LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.

Slides:



Advertisements
Similar presentations
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Advertisements

EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
201 MHz NC RF Cavity R&D for Muon Cooling Channels
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Summary of Accelerator Systems Collimation Parallel Session 19 October 2007 LARP CM#9 - SLAC Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator.
LHC Phase II Collimator teleconference - 4 March 2008LHC Rotatable Phase II Collimators 1 beam LARP Phase II collimator Progress and Plans 4 March 2008.
1 LARP Phase II Secondary Rotatable Collimator Evolution of design changes 3 rd March, 2010.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
SLAC R&D Mtg November 2007LHC Rotatable Phase II CollimatorsSlide # / 17 beam LARP Rotatable Collimators for LHC Phase II Collimation 12 November.
LARP LHC PHASE II COLL RC1 - S. Lundgren 1 April 2009 No 1 /6n LARP Phase II Secondary Collimator RC-1 Mechanical Design Review 01/04/09.
1.3GHz Input Coupler for ILC
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Beam Rotatable Collimators as a Possible US Contribution to the LHC Luminosity Upgrade Project 24 April 2008 LARP CM#10 Tom Markiewicz/SLAC BNL - FNAL-
Beam Rotatable Collimators as a Possible US Contribution to the LHC Luminosity Upgrade Project 20 June 2008 LARP DOE Review Tom Markiewicz/SLAC BNL - FNAL-
Task List for Phase II Rotatable Collimator Project at SLAC 30 January 2007 CERN/LARP Video Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Collimation Overview 28 October 2008 LARP CM11, Fermilab Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program 1)Short Status.
LARP LHC PHASE II SECONDARY COLLIMATOR CD1 REVIEW. - E. Doyle 15 Dec /25 LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 Prototype Engineering.
LARP Rotatable Collimators for LHC Phase II Collimation 09 July 2007 SLAC R&D Status Meeting Gene Anzalone, Eric Doyle, Lew Keller, Steve Lundgren, & Tom.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
Ti/SS transitions A.Basti INFN-PISA*
Status of material tests
LARP Phase II Secondary Collimator RC1
Manufacturing of the first FCC-hh beam screen prototype for ANKA
Complementary ISTC Projects #3888, 3889p
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
Challenges of vacuum chambers with adjustable gap for SC undulators
Dump Core Studied Design Solutions
LARP Phase II Secondary Collimator RC-1
SLAC RC Status Report US LHC Accelerator Research Program
23 April 2012 Tom Markiewicz/SLAC
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
LCLS Vacuum System Plans (July 07)
Presentation transcript:

LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m  & align well Discovered after tank welded that the cooling tube of each of the two jaws had been damaged First jaw, the thermal performance prototype, was wound with non-OFE Cu magnet conductor, 3/8” square with ¼” round cooling channel Second jaw was wound with 10mm square, 1.5mm wall OFE Cu tubing BPM Rotation Drives

Crack in Copper Magnet Conductor Used for Winding First Prototype Jaw LARP CM Nov 2011Accelerator Systems - T. Markiewicz Suspect weakening in non-OFE Cu tubing at crystal grain boundaries after last of many high temperature firings Repaired with solder patch Slide n° 2 / 22

Leaks at Tack Welds and Perhaps at Thinned Points in Thinner Walled Tubing Used for Winding 2nd Prototype Jaw Tube walls thinned to 0.030” in places when mandrel prepped for jaw braze Repaired with “CuSil” [possibility this leak introduced during diagnostic cutting] “SNOOP” bubbles at tack welds used to secure tubing: 5 leak points Neither of these procedures are fundamental New assembly process developed to avoid these two procedures

Other Lessons Learned During Prototype Testing After 5 weeks of bakeout (with the leaking cooling tubes sealed) tank & jaws (& inside surface of tubes pumped through their leaks) reach P=4.4E-9 torr with clean RGA Rotation mechanism tested after bakeout and works Other “Less important” lessons learned that will be improved in the next prototype Replace problematic free floating RF bearings with race-constrained bearing Capture main bearing so cannot slide off during bakeout Replace W-S2 440 Stainless coated main bearing with ceramic bearing 1 of 4 main bearings froze to race during bakeout (W-S2 316 SS bearings all fine) Replace 1 of 2 molybdenum rotation drives that cracked when spot welded Non-fundamental issues that will not be changed Impedance dominated by tank size & simplified 1-dimensional RF transitions We will not develop BPMs that move with jaws will not be implemented

New Plan Replace both jaws & reinsert into existing base plate with existing vacuum bellows and motion system We have major parts in-house for 2 complete new jaws Need to Modify jaw assembly procedure to guarantee cooling tube integrity Improve the so-called “less-important” lessons learned Reassemble with rotation drives & test Re-weld vacuum tank, bake & vacuum test Need to deliver to CERN as soon as possible DOE has demanded project be finished as soon as possible Activity supported by SLAC and carry-forward funds (no new DOE $) Beam and destructive HiRadMat testing schedule will be determined once RC actually arrives at CERN

New Assembly and Braze Procedure to Guarantee Integrity of Cooling Coil Proposed Procedure: – Wrap a 1mm thick OFE copper sheet around the mandrel with its wound cooling tube Braze material between sheet and OD of mandrel – Braze in 316 SS Compression Fixture to lock down tubes without spot welds – Tubes not touched during machining to true mandrel OD for jaw braze

Test Procedure with 20cm Prototype

Lessons Learned from this Prototype Keystoning an issue – Understand size of the effect & make sure grooves in mandrel match Sheets of braze material by themselves inadequate – Braze wire should be put on each edge of cooling coil spiral (as was done for 2 previous prototypes) PLUS sheet braze material to bond 1mm sheet to tops of mandrel AND cooling coil 1mm thick sheet adequate to protect against later machining for jaw braze KLY braze shop advises us to keep 1mm sheet but to abandon the 316SS clamp, returning to the method use to braze the previous mandrels: moly wire Decide that a 2 nd prototype required before risking the two (ready & waiting) cut & grooved full length mandrels

Other Work in Progress 45 bar hydraulic test of 1.5mm wall 10x10 tubing Braze the two new shaft assemblies: