Phase II Review MSD II P14347. Size is too big and not comparable with original testing Hinge is not possible with rapid prototyping, metal hinge would.

Slides:



Advertisements
Similar presentations
Patent Pending ESG Strap Grounding Solutions Presentation by: Electro Static Technology.
Advertisements

Melting Probe IWF-EXP/ÖAW GRAZ Size: 40 x 40 x 195 mm Mass w/o electronics Calculated: 450g Measured: 350g, 3m tether Main Components Cable.
Problem y The frame ACD is hinged at A G
Systems Analysis & IT Project Management Pepper. System Life Cycle BirthDeathDevelopmentProduction.
In this presentation you will:
ServiceLink Direct From Walker Martyn Software Ltd.
Mid-Phase Project Update MSD II P Updated Documentation Updated Project Plan Updated BOM.
MSD-I Project Review Modular Motion Tracking Sensors 1.
LFTB Proprietary Information 1 Fuser test bed ™ R I T MSD1 Project Review February 22, 2007 Fuser Test Bed P07501 IE TEAM Justin McMillan – Project Lead.
Chapter 8 Prototyping and Rapid Application Development
A simpler way to shop!. Tuesday, January 31 st 2oo6 Capstone, Spring 2oo6 The system is made up of three different modules: Product Two different types.
EDGE™ MAV Control System - P Management Review (MSD I) Erik Bellandi – Project Manager Ben Wager – Lead Engineer Garrett Argenna – Mechanical Engineering.
AUTOMATED SHOPPING LIST Team Moritz: Philip Seton, Anas Daboussi Jedediyah Williams, Olayinka Sanusi.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
The Project at a Glance... Project budget of $1000 Power provided by existing 5.0V EVB power supply Previous design has been wire wrap assembled to serve.
A6: Team Rallye Potable Water Still Presented by: Full Group November 15, 2006.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application MekElekItroniks Design Review Battery Charger Project.
Academic Selectors can log in using the same web links as applicants. Note that the screens are regularly reviewed and enhanced. The initial log on screen.
MSD-II Project Review Modular Motion Tracking Sensors 1.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
Wireless Data Acquisition for SAE Car Project by: J.P. Haberkorn & Jon Trainor Advised by: Mr. Steven Gutschlag.
P08009 Audible Memo Board Phase II Monday, October 22, 2007 P08009: Audible Memo Board Phase II Sponsor: Tala Hopkins Jon GosligaAudio Output Lead Loic.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
Low Cost Fundus Camera P15590 December 11th, 2014
EF 108, April 2005 Robotic Vacuum Team 8 Jennifer Brooks William DeanNathan Rowe Jake Smith Katie Stokes.
Detailed Design Review Project P13363 Members: Justine Converse (IE) James Cover (CE) Alexander Eschbach (EE) Jason Hang (ME) Ashley Trode (EE) Guide:
Wildlife Tracker MSD II P14347 Final Presentation.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
Week 2 Electrical Subsytem Testing MSD II. Transceiver Communication Used two Linx EVM transceivers with evaluation boards with breadboard to.
Setting up the Ricoh C305 Press F5 to start the Presentation
EXAMPLE – Quality Control Plan For Consultants
R.O.M. System Team: RISC Takers Team Members: Paul Banks, Yorick Robinson, Evan Tu, & Hans Weggeman Louisiana State University – Senior Design October.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
“PCB” -AMIT NIKAM -ASHI NAGARIYA.
Chapter 12: Systems Investigation and Analysis. Agenda  How to Develop a CBIS?  Systems Development Life Cycle (SDLC)  Prototyping  Join Application.
THE AVENGERS Measuring Atmospheric Ozone gases. General  The primary goal of the ITO sensor project is to measure the concentration of Ozone (O 3 ) as.
0 iNEMI Board and System Manufacturing Test TIG Update Phil Geiger 2008 IEEE Board Test Workshop Sep 08.
BY: BILL PAHUTSKI AND NEIL BERG PARACHUTE PROJECT.
VERTIGO 2 Validation Review Presentation April 6, 2005.
Phase III Design Review MSD II P New Parts Purchased User Device enclosure with correct sizing, from McMaster-Carr New Battery pack with correct.
1. Hardware: each component on the microcontroller will need to be tested individually using multi-meters, logic analyzers, and circuit probe analysis.
THE AVENGERS Measuring Atmospheric Ozone 1 of 25.
Week 10 Project Update MSD II P Parts Arrived Sparkfun GPS Antenna 1 (of 2) TTL cables.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
ECE 477 DESIGN REVIEW TEAM 4  SPRING 2015 Matt Carpenter, Grant Gumina, Chris Holly, and Michael Pak.
P08311: FPGA Based multi-purpose driver / data acquisition system Sponsor: Dr. Marcin Lukowiak Team MemberDisciplineRole Andrew FitzgeraldCEProject Manager/FPGA.
Team 20: Jordan Wagner.  iPhone controlled marble maze game  Rotation of the phone is translated into rotation of the board  Stepper motor connected.
Computer Parts And Components PERIPHERALS. Definition of Peripherals External hardware devices attached to the computer are called peripheral devices.
Dance Floor Project By: Ross King and Kyle Greulach.
44222: Information Systems Development Documenting a Solution Ian Perry Room:C49 Extension:7287
 Pages 3-5 – Login Process Pages 3-5 – Login Process  Pages 6-9 – Searching for a Child Pages 6-9 – Searching for a Child  Page 10 – Contacting the.
Computer Networks.  Which is the best definition of a circuit switched network?  An electric circuit where the connections get switched based on who.
P10041 Managerial Review. MSD I Primary Objectives Determine and Refine Customer Needs Map Customer Needs To Engineering Specs Develop Project Plan Thoroughly.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Joseph Ferrara Team Lead (ME) Joseph ChurchDesign Engineer (ME) Joshua Van Hook LabView Engineer (EE) Jamie Jackson Electronics (EE) Joelle Kirsch Project.
Subsystem Build & Test Review
Technologies for Neuroimaging
<Add team picture or relevant project picture here>
Microcontroller Evolution
Project 1: 3-D Maze Patience Game (1)
Final Project Review Team Digiceipt April 19,
Resistance Measurement
P16462: Wind Energy Base Station MSD II Phase 4 Review 4/15/2016
Week 8 Project Update MSD II P14347.
Microcontroller Evolution
Somerset Berkley Regional High School
Mechanical Bioreactor
Chapter 8 Prototyping and Rapid Application Development
Team P16228: Magnetically Levitated Propeller
Presentation transcript:

Phase II Review MSD II P14347

Size is too big and not comparable with original testing Hinge is not possible with rapid prototyping, metal hinge would need to be added Moment is generated along wrong axis, attachment must open from impact force Four parts with a lateral break are required to install circuit boards Exposed wires between both boards Mechanical Issues

Mechanical Solutions Tether (Fishing Line, Kevlar Thread, Key Ring) ▫Eliminates the need for hinge ▫Smaller moment required to open; Foam tape for testing to hold together 1 PCB? ▫No exposed wires ▫Reduces risk of damage to PCB by separating the PCB from impact site ▫Barbed hook will now have a sturdier design ▫Printed parts would reduce down to three instead of four

Arrow Flight Testing (MSDI)

Electrical Accomplishments Able to successfully log into Raspberry Pi Using Matlab to send digital signal LCD Screen assembled ▫Able to display inputted latitude/longitude Design with minimal PCB? ▫GPS antennas need to be surface-mount

Transceiver / Raspberry Pi Update

Team Assessment Still several key items to be addressed PCB design and GPS receiver -> Transceiver highest priorities Raspberry Pi working after this past week Need to seek guidance from Linx

Next Steps Purchase more parts Contact Linx, sort out issues Update MSD I documentation GPS receiver interfacing with transceiver Hold tight for smaller transceivers Final PCB decisions