Agile Project Management for Smart m-Learning Annop Piyasinchart Asst. Prof. Dr. Namon Jeerungsuwan.

Slides:



Advertisements
Similar presentations
Program Management School Agile & ADDIE Add-Up (AAAU) Elliott Masies Learning 2012 October 21-24, 2012.
Advertisements

Chapter: 3 Agile Development
Conceptual Framework of Information and Communication Technology to Promote the Proactive Involvement of Global Merit Principle in Cultivating Youths’
Effective Project Management: Traditional, Agile, Extreme
Extreme Programming Team Members Gowri Devi Yalamanchi Sandhya Ravi.
University of Sunderland CSEM04 ROSCO Unit 13 Unit 13: Risk Methods CSEM04: Risk and Opportunities of Systems Change in Organisations Dr Lynne Humphries.
إدارة المشروعات Projects Management
CHAPTER 9: LEARNING OUTCOMES
Project Management Methodology (PMM)
Systems Development (SD) Presentation Michael Webb IT Director for Medicaid Utah Department of Health UDOH Informatics Brownbag August.
Managing a Project Using an Agile Approach and the PMBOK® Guide
Project Management for Public Health Professionals February 2011 David Sabapathy, MD, MBA, PEng Department of Community Health Sciences 3 rd floor TRW.
Setting the success criteria to evaluate project success Tiina Lell
Sharif University of Technology Session # 4.  Contents  Systems Analysis and Design Sharif University of Technology MIS (Management Information System),
SOFTWARE QUALITY ASSURANCE Asst. Prof. Dr. Selim BAYRAKLI Maltepe University Faculty of Engineering SE 410.
An Overview of Agile L e a d i n g C h a n g e T h r o u g h C o l l a b o r a t i o n.
Trusted IT Group. The challenge: 40 active, concurrent IT projects  Unsatisfactory Project Delivery.
Division of Information and Communication Technology for Education, Faculty of Technical Education, King Mongkut's University of Technology North Bangkok,
Project Human Resource Management
FS1. Suriya Pumchalerm. INTRODUCTION PURPOSE OF RESEARCH STUDY RESEARCH METHODLOGY RESEARCH RESULT CONCEPTUAL FRAMEWORK DESIGN SYSTEM DISCUSSION.
AGILE PROJECT MANAGEMENT Cydne Zabel, INFX 543 Winter 2009.
Sense of Initiative and Entrepreneurship This project has been funded with support from the European Commission. This [publication] communication reflects.
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
Muban Chombueng Ratjabhat University King Mongkut's University of Technology North Bangkok Nawin Kongrugsa Assoc. Prof. Dr. Prachaynun Nilsook Asst. Prof.
Chapter 3 – Agile Software Development 1Chapter 3 Agile software development.
Flávio Steffens / Rafael Prikladnicki – Airplance Factory 2009 Airplane Factory Practicing the Agile concepts.
By Saravanan Bala. General Report 31 % of Software projects are cancelled 75 % of the software projects are considered failures by the people who initiated.
Copyright 2010, The World Bank Group. All Rights Reserved. Planning a Statistical Project Section A 1.
Project Management Tomáš Sabol Technical University in Košice
LOGO The Development of Collaborative Project–Based Learning Via Augmented Reality m-Learning for Thai and The Lao People’s Democratic Republic Students.
Module CC3002 Post Implementation Issues Lecture for Week 1 AY 2013 Spring.
Faculty of Information Technology and Communication for Education King Mongkut’s University of Technology North Bangkok, Thailand Design of Intelligent.
Digital Library Operating Management System by North Bangkok University Suphot Phuangkamnerd 1 Prachyanun Nilsook 2 and Ravisada Thamrongviwanna3 1 North.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
King Mongkut’s University of Technology North Bangkok Prachyanun Nilsook Ph.D. Associate Professor “ e-Training for Classroom-based Action Research” Kanphitcha.
The Fifth TCU International e-Learning Conference “Overcome the Uncertainty of Technology in Education” August 5-6, 2014, in Bangkok, Thailand Chantana.
Installation and Maintenance of Health IT Systems
Design of the Virtual Learning Environment with Scaffolding System to support a Brain-based Learning to develop the Creativity of undergraduate student.
ASSESSING CREATIVE THINKING THROUGH PORTFOLIOS October 30, 2014 MAGGIE KONICH ASSESSMENT SPECIALIST.
Quality Management (WP5) Roman CHIRCA Agency for Innovation and Technological Transfer TecTNet ………... This project has been funded with support from the.
Panita Wannapiroon Ph.D. Assistant Professor Division of Information and Communication Technology for Education Faculty of Technical Education King Mongkut's.
Online Multiuser Interactive Learning System on Social Cloud Conceptual Framework Division of Information and Communication Technology for Education Faculty.
Pallob Piriyasurawong Ph.D Assistant Professor Panita Wannapiroon Ph.D Assistant Professor Tanawat Jariyapoom Ph.D. Candidate Division of Information and.
Sorraya Priaoprasit Ph.D. Candidate Ph.D. Program in Information and Communication Technology for Education, Faculty of Technical Education, King Mongkut’s.
Total Quality Management Trend of Education Digital Television Station The Fifth TCU International e-Learning Conference “Overcome the Uncertainty of Technology.
Panita Wannapiroon, Ph.D.
Development of Knowledge Transfer for Support Novice Researchers Pradit Songsangyos Ph.D. Student Divisions of Information and Communication Technology.
Chantana Papattha, Ph.D. Lecturer July 20-21, 2015 at BITEC, in Bangkok, Thailand Rajamangala University of Technology Phra Nakhon & King Mongkut’s University.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Assoc. Prof. Dr. Ahmet Turan ÖZCERİT.  System and Software  System Engineering  Software Engineering  Software Engineering Standards  Software Development.
Quality Circle and 8 D Methodology Dr. Mohamed Riyazh Khan - DoMS.
Project Management Training
What is project management?
Agenda: Overview of Agile testing Difference between Agile and traditional Methodology Agile Development Methodologies Extreme Programming Test Driven.
Chapter 2 Project Management Methodologies. A project life cycle PlanDesignDevelop Integrate (including test) DeployMaintain They can be iterative and.
Common Database on Designated Areas vs. INSPIRE Martin Tuchyňa, Darja Lihteneger INSPIRUJME SE, , Bratislava.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Basic Project Management Process Basic Project Management Process Larry Creel July 11, 2003.
Training Workshop on Business Process Analysis in International Trade Joint Workshop on Trade Facilitation and the Single Window September 2015,
Quantum Leap Project Management
SE503 Advanced Project Management
Information Technology Project Management – Fifth Edition
Project & Program Governance
Is there another way besides accreditation?
How to Successfully Implement an Agile Project
Project Scope Management
Project Lifecycle and IT Product Life Cycle
Lecture 2 Project Management Concepts
System of Profound Knowledge
Project Management Techniques Project Management Life Cycle
Presentation transcript:

Agile Project Management for Smart m-Learning Annop Piyasinchart Asst. Prof. Dr. Namon Jeerungsuwan

Researchers Annop Piyasinchart PhD. Student, Information and Communication Technology Faculty of Technical Education King Mongkut's University of Technology North Bangkok Asst. Prof. Dr. Namon Jeerungsuwan Director, Information and Communication Technology for Education, Faculty of Technical Education King Mongkut's University of Technology North Bangkok,

THEORETICAL FRAMEWORK Deming (PDCA) Management Circle (1970s) eXtreme Project Management Agile Project Management: Creating Innovative Products Project Management: E-learning Complex Adaptive System: CAS Project Management Institute: PMI Agile Project Management Model

Synthesized from the discipline of management study discipline: Deming’s management (PDCA), Complex Adaptive System: CAS, PMI project management

Three new agile project management techniques: 1) “eXtreme Project Management”, 2) “Agile Project Management: Creating Innovative Products”, 3) “Project Management e- Learning”.

RESEARCH OBJECTIVE

RESEARCH ASSUMPTION

Developed an opened-ended / in-depth interviewsDesigned the model: The Proposed Agile Project Management Model. Performed in-depth interviews to ensure the approval of the proposed Agile Project Management model. The Agile Project Management Model Collected and analyzed the interview data/ Ensure the approval of the proposed model

Group 1 Five project management experts who have more than 15 years experience in project management career in the private sector. Group 2 Three experts from the universities who have at least 10 years of experience in managing the m-Learning or/ e-Learning projects or/ other related technology involved projects management.

