MULTIPLE INDICATOR MONITORING (MIM) PROTOCOLS. 8. Greenline-to-Greenline 9. substrate – in the x section, and 10. residual depth 1.Stubble ht, 2. bank.

Slides:



Advertisements
Similar presentations
MIM and Adaptive Management. PURPOSE of ADAPTIVE MANAGEMENT: To achieve long- term desired conditions Emphasis should be placed on long-term monitoring.
Advertisements

Grazing Management for Healthy Riparian Areas Authors: Gene Surber, MSU Extension Natural Resources Specialist Bob Ehrhart, Research Specialist, RWRP,
Culvert Inventory and Assessment Protocol 2015 Field Season.
Estimation of vegetation foliage cover (no boles or woody stems) by layer and aerial canopy cover of each growth habit Phase 2 Vegetation Profile Summary.
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
Riparian Zone Habitat Assessment Vegetation and More.
Log Rules. Tree versus Log Volumes Trees contain sections that resemble different geometric solids. Trying to fit one rule to approximate the entire tree.
Mark DMAs & Collect Data  Identify Plants on the DMA  Take photos  Determine sample interval (2.75 m = 40 plots each side for a 110 m DMA)  Use random.
Locating the GreenlineLocating the Greenline  Define the greenline  Sampling using a monitoring frame  Greenline rules  Examples.
Ghost River Watershed Riparian Health Inventory 2011 Highlights March 10, 2012 Benchlands, AB.
Vegetation Soil, Landscape Hydrology Process for Assessing Proper Functioning Condition Vegetation Items.
Comparison of Basal and Aerial Cover for Total Vegetation Cover and Total Ground Cover on Oil & Gas Well Sites in Southwest Wyoming 2013 Joint Conference.
Wildlife Management Principles. Goals What are some goals related to the management of wildlife habitats?
River Studies. Outline of Events During your river field work you will be visiting two different sites in the lower course of the river. At each site.
Natural Riparian Resources Vegetation Landscape/Soil Water.
Road Decommissioning Monitoring For every 10 miles of road decommissioned, one ¼ mile monitoring segment is established and monitored. Segments are monitored.
FIELD METHODS Strategy for Monitoring Post-fire Rehabilitation Treatments Troy Wirth and David Pyke USGS – Biological Resources Division Forest and Rangeland.
Relating Post-Treatment Vegetation Responses to Habitat Requirements of Gunnison Sage-grouse Dr. Joe Brummer Colorado State University Department of Soil.
Examples for Mitigation Category 1 and 2 Streams.
Habitat Assessment Developed by Ken Cooke Kentucky Division of Water Watershed Watch Program Coordinator Modified by Mike Kemp Professor of Environmental.
Duncan Lutes Systems for Environmental Management Bob Keane – USFS – Research Ecologist, P.I. Carl Key – USGS – Geographer John Caratti – SEM – Systems.
Bioassessment 1.0. Stream Visual Assessment Protocol 1. Turbidity 2. Plant growth 3. Channel Condition 4. Channel Flow Alteration 5. Percent Embeddedness.
o What were we looking at? o The Pit Crew studied soil patterns throughout the landscape.
Watersheds Capture, Store And Safely Release Water.
Vegetation Transects San Pedro Creek Study.
A portable 6-inch diesel-powered trash pump was used to pump water from Little Topashaw Creek for gully erosion tests February 4 and 5, 2002.
By Catherine Fontenot LTEC /29/ Preparations for your tree Preparations for your tree The tools you will need for the job The tools you.
Greeline to Greenline Width (GGW) Non vegetated Channel width.
What’s a “Basin”? A depression that holds water A bird bath What holds the water of Lake Michigan What contains the water of an ephemeral pond Does it.
Introduction Larger streams and rivers in the Piedmont, Southwestern Appalachians, Ridge and Valley, and parts of the coastal plain ecoregions of Alabama.
Restoration of Compartment 46 to promote oak-hickory regeneration, shortleaf pine and native grasses in Sewanee, TN Johnson Jeffers and colleagues in FORS.
STUDY OF THE ROUGHNESS CHARACTERISTICS OF PLANT SPECIES IN CALIFORNIA RIVERS By U.C.Davis J.Amorocho Hydraulics Laboratory.
Habitat Presentation 1 Phil Kaufmann --- USEPA, Corvallis, OR
Step 1: Assess Riparian Resource Function Using PFC §1d. Complete PFC assessment l 17 questions about attributes and processes l Reminder – PFC based on:
Natural Riparian Resources Water Landscape & SoilVegetation.
Basinwide Visual Estimation Technique BVET
VEGETATION ANALYSIS.
STRATIFICATION PLOT PLACEMENT CONTROLS Strategy for Monitoring Post-fire Rehabilitation Treatments Troy Wirth and David Pyke USGS – Biological Resources.
Pennsylvania Regeneration and Invasives Research William H. McWilliams Northeastern FIA User’s Workshop April 13, 2004 – Sturbridge, MA Justification Study.
Multiple Indicator Monitoring (MIM) Monitoring the Effects of Management on Stream Channels and Streamside Vegetation.
PCB 3043L - General Ecology Data Analysis. OUTLINE Organizing an ecological study Basic sampling terminology Statistical analysis of data –Why use statistics?
Long-term vegetation monitoring, an update. Pierre Hiernaux, Eric Mougin, Josiane Seghieri, François Lavenu, Nogmana Soumaguel, Lassine Diarra.
Large Woody Debris in Valley Creek By: Conan McCarty.
 Comparing Vegetation in a Riparian Zone to an Upland Area in a Colorado Montane Forest By: Abby Branson Vegetation Ecology, Summer 2013 Mountain Research.
Sharon Stanton & FIA National Indicator Leads RECOMMENDATIONS FOR ENHANCED FOREST INDICATORS.
How Plants Grow & Respond to Disturbance. Succession & Disturbance  Community change is driven by successional forces: Immigration and establishment.
SUMMARY. Summary Instructions After the checklist is filled out and rationale documented, the ID Team discusses the responses, reads the category definitions.

PCB 3043L - General Ecology Data Analysis.
Using Multiple Indicator Monitoring Protocols. What is MIM Streambank Alteration?  The number of lines on the plot that intercept hoof prints, hoof shears.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
The Effect of Fuel Treatments on the Invasion of Nonnative Plants Kyle E. Merriam 1, Jon E. Keeley 1, and Jan L. Beyers 2. [1] USGS Western Ecological.
Natural Riparian Resources Water Landscape & SoilVegetation.
Unit 3 Investigative Biology. SQA Success Criteria  Explain the difference between random sampling, systematic sampling and stratified sampling.
S-244 Field Observer & Fire Effects Monitor Fire Effects Monitoring Lesson 2: Methods for Measuring Fire Effects Photo: Marshel Moy.
Monitoring Riparian Grazing Use. Why Do We Monitor?  To provide accountability for our actions.  To provide feed back on results.  To aid in our decision.
Natural Riparian Resources Vegetation Landscape/Soil Water.
PCB 3043L - General Ecology Data Analysis.
Brian murphy and Emily valenzuela
Using Quantification and Communication Skills
Additional Data Collection in 2017
Module 10/11 Stream Surveys
Sampling Strategies and Quadrats
Internal Assessment IB Geography
Iowa’s River Restoration Toolbox Level 1 / Base Training
Module # 17 Overview of Geomorphic Channel Design Practice
Sampling Strategies and Quadrats
Longitudinal Profile Survey for Successful Culvert Replacement
What are we going to do at the field trip?
Stream Crossing Bootcamp
Presentation transcript:

MULTIPLE INDICATOR MONITORING (MIM) PROTOCOLS

8. Greenline-to-Greenline 9. substrate – in the x section, and 10. residual depth 1.Stubble ht, 2. bank alteration, 3. woody browse, 4. greenline veg, 5. woody species height, 6. bank stability, and 7. woody regeneration – on the greenline

Setting Up the DMA u For a representative or critical DMA to be useful, livestock must have access to the stream. u The DMA should be randomly located within the selected complex. u After the DMA is selected, a permanently marked reach is established.

Reach Length u The reach extends at least 110 meters (361 feet) along the stream. –Longer reaches may be needed on larger streams (over 5.5 meters or 18 feet of greenline-to-greenline, or bankfull width). For such streams, the reach should be approximately 20 times the greenline-to-greenline (GGW) width, or two meander wavelengths (approximately 20 times the bankfull width - Gordon et al. 2004), if the bankfull width indicators are present. »A stream reach with an average GGW or bankfull width of 8.3 meters would be 8.3 X 20, or 166 meters in length.

