Company Confidential 8/18/2015 Performance stream status EAQG performance benchmark York General Assembly Alain Bonnard Christian Buck October 22 nd 2010.

Slides:



Advertisements
Similar presentations
Cross-Acceptance: UNIFE expectations Alice Polo Safety and Certification Manager.
Advertisements

Air Transport System JTI CLEAN SKY
The worldwide global support for your company PARIS AIR SHOW 2007 A.C.S. International Aeronautical Consulting Services International.
Module 1 Introduction to the International Aerospace Quality Group (IAQG) February 2015.
Company Confidential 1 IAQG “ Supply Chain Management Handbook” IAQG General Assembly York, North Yorkshire, UK Friday, October 22, 2010 Bill Schmiege.
Company Confidential Registration Management Committee (RMC) Other Party (OP) Assessor Workshop San Diego, CA January 20, AS9104/2 Oversight Process.
Performance Review Institute
Bryan Blunt, IAQG OASIS Administrator Montreal, Canada October, 2013 OASIS Tools for Suppliers.
Hexcel’s Quality Systems = World Class Quality Composite Materials for the Global Aerospace Industry
Prepared by: Tim Lee – Chair IAQG OPMT The Boeing Company October 10, 2013 International Aerospace Quality Group (IAQG) Other Party Management Team (OPMT)
1 IAQG Other Party Management Team (OPMT) - Report to the IAQG General Assembly Montreal Canada – October 7 th, 2005 Michael C. Roberts IAQG OPMT Vice.
Supply chain management in Regal Marine
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
Page 1/12 April 29th, 2005Amsterdam General Assembly Forum Didier LUX Airbus SVP Quality IAQG& Airbus Supply Chain Management.
GE Aviation. 2 Overview GE - Aviation GE Aviation A leading manufacturer of jet engines for civil and military aircraft and global provider of maintenance.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved Section 2 ENTERPRISE SYSTEMS.
International Aerospace Quality Group
Collaboration in the Aerospace Supply Chain -
Company Confidential 1 Requirements Strategy Stream General Assembly Alan Daniels York, United Kingdom October 22, 2010.
Page 1 Guy DION – Requirements Strategy Stream Leader San Diego GA – 7 April 2006 IAQG Requirements Strategy Stream San Diego General Assembly Meeting.
International Aerospace Quality Group (IAQG) Informational Overview 28th June 2001 Gary Baker ~ Americas Sector Leader ~
Proposal for a new UNECE regulation on recyclability of motor vehicles Informal Document GRPE Reply to the Comments of the Russian Federation Informal.
Leadership and Culture SEA Managed Process Continuous Improvement Process Presented May 24, Phone: 1(203)
Global Standards for a Global Industry ANSI/SAC Symposium May 30, 2007 Laura E. Hitchcock Standards Strategy and Policy The Boeing Company Chair, The Strategic.
FRANCE HOUDAN Phone : 33 (0) USA ARLINGTON, TEXAS Phone :
Company Confidential Rewrite Team Proposal Tim Lee - OPMT.
IAQG General Assembly 29 April 2005 Amsterdam. Version 9 2 H. Luijt\ ASD-EASE Association according to Belgian law 52 member in 8 European countries.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
Page 1/18 October 15, 2004Beijing General Assembly Forum IAQG Expectations Kinsuke Hara Director - Quality Mitsubishi Heavy Industries, Ltd Nagoya Aerospace.
Results of pilot benchmark study Anfried Sauerborn/René Colin EAQG Metrics WGtApril 2008.
An Overview International Aerospace Quality Group General Assembly – San Diego 7 April 2006 Bill Black IAQG President EADS.
CHAPTER 4: Procurement.
An Overview International Aerospace Quality Group General Assembly – Montreal 7 October 2005 Bill Black IAQG President EADS.
31-May-16 chart 1 International Aerospace Quality Group Registrar Management Schemes SEPTEMBER 2002 Barb O'Dell.
06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Philippe Removille SNECMA Moteurs 5.
Workforce Development SEA Managed Process Job Skills & Cross Training Process Presented July, Phone: 1(203)
2005 Europe/US International Aviation Safety Conference, Cologne 7-9 June The Europe-US International Aviation Safety Conference 2005 ‘ Aviation Safety.
An Overview International Aerospace Quality Group General Assembly – Amsterdam 29 April 2005 Gary Baker IAQG President The Boeing Company.
AAQG Sector Report William SchmiegeOctober 10, 2013.
Date Create your footer by changing copy in the Header and Footer section1 Network Rail’s Strategic Agenda Calvin Lloyd.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
Phil Curnock ADS SC21 Manager.
International Aerospace Quality Group (IAQG) Informational Overview March 2002 Gary Baker Americas Sector Leader International Aerospace Quality Group.
Big Data in Airbus Flight Test and Integration Center
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
International Aerospace Quality Group (IAQG)
1 © The Delos Partnership 2003 Global Strategic and Operations Planning Initial Site Education.
1 IAQG Oversight Team Report (Other Party Management Team) (Abridged Version - mcr) Amsterdam – April 27 th, 2005 Julio Perez Caballero IAQG OPMT Chair.
Company Confidential IAQG Workshop October 21, IAQG Workshop 9100 Certification Scheme Certification status – Changes implemented Tim Lee The Boeing.
Company Confidential AS9110 – Revision Status and Training Reported by: Rick Downs Date of Report: 2011 July.
Supply Chain Progress towards Aeronautical Community Excellence An efficient Supply Chain to meet new global challenges An efficient.
22 October 2010IAQG General Assembly York UK October International Aerospace Quality Group (IAQG) General Assembly 22 October 2010.
To the Greater Phoenix Chapter of ASQ January 10, 2013.
Company Confidential March 2015 Americas Aerospace Quality Group (AAQG) Newcomer Orientation 1.
Standards for the Global Enterprise Presentation by Laura E. Hitchcock External Standards Management The Boeing Company ANSI Annual Conference October.
Slide 1 PDT Europe 2014, October 2014, Paris 1 AeroSpace and Defence Industries Association of Europe Through Life Cycle Interoperability as developed.
Purchasing Suppliers.
“Supply Chain Management Handbook” Supplier Selection and Capability Assessment Model IAQG Leader: Christian Buck – Safran Updated: June 2008.
Benchmarking.
SUPPLIERS INVOLVEMENT
Procurement’s Impact on Logistics.
AEROSPACE QUALITY MANAGEMENT SYSTEM STANDARD AS / EN / JIS Q9100
International Aerospace Quality Group (IAQG)
Statistical Product Acceptance
Bill Black IAQG President EADS
Focus on “How” through SCMH
Introduction to the International Aerospace Quality Group (IAQG)
International Aerospace Quality Group European Sector Leader
Tim Lee The Boeing Company Chair IAQG OPMT October 22, 2010
Aerospace Supply Chain
Presentation transcript:

Company Confidential 8/18/2015 Performance stream status EAQG performance benchmark York General Assembly Alain Bonnard Christian Buck October 22 nd 2010

Product and Services Quality and Delivery will have improved 20% per year throughout the product lifecycle Robust processes achieved throughout the Supply Chain (SCMH supplier maturity assesment level 3 or better) IAQG Quality management system certification program robust, recognised and valued 90% of the industry supply chain certified to IAQG Quality Management System Standards Performance stream supports IAQG 5 years vision development

Aerospace and Defense Performance Index A process consolidating, reporting and publishing the measurement of the whole aerospace and defense supply chain progresses toward the 20% improvement goal Based on observed and sampled On Time Deliveries – On Quality Deliveries Measurements based on standard “metrics definitions” A process allowing each supplier to find its position within the index and to set improvement objectives by itself or in the frame of a customer-supplier relationship

Performance Index Process Loop Suppliers & customers set improvement goals Each supplier is able to find its position in the index Suppliers OTD OQD IAQG members select a representative sample of suppliers data IAQG members provide data to Performance Agency (suppliers anonymous) IAQG members observe their suppliers performances IAQG publishes data (e.g. next slide) IAQG Council review to 20% improvement goal Performance Agency consolidates data (members anonymous) 4

5 On Quality Performances 2007/2008 Evolution Improvement Deterioration 2007: 443 ppm 2008: 392 ppm Item Escape Rates Distribution Sample of 138 suppliers 2007: 4000 ppm 2008: 3500 ppm 2007: 10 ppm 2008: 5 ppm Performance Index Possible Publication

EAQG Supply Chain Benchmarking Alain BONNARD EAQG Operations Manager IAQG General Assembly York, UK, October 22 nd, 2010

Benchmarking Project EAQG Initiative launched within the IAQG European Sector Project concept defined in 2009 Decision to proceed taken in September 2009 Considered as a Pilot Case Participation from EAQG Company Members based on a voluntary basis Data collection started in January 2010 EAQG Benchmarking Project 7 Goal: Get EAQG Supply Chain 2010 Performance level

Benchmarking Principles 2 Performance Metrics »Conformity (Item Escape rate in PPM) »Punctuality (On time Delivery in %) Suppliers Performance only »Average of EAQG Suppliers Performance for each Business Unit (if any, optional*) identified by EAQG participating companies (2 data / Per Business Unit) »Average of EAQG Suppliers Performance for each Technological Segment (Optional*) of each Business Unit (2 data / Per Business Unit / Per Technological Segments) 1. Benchmarking Principles (Optional*) : To be decided by EAQG participating Companies 8

Benchmarking Principles General results (All Technological Segments together = Average of Suppliers Performance for each Business Unit identified by EAQG Companies) –Graph / metric »Conformity (Item Escape rate in PPM) »Punctuality (On time Delivery in %) –Graph / metric per Technological Segment (for EAQG participating companies willing to have Technological segments) 1. Benchmarking Principles (Cont’d) Each EAQG Member is receiving the same General results 9

Benchmarking Principles Customized results (per company) –Graphs / Metric (Conformity & Punctuality) with identification of your company Business Units (Optional*) –Graphs / Metric per Technological Segment (Optional*) with identification of your company Business Unit (Optional*) : To be decided by EAQG participating Companies 1. Benchmarking Principles (Cont’d) Each EAQG Member is receiving the Graphs with its Business Units Company positions on the graph 10

Metrics Definition »Conformity: Escape – Non Conformity level after delivery to the customer  Item Escape Rate expressed in PPM (Definition in § IER) »Punctuality: On Time Delivery of items to the customer  Delivered items expressed in % (Definition in § 8.1 OTD) According to Metrics definition made by EAQG Working Group Period of Measurement: 6 months rolling average or in exceptional case 12 months based on volume of parts Double click to open the document 2. Metrics Definition 11

Industry Segments Option to have the benchmarking results per Technological Segment 5 defined Technological Segments made by the dedicated Working Group after collection of identified segments made by each EAQG participating Member (See 5 Segments next slide) Benchmarking per Technological Segment 3. Technological Segments 12

Industry Segments 3. Technological Segments Definition EAQG segment id. EAQG segments keywords TS1 Details parts or machined parts or metal machining or manufactured parts or finished parts TS2 Systems or equipments or avionics or others sub systems suppliers TS3 Raw material or forging or casting or non metallic material or plastics parts suppliers TS4 Hardware or technical products or fasteners or wiring TS5Barrels, aerostructures, structures suppliers 13

EAQG Members 4. EAQG Company members Advanced Electronics Company AgustaWestland Airbus Airbus Military Alenia AVIO BAE Systems Cassidian Dassault Aviation EADS ASTRIUM Elbit Systems Eurocopter Fokker Aerospace GE Aviation Systems HEGAN (ITP) Hispano Suiza IAI Liebherr MBDA Meggitt Messier-Dowty MTU PFW RAFAEL Rolls-Royce SAAB SAFRAN SAGEM SNECMA SONACA SUKHOI THALES Turbomeca Volvo Aero. ZODIAC Aerospace 14

5. Participating EAQG Company members EAQG Bench- marking 2010 Number of EAQG Members participating Number of EAQG Members NOT participating Total EAQG Company Members Partici- pation Rate % Percentage of participation: / of Total EAQG Companies: 63 % Participating EAQG Members 15

Benchmarking Results Benchmarking All 16

TS Benchmarking Results Benchmarking 17

Benchmarking Results Benchmarking TS

Benchmarking Results Benchmarking TS

Benchmarking Results Benchmarking TS

Benchmarking Results Benchmarking TS

Benchmarking Results All 69 % Benchmarking 22

Benchmarking Results Benchmarking TS1 77 % 23

Benchmarking Results Benchmarking TS2 68 % 24

Benchmarking Results Benchmarking TS3 80 % 25

Benchmarking Results Benchmarking TS4 79 % 26

Benchmarking Results Benchmarking TS5 67 % 27

Benchmarking Results Benchmarking Comparison with Automotive industries All AutomotiveAerospace & Defence 28

Benchmarking Results Benchmarking Comparison with Automotive industries All 95 %69 % AutomotiveAerospace & Defence 29

Benchmarking Results Data TypeAve-rageTS1TS2TS3TS4TS5 Conformity (ppm) Punctuality (%) Comparison Aerospace & DefenceAutomotive Conformity (ppm) Punctuality (%) Benchmarking Results Benchmarking 30

Next Steps 7. Next Steps  Extend Performance Metrics initiative at IAQG level (IAQG Strategy Improvement stream – Performance) To be implemented early 2011 at International level 31

32 Performance Index Development Whole Aerospace and Defense Supply Chain is estimated to : –14000 sites certified to 9100, 9110 or 9100 sites –8000 sites planning certified (rough order of magnitude) –Several thousands of other suppliers A representative sample of this supply chain is around 500 suppliers, Global development plan leads to first index publication in spring next year Any suppliers willing to join are welcome

33 Questions?