WORK PROBLEMS Working Together. WORK PROBLEMS KEY CONCEPTS: 1) Time to complete job alone VS Work rate 2) Work Rate x Time Worked = Fraction of job done.

Slides:



Advertisements
Similar presentations
RATIONAL WORD PROBLEMS.
Advertisements

Problems about Numbers If one more than three times a number is divided by the number, the result is four thirds. Find the number. LCD = 3x 5.6 – Applications.
The Olympic Swimming Pool. Level 1. London 2012
10-8 Applying Rational Equations Warm Up Warm Up Lesson Presentation Lesson Presentation California Standards California StandardsPreview.
Real World Problems MA.912.A.5.7 Solve real-world problems involving rational equations (mixture, distance, work, interest, and ratio).
Solving Rational Equations
Warm - Up. Agenda CA Standards: 5.0: 5. Students solve multi-step problems, including word problems, involving linear equations and linear inequalities.
RATIONAL REVIEW. Find the inverse of each function and verify. f(x) = -6x + 3.
8.1 Work Solving Work Problems. 8.1 Solving Work Problems The term “Work” implies that something is getting done. This something can be mowing a lawn,
5.5 Solving Fractional Equations BobsMathClass.Com Copyright © 2010 All Rights Reserved. 1 To solve an equation with fractions Procedure: To solve a fractional.
Slide 7- 1 Copyright © 2012 Pearson Education, Inc.
Answers to Homework (12-8)
Lesson 8-1: Multiplying and Dividing Rational Expressions
Solving Equations. Then/Now You translated sentences into equations. Solve equations by using addition and subtraction. Solve equations by using multiplication.
HAWKES LEARNING SYSTEMS math courseware specialists Copyright © 2010 Hawkes Learning Systems. All rights reserved. Hawkes Learning Systems: College Algebra.
Problem Solving The quotient of a number and 2 minus 1/3 is the quotient of a number and 6. Find the number. LCD = – Rational Expressions.
Standardized Test Practice
Review for Test 2.
Slide Copyright © 2007 Pearson Education, Inc. Publishing as Pearson Addison-Wesley.
5.6 Applications of rational expressions VnOlvFqmWEY.
Objective - To solve rational equations. Solve. Variable in denominator Restriction:
Ch 11: Rationals G) Work Word Problems
Problem Solving and Rational Equations MATH 018 Combined Algebra S. Rook.
1 © 2010 Pearson Education, Inc. All rights reserved © 2010 Pearson Education, Inc. All rights reserved Chapter 1 Equations and Inequalities.
§ 6.7 Formulas and Applications of Rational Equations.
Rate & Work Problems. Rate Problems: A rate is way of expressing how fast something occurs such as mi/hr (rate of speed) or $/hr (rate of earning).
7.8 Work Problems Purpose: To solve word problems involving to job rates working together to get one job done. Homework: Finish Worksheet and p
Concurrent Work Problems t = time together a = first individuals time b = second individuals time 1 = the entire job.
Test 2 Review The test will consist of 3 sections. Section 1 is vocabulary matching. Section 2 is a Rate Per 100 problem. Section 3 is a Unit Rate Problem.
Rates and Ratios. Ratios and Rates ratio – a comparison of two numbers by division written in several different forms.
Copyright © 2006 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Solving Applications Using Rational Equations Problems Involving Work Problems.
Warm ups Tobin decides to buy his cat a bed from an online fund that gives 7/8 of his purchase to shelters that care for animals. How much of his money.
NEXT Topic One Topic Two Topic Three Topic Four Topic Five Team One Team Two Team Three Team Four Team.
Algebra II Chapter 9 Applications: Work If a painter can paint a room in 4 hours, how much of the room can the painter paint in 1 hour? A pipe can fill.
10.7 HW Answers.
B = 1.8 or 1 4/5 49 y = 8 Solve ANSWER.
Rational Equations Technical Definition: An equation that contains a rational expression Practical Definition: An equation that has a variable in a denominator.
Writing and Solving a Two-Step Equation EXAMPLE 2 The sum of 4 times a number plus –6 is 14. What is the number? 4 times a number and –6 is 14. Write a.
Warm Up It took 6 people 8 days to build a brick wall. The construction crew needed to build an identical wall but needs it done faster. If they add.
Linear Applications – Harder Versions 1)Cindy leaves by plane to visit her son at college 420 miles away. 15 minutes later, her son leaves his apartment.
RED Name_________________________. If there are 12 tables, how many people can sit down? If there are 20 tables, how many people can sit down? Sal is.
WORK Problems 1) An old conveyor belt takes 21 hours to move one day’s coal output from the rail line. A new belt can do it in 15 hours. How long does.
Describe how my family currently uses water saving techniques.
Using Formulas 3.4 p Using Formulas to Solve Problems A formula is an equation that shows a relationship between values that are represented by.
Lesson 8-6: Solving Rational Equations and Inequalities.
Homework 1. Pipe A can fill a storage tank in 40 minutes. Pipe B can fill the tank in 80 minutes. How long does it take to fill the tank using both pipes.
Judge the reasonableness of the results of rational number estimates and/or computations.
§ 6.7 Formulas and Applications of Rational Equations.
11.8: Solving Rational Equations Algebra 1: May 6, 2015.
§ 6.7 Formulas and Applications of Rational Equations.
WARM UP Divide and check SOLVING RATIONAL EXPRESSIONS.
Objective - To solve work problems Work Rate TimeWork Done Work Rate TimeWork Done 5 hrs.1 Job.
WARM UP 1.Solve 1.If a computer’s printer can print 12 pages in 3 minutes, how many pages can it print in 1 minute? Multiply through by x – x(x.
Bingo
Splash Screen.
The Four Seasons - December, 1963 (Oh, What a Night)
Solving One-Step Equations
Extraneous Solutions and Work Problems.
EXAMPLE 1 Standardized Test Practice.
Unit 6 "Radical and Rational Functions" Title: Inverse Variation
Making Word Problems Easy: A Collection of Fun Word Problems
Work Word Problems Pencils Down Please:
Rational Functions: Applications
Two-Step Equations Mrs. Book.
Chapter 5 Section 3 Solving Linear Equations with Fractions and Decimals by Clearing the Denominators.
Possible observations:
Ratio, Proportion, and Other Applied Problems
working at different rates
Do Now: Mr. Tamhane takes 6 minutes to solve a math problem, while Mr. Fox can solve the same problem in 5 minutes. How much of a math problem can each.
Solving Fractional Equations
Presentation transcript:

WORK PROBLEMS Working Together

WORK PROBLEMS KEY CONCEPTS: 1) Time to complete job alone VS Work rate 2) Work Rate x Time Worked = Fraction of job done BIG IDEA: Different Contributions add up to complete ONE job

Work rate – is the rate at which a task can be done Example: If a painter can paint a room in 8 hours, then the task is to paint the room.

If a painter can paint a room in 8 hours and an apprentice painter can paint the same room by himself in 10 hours, how long will it take them to paint the house together?

In general, we have the following work-rate formula:

If we factor out the time, t, and then divide both sides by t, we obtain an equivalent work-rate formula:

2. Working alone, Billy’s dad can complete the yard work in 3 hours. If Billy helps his dad, then the yard work takes 2 hours. How long would it take Billy working alone to complete the yard work?

The amount of the task each completes will total 1 completed task.

Joe’s garden hose fills the pool in 12 hours. His neighbor has a thinner hose that fills the pool in 15 hours. How long will it take to fill the pool using both hoses?

Video Solution

Grace can do a job in 3 hours while John needs 5 hours to finish the same job. How long will it take them if they work together? Work Rate TimeWork done Grace John

TRY THIS Suppose a swimming pool has two intake pipes. One pipe fills the pool in 10 hours and the other in 15 hours. If both pipes are open, how long will it take to fill the pool?

Work Rate TimeWork done 1 st pipe 2 nd pipe Let x = the number of hours it takes for both pipes to fill the pool

4. Working together, two construction crews can build a shed in 5 days. Working separately, the less experienced crew takes twice as long to build a shed than the more experienced crew. Working separately, how long does it take each crew to build a shed?

To determine the time it takes the less experienced crew, we use 2x: Answer: Working separately, the experienced crew takes 7½ days to build a shed, and the less experienced crew takes 15 days to build a shed

AloneRateTimeWork done Experienced bricklayer Apprentice

An experienced landscaper can landscape a lawn in 36 hours. A not so experienced landscaper can do the job in 45 hours. How long would it take them to landscape the lawn if they work together?

Machine A can do a job in 10 hours, Machine B can do a job in 15 hours and Machine C can do it in 20 hours. If all three machines were used at the same time, how long would it take to finish the job?

An experienced bricklayer can work twice as fast as an apprentice bricklayer. If it takes the two bricklayers 8 hours to finish the job, how long would it take each to do the job alone?

Two guys are working on your car. The first guy can complete the given job in six hours while the second guy needs eight hours. They worked together for two hours, but the first guy left to help another mechanic on a different job. How long will it take the second guy to finish the job?

EXERCISES !!!

A bathtub can be filled with water in 20 minutes while the drain can empty it in 30 minutes. How long will it take to fill the bathtub if both the faucet is on and the drain is open?

One pipe can fill a pool 5/4 times faster than a second pipe. When both pipes are opened, they fill the pool in five hours. How long would it take to fill the pool if only the slower pipe is used?

A bathtub can be filled with water in 20 minutes while the drain can empty it in 30 minutes. How long will it take to fill the bathtub if both the faucet is on and the drain is open?

Two guys are working on your car. The first guy can complete the given job in six hours while the second guy needs eight hours. They worked together for two hours, but the first guy left to help another mechanic on a different job. How long will it take the second guy to finish the job?

Working alone, Emeline can complete the job in 100 min. while Analyn can complete the same task in two hours. They already worked together for 30 min when their sister Len, helped them and finished the task 20 minutes later. How long would it take Len to finish the job alone?