FDOT Estimating Systems Support Manager

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

ODOT Structure Project Manager Seminar Specifications
East Hampton High School July 2013 – July 2014 Design Phases.
EvalS Application User Guide version September 17, 2011.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
1 Canyonero Parkway Cost Estimate Review Close out presentation October 5, 2007.
Cost Estimation System Tool
Statewide Construction Database (SCD) Florida Department of Transportation Production Management Office June 29, 2006.
QI Usage Requests: Part 2 Managing, Approving & Ordering.
Indistar: Updates, Additions, and Coming Soon Stephanie Benedict, ADI.
PRE-QUALIFICATION AND BID ENTRY WEB APPLICATIONS CONTRACTS ADMINISTRATION Presenters: Juanita Moore Leila Griffin September 9, 2003.
Pay Items, BOE and TRNS*PORT Paul Herring FDOT State Estimates Office (850) SC
United Nations Statistics Division Scope and Role of Quarterly National Accounts Training Workshop on the Compilation of Quarterly National Accounts for.
TEAM Training: Program Management Last Update: May 2011.
Measuring and reporting outcomes for your BTOP grant 1Measuring and Reporting Outcomes.
Logging into ITAMS as a Student or Hourly Employee To Login to ITAMS for the first time: Open your web browser. Click File, Open, and type the following.
USC’s Internet-based Time and Attendance Management System.
Copyright © 2001 Bolton Institute Faculty of Technology Multimedia Integration and Applications Lecture 9: Production Management Damien Markey.
Overview of FDOT’s Long Range Estimating System 2005 TEA Conference November 4, 2005 Daytona Beach, Florida.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
LADOTD CONSTRUCTION COST ESTIMATING Charles Nickel, P.E. Cost Estimate & Value Engineering Director Office: (225)
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.
ADLA Budget Application For Parishes
FHA 203K IS ONE LOAN FOR A PURCHASE OR REFINANCE, THAT ALSO FINANCES HOME IMPROVEMENTS. WHILE THE FHA 203K HAS MANY ADVANTAGES, ITS PRIMARY BENEFIT IS.
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
1 RMS-QCS Introduction July RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Next Year Budgeting Presented by: Kim Newman ERP Project Coordinator PowerPoint.
Tyrone Ware FDOT Specifications & Estimates Office Estimating Systems Support Section.
Construction Contracts and Project Delivery Methods
Enhancements in Estimation and Bid Analysis Randy Lawton Info Tech, Inc.
PLANNING AND SCHEDULING
Software Development Process and Management (or how to be officious and unpopular)
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Pack Yearly Planning Things You Should be Working On Now.
TEAM Enhancements 2003 Project Work Plan. Application Enhancements Ten application enhancements were selected as the most critical for completion in FY.
STRUCTURAL ENGINEERING. What Does a Structural Engineer Do?
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012.
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
Online Catalog Tutorial. Introduction Welcome to the Online Catalog Tutorial. This is the place to find answers to all of your online shopping questions.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
WELCOME - As you enter the room… Walk around, Read the posted questions, and Use the colored dots provided to select the four questions that are most important.
DHHS COE Meeting Agenda May 19, 2011 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update.
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
DHHS COE Meeting Agenda February 11, 2010 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update.
PestPac Software. Pay On Commission Commission can be paid on Production, Receipt, or Up-Front. Production: Commission will be paid when work is completed/an.
DHHS COE Meeting Agenda February 16, 2011 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update Group Exercise.
1 SCR756 – Enhancements to the MarkeTrak application –Fondly called - MarkeTrak Phase 3 –ERCOT CEO determined that SCR756 is not necessary prior to the.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference ERP Fixed Assets ERP Fixed Assets Presented by: Will Brock ERP Programmer PowerPoint.
1 People First System Enhancements Release 1 B Leave Balance Overview Screen.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Scrum Overview. Agenda What is scrum…and what it isn’t Scrum’s Characteristics The Scrum Process Scrum Phases Measurements Key Practices Backlogs Sprint.
COBRE Post Award Management Christy Leake Grants Administration Branch National Institute of General Medical Sciences, NIH.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Title of presentation Name(s) of author / presenter / co-authors
SP Business Suite Deployment Kick-off
Design process.
Managing the Project Lifecycle
Begin at
Adam Hooker Director of Accounting Laurel County Board of Education
Design process.
Presentation transcript:

FDOT Estimating Systems Support Manager Cost Estimate Management, Cost Trends and Long Range Estimates for Turnpike Enterprise / FICE Estimates Training Dale Stanley FDOT Estimating Systems Support Manager (850) 414-4197 SC 994-4197 dale.stanley@dot.state.fl.us

Topics Part 1: Part 2: Cost Estimate Management Cost Trends Communication Part 2: Estimating Systems LRE Update

Cost Estimate Management and Cost Trends Part 1 Cost Estimate Management and Cost Trends

Cost Estimate Management Means controlling scope of work and design parameters to stay within the construction cost budget Cost Estimates Task Team: “The Project Scope of Work should be well defined early in project development. Significant scope changes should be approved by upper management.”

Cost Estimate Management There may be times when changes are necessary, but cost management involves knowing the cost impact of these changes. We can’t expect to add work to a project without increasing the cost!

Cost Estimate Management Cost Estimates Task Team: “Estimates should NEVER be artificially constrained to stay within budget.”

Updating Budget Estimates In many cases, cost estimates are not updated frequently enough to reflect the latest scope of work until Phase III plans, when the pay items and quantities are available. Cost Estimates Task Team: “Estimates should be updated at every project phase and at least every six months, whether or not final quantities are available.”

Updating Budget Estimates Performance and Quality measures are based on the estimates at: Initial entry into the Work Program Scope development Phase 2, 30% Plans stage Official Estimate Estimates MUST be updated at each of these milestones !!

Communication

Communication Cost Estimate Task Team: “The Districts should foster a culture that requires a close working relationship between project consultants, project managers and estimators to ensure the project features are accurately reflected in the estimate.”

What Happens When the Estimator Isn’t Informed?

What Happens When the Estimator Isn’t Informed?

Consequences of Bad Estimates What happens if we underestimate? Projects may have to be moved out. Related activities (R/W, Utilities) will be affected. What happens if we overestimate? Production limits are not achieved. Public lack of confidence – we could have done more with the money we had.

Recent Cost Trends

Recent Cost Trends (Annual Averages) Asphalt Jan-Dec 2003 $53.93/ton Jan-Dec 2005 $77.66/ton Concrete (Structural) Jan-Dec 2003 $549.82/CY Jan-Dec 2005 $761.71/CY Steel (Reinforcing) Jan-Dec 2003 $.52/LB Jan-Dec 2005 $0.91/LB 44.0% 38.5% 75.0% Figures based on Weighted Averages

Rising Asphalt Costs by Quarter $85.38 $51.60 +20.1%

Rising Concrete Costs by Quarter $490.02 $1,045.14 +64.2%

Rising Steel Costs by Quarter $1.28 $0.53 +48.8%

Causes for Major Cost Increases Construction market saturation: “Hot” Market, both public and private sector Labor and equipment shortages, due to hurricane recovery efforts Material shortages Fuel cost increases Project requirements: Hours of operation Night work Delayed start

Estimating Systems and LRE Update Part 2 Estimating Systems and LRE Update

Estimating Systems Long Range Estimates (LRE) TRNS*PORT Budget, 5-Year Work Program Conceptual, prior to 60% Plans FDOT developed – “First in the Nation” TRNS*PORT Quantities based on complete Design Department’s Official Estimate AASHTO owned – developed by Infotech

Systems Interaction Budget $$ Pay Item Definitions Project Data & Prices Project Data Pay Items, Quantities & Unit Prices LAS TRNS*PORT CES

LRE Price Update

Price Update Process Update occurs each month Uses 1 year of bid history Uses all bidders New prices will appear on newly created projects Existing projects must be “refreshed” for new prices Blocked projects and locked pay item prices are not affected by price refresh.

Price Refresh Utilities available to LRE Coordinators Refresh Project Prices - allows individual, unblocked projects to be refreshed Mass Refresh of Project Prices – allows all unblocked projects within a District to be refreshed Mass Refresh of Selected Pay Items – allows selected pay item prices to be refreshed on all unblocked projects within a District.

Lock Price Features available to LRE Coordinators Reset and/or Lock default county prices on individual pay items Lock individual pay item prices within a project

Reset / Lock Default Prices Feature This price should be reset

Lock Project Prices Feature

Consultant Designers and Pricing Pricing LRE projects is usually done by the District Estimates Office, but each District has its own policy regarding pricing requirements. Make sure you know what your District requires!

Upcoming Enhancements

Interchange Models Default models will be available for several basic interchange designs (i.e., Compressed Diamond, Rural Diamond, Partial Cloverleaf, Semi-Directional, etc.) Model Selection will be from the sequence selection screen:

Interchange Model Selection DRAFT Subject to Change

Also In-Work: Change spec year to 2004 New Utility to copy a sequence from within the project New Field – “Quantities Complete in Trns*Port”

Intranet  Internet Next on the priority list - expected release in May No more VPN!! You will be notified when the permanent web address is known

Modifications Tracking Tab on the Main Version view will list: Date and time of change Userid Type of change (code, drills down to details) Net change in primary version cost

Architectural Component Provide site work details – Earthwork, Drainage, Electrical, Concrete, Hardscape, Utilities, Paving, Signing, Safety, Landscaping Choose building type from selection list – Administration, Rest Area, Weigh Station, Toll Plaza, Utility, Parking, ITS Provide Building details – SF, costs for concrete, masonry, metals, wood & plastics, doors & windows, finishes, etc., and cost-per SF will be calculated

Links to Typical Section Sketches

Other Pending Enhancements ITS as a subcomponent of Signalization Revise bridge types to match Trns*Port Updated pay items and fields for grassing, finished soil layer, rumble strips, etc. Many other minor enhancements

Our goal is to make the LRE system as easy and effective as possible for you! Use the Feedback button!!

Training Conducted in Districts, upon request One full-day session You must have an active userID PDH credits are now available Contact your District LRE Coordinator for information on upcoming classes.

District Estimates Coordinators D1 – Steve Walls D2 – W.C. Cobb D3 – Jess Bruner D4 – Gene Lipscomb D5 – Jonathan Linforth / Ed Kestory D6 – Ruben Rivero D7 – Jason Spilak TP – Don Brackins CO – Dale Stanley / Tyrone Ware