project Manager.
Extendata Steve Sager President & CEO Extendata Bob Specchio Director, Solutions Consulting Extendata
Law Practice Management Problem Philip Coffaro, Brad Kimber, Christian Pipas.
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
1 Bringing Machine Control to California DOT (Caltrans) Construction Projects Kevin Akin, LS Office of Land Surveys.
Douglas Townes FHWA Resource Center 3D Engineered Models for Construction - Implementation March 14, 2013 | Washington, DC TRB Committee on Intelligent.
General Contractor Davon Woodard February 11, 2014 Career Tech.
INTRODUCTION TO MANAGEMENT INFORMATION SYSTEM. INTRODUCTION Now a day, there are many companies, which depend on their computers for their day-to-day.
Greening of IT – The Business Case May 2009 Presented By: Information Access Systems & The Virginia Department of Motor Vehicles.
Michele Mueller Senior Project Manager Applying Intelligent Transportation Systems to Cross Border Issues TC / FHWA Regional Roundtable Mike Barnet Senior.
Technology Supply Chain Management
Digital recordkeeping strategy for mobile work processes Joel Smith HPRM System Administrator.
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
E-BILLING MOTIVATION. Introduction  E-billing is the electronic delivery of financial documents to the customer, that represents and replaces the conventional.
IN THE FIELD Intuit Field Service Management for QuickBooks Enterprise Solutions powered by Corrigo START Slide 1 of 10.
Creating Fundraising Frenzy!
MDOT Geotechnical Construction Support Anthony Pietrangelo, P.E. Geotechnical Construction Support Engineer Midwest Geotechnical Conference September 22,
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Construction zones and traffic control Objective Review extent of problem Identify contractor responsibilites Identify control plan components.
How are Highway Designs Actually Represented in Surface Models for Automated Machine Guidance and How Should We Control Them? Alan Vonderohe Construction.
Slide 1 Software Construction Software Construction Lecture 3.
Post-Consumer Reclaimed Asphalt Shingles in Asphalt Pavement February 2012 James M. Ross Asphalt Quality Control Manager Greenville Paving & Contracting,
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
PROJECT COMMUNICATION PROCEDURE AND DOCUMENT MANAGEMENT
Benefits of Going Paperless and Digital in Your Regulatory Program
2013 Nevada Transportation Conference
AASHTO Subcommittee on Construction Contract Administration Section
Business Communication
Business Communication
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
GoFormz A RISK BASED INSPECTION APPROACH A NEW INSPECTION PROCESS
Safe Routes to School John Schaefer State Coordinator.
Presentation transcript:

Chief Operating Officer Greg Johnson

7 Million Sheets of Paper

Manage projects with electronic devices Instantaneous business process flow Data starts and ends electronically No more lost paperwork Electronic signatures Increases communication Quicker approvals

Real-time access to experts & partners Timely payment for completed work Inspectors able to spend more time on job site Increases inspector efficiency & faster problem solving Great documentation training tool

Leveraged an existing software infrastructure Upgraded inspectors from flip phones to smart phones and iPads Resulted in: Immediate productivity gains Surpassed the initial start-up costs Increased employee & stakeholder engagement Enthusiasm drove the process Users presented ideas to make process even better

MDOT’s Goal: All trunkline contracts to use e-Construction documentation by the 2015 construction season All lettings started October 1, 2014

Reduces costs Immediate document distribution No time or money wasted printing & mailing documents Faster approval Faster, more accurate payments to contractors Transparency: Documents available for viewing Accountable: Submittal/approval dates readily available to all Portable: Available from any device, any time, any where Documents are secure & backed up Responds to the reality of having less staff Paper reduction supports “green” environment

The following stakeholders are in production, including: All MDOT construction & materials offices 119 contracting firms 322 contractor users 31 consultant firms 156 consultant users 22 FHWA users 31 active contracts $354 million as-let contracts 9

3D Models Machine Guidance/ Machine Control On-site inspection Field electronic plan view & as- built markup Referencing common plan & proposal information (Boilerplate) Radio Frequency Identification (RFID) of item materials Enterprise Asset Management System

$148,427,744 contract (16% under Engineer’s Estimate) Dan’s Excavating, Inc. AJAX Paving C.A. Hull Company (Bridges) 7 miles, 8-lane reconstruction 37 bridges $150,000/day opening to traffic incentive/disincentive

E-Project LCP Tracker & B2GNow Stringless Paving & Automated Grade Control A+B Modified Best Value Contracting Partnering Dynamic Traffic Assignment Model Social Media Queue Detection Warning System

Contractor bid 165 days 23 days in legitimate “Extensions of Time”, so 188 days allowed Opened in 167 days (morning of September 22 nd ) Contractor earned 21 days incentive, or, $3,150, Contractors/Truckers Worked on the job 400 Workers on the job daily 1250 total individuals worked at some point during the project

How this approach helped C.A. Hull Efficiencies realized Cash flow Technology needed Time of return for technology investments Issues with the design files Disputes Advice for consideration

15

16

Roller Compacted Concrete Competitive Alternative for Low Volume Paving Applications Stringless Paving (3D Paving) Reduced Construction Staking Costs Improves Safety Improves Speed of Paving Improved Supplementary and Blended Cements for Environmental Sustainability Enhanced Concrete Durability Reduced Carbon Footprint 17

Regressing Air Voids In Production Design to 4%, Regress to 3% In Production Results in More Asphalt Cement in Mix Increased Density, Increased Performance Fine Graded Mixes on Top Course Eliminate Dry, Coarse Mixes Resistant to Cracking Better Performance Incentive for Ride Quality Promotes better Construction Practices/Innovation from Contractors Improved Ride for Traveling Public 18