Agile Project Management Model Concept & Product Definition Session Initial Cycle Planning Development Cycles & Interim Delivery Sessions Products Acceptance & Product Rollout Project Retrospect Project Continuous Improvement What are the problems which project try to solve, improve and develop? What are the benefit to our customer for the project outcomes? Who is the main project responsibility? Do we need the initial cycle planning module to deliver at least 2 rounds continuous improvement for our client satisfaction? Is self control within project team lead by project leader instead of strongly control by project controller better than strong control from out side? Could the project outcome in each iteration cycle could be change according to the client needed? Do delivery the final iteration round is not the ended of the project, isn’t it? When will be the final step for ending the project? Do we need to review for each passed iterative cycle for collection and documentation collection and review for an effective product usage? How can we develop a knowledge management from all the lesson-learnt both success and failure stories that happened during the project development in next project for continuous improvement ? Plan Do Check Act Figure 2: Agile Project Management Model

Deming Main Category In-depth Questions Group 1 5 experts Grou p 2 3 exper ts P (Plan) Concept & Product definition Session What are the problems which project try to solve, improve and develop? What are the benefit to our customer for the project outcomes? Who is the main project responsibility? Initial cycle planning Do we need the initial cycle planning module to deliver at least 2 rounds continuous improvement for our client satisfaction?  D (Do) Development cycles and interim delivery sessions: Is self control within project team lead by project leader instead of strongly control by project controller better than strong control from out side? Could the project outcome in each iteration cycle could be change according to the client needed?  C (Check) Product acceptance, product rollout Do delivery the final iteration round is not the ended of the project, isn’t it? When will be the final step for ending the project?  Project retrospective Do we need to review for each passed iterative cycle for collection and documentation collection and review for an effective product usage? A (Act) Project continuous improvement How can we develop a knowledge management from all the lesson-learnt both success and failure stories that happened during the project development in next project for continuous improvement ?  Agree on the process idea  Think difference from the process idea Figure 3: Summarized in-depth Interview Data (8 experts)

Agile Project management (APM)  SEED of WISDOM APM Development Deming Framework Main Procedure Sub Procedure Original Synthesiz e OriginalSynthesize P (Plan) S (scheme) Concept & Product definition Session W hat are Project Concept & Definition? What are the problems which project try to solve, improve and develop? What are the benefit to our customer for the project outcomes? Who is the main project responsibility? Initial Cycle planning I terative cycle Planning Do we need the initial cycle planning module to deliver at least 2 rounds continuous improvement for our client satisfaction? D (Do) E (execute) Development Cycles and interim delivery sessions S elf Doing Activity by Simple Rule Control through the Iterative Cycle Is self control within project team lead by project leader instead of strongly control by project controller better than strong control from out side? Could the project outcome in each iteration cycle be change according to the client needed? C (Check) E (evaluate) Product Acceptance Product rollout D elivery Final Products for Acceptance & Rollout Project Do delivery the final iteration round is not the ended of the project, isn’t it? When will be the final step for ending the project? Project Retrospective O perate Retrospective Do we need to review for each passed iterative cycle for collection and documentation collection and review for an effective product usage? A (Act) D (develop) Project continuous improvement M anage Guide Line for Continuous Improvement How can we develop a knowledge management from all the lesson- learnt both success and failure stories that happened during the project development in next project for continuous improvement ? Figure 4 SEED of WISDOM Agile Project Management

SEED of WISDOM for Agile Project Management Model What are the problems which project try to solve, improve and develop? What are the benefit to our customer for the project outcomes? Who is the main project responsibility? Do we need the initial cycle planning module to deliver at least 2 rounds continuous improvement for our client satisfaction? Is self control within project team lead by project leader instead of strongly control by project controller better than strong control from out side? Could the project outcome in each iteration cycle could be change according to the client needed? Do we need to review for each passed iterative cycle for collection and documentation collection and review for an effective product usage? How can we develop a knowledge management from all the lesson-learnt both success and failure stories that happened during the project development in next project for continuous improvement ? รูปที่ 5 SEED of WISDOM for Agile Project Management S – scheme (Plan) E – execute (Do) E – evaluate (Check) D – develop (Act) W What are Project Concept & Definition? I Iterative Cycle Planning S Self Doing Activity with Simple Rule Control through the Iterative Cycle D Delivery Final Products for Acceptance & Rollout Project O Operate Retrospective M Manage Guide Line for Continuous Improvement Do delivery the final iteration round is not the ended of the project, isn’t it? When will be the final step for ending the project?

SEED of WISDOM for Agile Project Management Model S – scheme (Plan) E – execute (Do) E – evaluate (Check) D – develop (Act) W What are Project Concept & Definition? I Iterative Cycle Planning S Self Doing Activity with Simple Rule Control through the Iterative Cycle D Delivery Final Products for Acceptance & Rollout Project O Operate Retrospective M Manage Guide Line for Continuous Improvement

Agile Project Management for Smart m-Learning Annop Piyasinchart, Asst.Prof.Dr. Namon Jeerungsuwan, Information and Communication Technology for Education, Faculty of Technical Education King Mongkut's University of Technology North Bangkok 1518 Piboonsongkram Rd., Bangsue, Bangkok 10800, Thailand. Thanks for Attentions