Reach Markers  Permanently mark the lower and upper ends of the reach with reach markers.  Place the lower marker on the left-hand side (looking upstream) and the upper marker 110 meters upstream (further if a longer reach is used).  The marker should be located at least 2 meters away from the top of the bank.  Reach markers should be made of securely capped or bent over larger-diameter rebar or similar material.

REFERENCE MARKER Used as a reference point to help relocate the DMA. Should be located well away from the Transect (at least 100 feet if a post that attracts livestock is used). Use steel posts, a marked post in a fence line, a marked tree or unique rock, or other natural feature, or GPS location (UTM or latitude-longitude) for both the reference marker, and the reach markers. Sketch the monitoring setup

PLANT LIST Develop a plant list and record species codes for the site. The Data Entry Module contains a complete list of plant species codes and a worksheet for recording plant codes applicable to the DMA. Also refer to the plants table in Appendix H for appropriate plant species codes.

Clark Draw near Bondurant, WY

Final Thoughts on Pre-work/ stratification and DMA Selection u Don’t rush into Monitoring w/MIM! u Spend an appropriate amount of time and effort on determining existing and potential conditions, stratification, objective setting, and DMA selection u Document your DMA selection rationale u The “Ready, Fire, Aim” sequence does not work

Systematic Procedures 1. Photos (4 photos minimum) 2. Locate Coordinates using GPS coordinates, upper and lower markers and reference markers 3. Select only those monitoring indicators that are needed to answer monitoring questions (you do not have to collect all 10 metrics at each DMA!)

Systematic Procedures 4. Monitoring Frame  2 side-by-side Daubenmire quadrats  Subdivided into 4 equal parts (5 Lines)  Handle used to measure stubble height 20 cm 50 cm cm 1 inch or 2 cm

Systematic Procedure 5. Sample Interval a.Typical DMA is 110 meters (361 feet) b.Usually at least 80 samples (40 each side) c.Interval 2.75 meters (9 feet) d.Shorter interval 2 meters provide 55 samples each side 6.Measuring the Sample Interval a.A typical measuring rod in 2 meters and may be used to measure the interval b.Interval may be stepped. Determine the length of your step, must be consistent. Average Step length To obtain at least 40 Plots per 110 meter (361 feet)Transect Steps betwe en plots Spacing between plots FeetMeters 15 inch inch inch inch inch inch

Systematic Procedure 7. First Sample a.Determine a random number between 1 and 10 b.Step that number of steps up stream and place frame on left hand side (up stream) c.Center bar on greenline Stream Flow

Systematic Procedure Located by pacing ▲ ▲ 8.Monitoring the DMA a.Sample entire length of DMA, Both sides b.When the end is reached, measure the distance from last plot to marker, cross to the other side measure the remaining part of the plot interval, measure the remaining distance, place the frame and continue downstream to the lower marker

Systematic Procedure 9. Sample Size a.After completing 80 + samples with an inadequate number of samples b.Determine from the sample size predictor the number needed c.Divide the DMA length by the number of samples needed, begin measuring the determined interval from lower marker d.Place the frame and obtain data e.Measure the interval to the next sample location place the frame on the opposite bank f.Alternate from side-to-side for the length of the DMA

Field form Header

1. Greenline Vegetation Composition 1. Develop a species list –Plant codes, species, groupings, etc. 2. Record herbaceous vascular plants (perennial) –Amount of foliar cover –Exclude bare ground, litter, duff 3. Record woody species understory –Cover of seedlings not considered overstory

4. Record woody species overstory –Use height class table to record height –Rooted in or overhanging plot 5. Record embedded rock and anchored wood –Rock > 15cm or anchored wood is recorded 6. Record grouped plants –Group plants with less than 10 percent foliar cover (mesic forbs early MFE, mesic graminoids MG) 1. Greenline Vegetation Composition

Woody Species Overstory u Woody Species Overstory –Record all woody plant species rooted in or overhanging the quadrat. –If any part of the plant occurs over the quadrat it is counted. –Foliar cover is not used »2 species = 50% per species »3 species = 33% per species u Total plant composition (understory + overstory) less than or = 200%

2. Wood Species Height u Determine the tallest part of each woody species that has cover OVER the quadrat. Height ClassPlant Height 10 – 0.5 m – 1.0 m – 2.0 m – 4.0 m – 8.0 m 6> 8 m

3. Streambank Alteration u What is MIM Streambank Alteration? o The number of lines on the plot that intercept hoof prints, hoof shears – disturbances caused by trampling. o 5 lines per frame – one sample o At least 80 samples per site – total of 400+ lines o % Streambank Alteration = the proportion of the 400+ lines that intercept hoof prints/shears

MIM Bank Alteration 80+ plots -400 Samples

Bank Shear and Tramples

Proper Use of Bank Alteration u As a short-term indicator of disturbance effects on bank stability and vegetation u Any value assigned as a trigger to move livestock or as a measure of grazing use is a “guideline” which must be able to change through time (See Cowley 2002) u Thus a “Term and Condition” should incorporate an adaptive process.

Bank Alteration and Bank Stability As bank alteration goes down, then bank stability goes up.

Amount of Alteration that streambanks can repair annually depends upon:  Stream gradient  Streambed material composition,  Streambank soil composition,  Vegetation cover and type  Channel geometry,  Flow rate and timing, and  “... concentrated impacts under rotation systems can cause sufficient woody plant or streambank damage in a single season or year that recovery might take several years. Therefore, the best approach is to limit grazing stress to the site’s capability for annual recovery.” (Clary and Kruse 2004)

McHaley Creek Bank alteration: 28% Stubble height: 4.2” Bank Stability 100% Dominant greenline vegetation: CANE Nick Stiner, Malheur NF

EF Deer Creek Dominant Vegetation POPR– 65% MFE – 22% JUBA – 12% SCMI – 3% % Hydric – 19% October 2009 Bank alteration:1% Bank stability: 70% Nick Stiner, Malheur NF – Fall 2009 June 2009 Sept Bank alteration: 24% Bank stability: 51% June 2009 Bank alteration: 4% Bank stability: 67%

LOWER LONG TOM CREEK Bank Alteration = 77% Bank Stability = 2% % Hydric Herbaceous = 10%

A Rational Approach to Bank Alteration Criteria and Standards 1. Existing Condition: Compare existing condition to a reference (best method) –Bank Stability (%): –Bank Cover (%): –Hydric herbaceous vegetation (%) a)(closer these are to reference the higher the allowable level of bank alteration)  Channel Type: > gradient = higher allowable level > particle sizes = higher allowable level

The Confidence Interval  Any criteria requires consideration of the precision of the measurement.  CI for Streambank Alteration 32 tests ○ Maximum – 11% ○ Minimum -.5% ○ Average – 6%  Using the CI: Set trigger at allowable level minus 6% Set standard at allowable level plus 6% e.g. If allowable level is 20%, trigger might be set at 14%, and term and condition set at 26%.

4. Streambank Stability u Stream scour line up to the edge of the floodplain. –What kind of bank is it? »Erosional or Depositional –Is the bank covered? »Covered or Uncovered –Is it stable? FractureSlump SloughEroding Absent Block detached from streambank Fracture

5. Stubble Height u Determine “key” species ahead of time. u Measure key species nearest the quadrat handle. u Using handle, record average leaf length to nearest inch (centimeter). u If key species does not occur, then leave cell blank.

6. Woody Species Age Class 0.42 meter (1 frame width) GREENLINE

6. Woody Species 1. Determine frame placement 2. Distinguish individual plants 3. Determine age class 4. Record woody root sprouting and rhizomatous species 5. Record low growing shrubs

7. Greenline-Greenline Width

8. Substrate Composition u Beginning with the 2 nd plot, collected every other GGW transect (20 times) u Measure median diameter of 10 particles at each transect (200 particles total) u May use gravelometer or ruler

9. Woody Species Browse u 2 meters (1 meter either side of greenline) x length between sample points (2.75 meters) –Evaluate first available woody plant (A). Repeated for each key woody species (B and C). –May want to use a 2 meter “stick” to be centered on greenline.

10. Residual Stream Depth u Begin at downstream marker and move upstream u Record depth at riffle crest u Record depth at pool bottom u Record tape distance