Final Version Bob G. Beaman May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Electrical Power System (EPS)

Slides:



Advertisements
Similar presentations
Yuwawanit , surussawadee peralta , fatima
Advertisements

Larry Phillips MAY 13th-17th, 2002 Micro Arcsecond Xray Imaging Mission: Pathfinder (MAXIM-PF) Launch Vehicle Information Final Version.
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
1 Winter Launch Block Modeling and Results MMS Flight Dynamics Team MIWG 8 Feb. 20, 2014.
07/07/2005 Coupling with PF2012: No existing PF “as is” able to accommodate Karin On going study in France to develop a new generation of PF product line.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Frank Stocklin Ron Vento Leslie Ambrose June 28,2001 SUPERNOVA/ACCELERATION PROBE (SNAP) Data Systems.
By Matthew Patterson. L ow E arth O rbit N anosatellite I ntegrated D istributed A lert S ystem.
Introduction to Space Systems and Spacecraft Design Space Systems Design Power Systems Design -I.
MAXIM Power Subsystem Diane Yun Vickie Moran NASA/GSFC Code (IMDC) 8/19/99.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
1 Electrical Power System By Aziatun Burhan. 2 Overview Design goal requirements throughout mission operation: Energy source generates enough electrical.
Eclipses and Tides 6.E.1.1 Explain how the relative motion and relative position of the sun, Earth and moon affect the seasons,
Marco Concha Charles Petruzzo June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Flight Dynamics.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / /
Bob G. Beaman June 28, 2001 Electrical Power System SuperNova / Acceleration Probe (SNAP)
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
USAFA Department of Astronautics I n t e g r i t y - S e r v i c e - E x c e l l e n c e Astro 331 Electrical Power Subsystem—Intro Lesson 19 Spring 2005.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Final Version Micro-Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Eric Stoneking Paul Mason May 17, 2002 ACS.
Final Version John Martin May 13-17, 2002 Opening Comments Micro Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF)
© Lavochkin Association, 2013 Ganymede Lander mission overview.
Galactic Bulge Time On Target May These charts examine the compatibility of a 500 day microlensing program with a 6 month SNe observing program.
Van Allen Probes Spacecraft Operations July 29, 2015 Kristin Fretz
ASTEP Life in the AtacamaCarnegie Mellon Limits of Life in the Atacama: Investigation of Life in the Atacama Desert of Chile Power System Design James.
Morehead State University Morehead, KY Prof. Bob Twiggs Power Systems Design
Chapter 1 Earth, Moon, and Sun Section 3 Phases, Eclipses, and Tides.
The Earth’s Moon. Motions of Earth’s Moon Revolution of the moon around Earth affects: phases of the moon, tides and eclipses Revolution of the moon around.
Eclipses 5/19/ c pgs IN: Which two planets do not have moons? Why not?
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
AAE450 Senior Spacecraft Design Project Aquarius Mike Kowalkowski Week 2: January 25 th, 2007 Project Aquarius Power Engineering Habitat, Battery, and.
DINO PDR 23 October 2015 DINO Systems Team Jeff Parker Anthony Lowrey.
Electrical energy. Summary questions a)Electrical energy is energy transfer by an electric ______________. b)Uses of electrical devices include: heating.
Final Version Steven Cooley Rich Luquette Greg Marr Scott Starin Flight Dynamics May 13-17, 2002 Micro-Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF)
Student Satellite Project Power Generation and Distribution 1 Power Generation and Distribution WINTER ’99 REVIEW Chieh-Kuen Woo Team Leader.
Final Version Gabe Karpati May 17, 2002 Micro-Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF) System Overview.
FAST LOW THRUST TRAJECTORIES FOR THE EXPLORATION OF THE SOLAR SYSTEM
Low Thrust Transfer to Sun-Earth L 1 and L 2 Points with a Constraint on the Thrust Direction LIBRATION POINT ORBITS AND APPLICATIONS Parador d'Aiguablava,
Final Version Dick Bolt Code 302 May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Success.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
Mission Operations –Launch February 15, 2000 at 22:02:15 UTC = 14:02:15 PST –41 Days IOC and antenna deployment period –2 year science mission operations.
Lunar Cycle Goal: Identify the phases of the Moon, and relate the phases to eclipses.
THEMIS FDMO Review Propellant Budget Update − 1 October 5, 2004 PROPELLANT BUDGET UPDATE Vassilis Angelopoulos Covered in this presentation: Allocations.
Competition Sensitive Gabe Karpati June 28, 2001 SuperNova / Acceleration Probe (SNAP) System Overview.
Final Version Kequan Luu May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Flight Software.
USAFA Department of Astronautics I n t e g r i t y - S e r v i c e - E x c e l l e n c e Astro 331 EPS—Design Lesson 20 Spring 2005.
Final Version Gary Davis Robert Estes Scott Glubke Propulsion May 13-17, 2002 Micro Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF)
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
Spacecraft Systems Henry Heetderks Space Sciences Laboratory, UCB.
Orbital Analysis for Inter-Calibration Dave Mac Donnell Brooke Anderson Bruce Wielicki Don Garber NASA Langley Research Center Solar Workshop January 30,
Characteristics of remote sensing satellites. Satellites generally vary in their architecture Usually remote sensing satellites are having two plateforms.
EXTP Accomodation Study Hong Bin, Zhang Long Institute of Spacecraft System Engineering. CAST Oct 27th, 2015.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.
Spacecraft Power Systems
Maxim Pathfinder Prework 16 August 1999
Technical Resource Allocations
Integrated Thermal Analysis of the Iodine Satellite (iSAT) from Preliminary to Critical Design Review October 20th 2016 Stephanie Mauro NASA Marshall Space.
Lunar Cycle Goal: Identify the phases of the Moon, and
Scientific Mission Applications
Lunar Cycle Goal: Identify the phases of the Moon, and
Micro-Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF)
Lunar Cycle Goal: Identify the phases of the Moon, and
EagleSat 2 – Electrical Power Subsystem Development
THERMAL CONTROL SYSTEM
Lunar Cycle Goal: Identify the phases of the Moon, and
Presentation transcript:

Final Version Bob G. Beaman May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Electrical Power System (EPS)

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 2 EPS Summary  The Phase I Hubcraft is undeployed Single Hub spacecraft attached to the Six FreeFlyer spacecraft.  The EPS for the Hubcraft is a distributed EPS with 10 ah LiIon batteries in each Spacecraft. Three sun side FreeFlyer spacecraft solar arrays are enough power to provide the Hubcraft power requirement.  Batteries are provided for Launch loads and contingency.  Technology areas that should be available by 2015 are: Distributed EPS, 35% eff Quad Junction solar cells, EPS Autonomy and use of Structural Batteries.  Solar Array Temp was assumed at 105 deg C.  MAXIM Pathfinder to full MAXIM.  Solar array size increase by 1.4% from 5 to 7 years additional life.  Unused EPS margin may provide this.  With no S/A increase full operational requirements can accomplished except for 53 days during the 6 th year and 71 days during the 7 th year.  Use of 35% efficient solar cells would provide this and reduce solar array area.  Beginning Of Life (BOL) Solar Array power can accommodate up to 41.5 deg off pointing for the first year with decreasing angles as the solar array degrades.

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 3 EPS Conclusions  There are no Big EPS show stoppers.  Dual Cosine angles are used. First +/- 30 degrees comes from an instrument requirement. And +/- 15 degrees is needed the Phase II operation to avoided one FreeFlyer from shadowing the other when they are in the same plane with the sun.  The Phase I mission Hubcraft requires 3.72 M2 from 3 FreeFlyer Spacecrafts. Each FreeFlyer Spacecraft requires 1.25 M2 for the Phase II mission which is just slightly larger. The design goal was to keep the Phase I Hubcraft solar array size to be equal for less that the 3 FreeFlyer Phase II size.  Further analysis or additional development may increase the Phase I Hubcraft solar array size. If that happens, the sun lead FreeFlyer will need additional solar panels each adjacent side. Higher efficient (35%) solar cells can be used.

Final Version EPS Detail Charts Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 5 Electrical Power System Driving Requirements & Assumptions  Launch:21 July 2015  Orbit:L2. No eclipses  Life:2 year Phase I 3 year Phase II  Battery:For Launch and contingency  Solar Array:Needed to provide Power for loads. Solar Array temp 105 deg C.

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 6 Electrical Power System Options Considered  Deployed Solar Array. A body mounted Solar Array size was achievable so solar array deployments were eliminated.  Phase I “sun lead” FreeFlyer adjacent side solar panels were not needed. The Phase II FreeFlyer solar Array size was large enough to be used as one third of the Phase I Hubcraft solar array.  Baseline a distributed EPS for the Phase I Hubcraft. The distributed EPS needs to be broken up for Phase II mission phase for individual FreeFlyer spacecraft and Hub spacecraft operation.

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 7 Electrical Power System Selected Configuration & Rationale  Use of 28% Tj GaAs solar cells. Provides enough power and will be a mainstay for 2015 launch. By % QjGaAs cells may be available.  Use of LiIon battery. For launch loads and contingency in L2.  MAP type PSE, however must be modified to provide Distributed EPS functions. A Voltage regulated bus is recommended over a Battery Dominated Bus.

Final Version Detector Spacecraft Phase I & II EPS Baseline Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 9 Detector Spacecraft Load Analysis

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 10 Detector Spacecraft EPS Curve

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 11 Detector Spacecraft Summary

Final Version HubCraft Phase I EPS Baseline Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 13 Hubcraft Load Analysis

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 14 Hubcraft EPS Curve

Final Version Hub Spacecraft Phase II EPS Baseline Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 16 Hub Spacecraft Load Analysis

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 17 Hub Spacecraft EPS Curve

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 18 Hub Spacecraft Summary

Final Version FreeFlyer Spacecraft Phase II EPS Baseline Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 20 FreeFlyer Spacecraft Load Analysis

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 21 FreeFlyer Spacecraft EPS Curve

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 22 FreeFlyer Spacecraft Summary

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 23 EPS Technology Required  A distributed EPS system must be developed. Recommend the use of a voltage regulated system with distributed batteries and solar arrays.  By 2015 Quad junction gallium arsine (QjGaAs) solar cells at 35% efficiency would be available and can reduce mass but may increase cost and have life concerns.  Use of a Structural Battery would decrease mass. This technology should be available by 2015.

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 24 EPS Requirements Verification.  Standard verification for PSE and Solar Array.  A life test should be done on the battery design to ensure it will meet the cycle life requirement with normal eclipse seasons.

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 25 Electrical Power System Additional Trades to Consider  Scrub the load analysis to reduce the solar array size and battery ampere- hour requirement.  Trade Battery Dominated Bus (BDB) vs Voltage Regulated Bus (VRB) for a distributed bus design.  Peaking analysis,  This EPS design has limited extra solar array due to full sun orbit and no battery recharge requirements.  Battery Life Test characteristics.  Cable harness inductive characteristics that will choke the peak current.  Use of a ultra capacitor near the peaking load device so harnessed do not see peak currents.  Look at propulsion orbit adjust maneuver and the power that is available.

Final Version MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Electrical Power System Page 26 Electrical Power System Issues and Concerns  None