Wisconsin DOT EDC Initiatives Rory Rhinesmith, P.E. Deputy Administrator – DTSD Bureaus.

Slides:



Advertisements
Similar presentations
William Lohr, P.E Federal Highway Administration Minnesota Division Office.
Advertisements

ODOT-OES Environmental Update Meeting September 16, 2010.
A smarter way to do business
Planning for Innovative Technology. Every Day Counts Rapid changes face the highway community in the 21st century Adapting to those changes must be a.
EDC Summit State-based Technology Discussions 1. The Innovations Warm Mix Asphalt (WMA) Precast Bridge Elements Geosynthetic Reinforced Soil Safety Edge.
EDC Summit Technology & Innovation Plenary 1. The Innovations Warm Mix Asphalt (WMA) Precast Bridge Elements Geosynthetic Reinforced Soil Safety Edge.
EVERY DAY COUNTS Gregory G. Nadeau FHWA Deputy Administrator.
Planning for Success: Applying Systems Engineering to ASCT Implementation TRANSPO 2012 October 29, 2012 Eddie Curtis, PE FHWA Office of Operations / Resource.
IOWA DOT UPDATE 2014 APWA IOWA CHAPTER FALL CONFERENCE JOHN E. DOSTART, P.E.
Regional Asphalt Seminars Pavement Wedge Guidelines and Specifications EMMETT R. HELTZEL, P.E. STATE MAINTENANCE ENGINEER.
Research Advisory Committee Annual Meeting FHWA Briefing Michael Trentacoste Associated Administrator Research, Development, & Technology Director, Turner.
Waseem Fazal Pavement & Materials Engineer U.S. Department of Transportation Federal Highway Administration Tribal Safety Champions workshop December 2-3,
Alternative Project Delivery
1. George Washington Lead Change December 25, 1776, Trenton, New Jersey 2.
Module 1 What are Prefabricated Bridge Elements & Systems for Accelerated Bridge Construction (ABC/PBES)? Module 1 What are Prefabricated Bridge Elements.
M AKE E VERY DAY COUNT A CCELERATING B RIDGE C ONSTRUCTION WITH P REFABRICATED B RIDGE E LEMENTS & S YSTEMS.
FHWA Update 2011 VOBug Meeting Helena, MT Thomas Saad, P. E. FHWA Resource Center Phone:
THANK YOU  John Horsley and the entire leadership of AASHTO  AGC of America and ARTBA (American Road and Transportation Builders Association)  NACE,
Irene Rico Division Administrator Federal Highway Administration Moving Ahead for Progress in the 21 st Century ~ MAP-21.
Certification/Qualification Program. Certification Program What is it? Who is involved? What should be considered? Where can a Certification Program work.
FHWA LTAP/TTAP Update Technology Partnerships Programs 2012 LTAP/TTAP National Conference: Grapevine, TX.
Accomplished to date:  Extensive outreach  Guidance and FAQs on most programs  FY13 apportionments Underway:  Final guidance and FAQs on some topics.
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
TRIBAL INVOLVEMENT IN EVERY DAY COUNTS IVAN MARRERO, P.E. ASSISTANT DIVISION ADMINISTRATOR FHWA-OKLAHOMA DIVISION.
Accelerating Project Delivery California Transportation Commission August 22, 2012 California Department of Transportation  Tab 64.
FHWA Perspective on Risk and Other Highlights. GROW AMERICA Proposal Administration’s Proposal 6 Years in length $317 billion for highways and bridges.
Mike Bowen FHWA – Kansas Division Fall TOPICS Trust Fund Status Reauthorization/Funding Every Day Counts III Performance Management Rulemaking.
Trans-Texas Corridor: A Public Private Partnership Texas Department of Transportation AASHTO Spring Board of Directors Meeting May 9, 2005 Michael W. Behrens,
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
FHWA Update Butch Wlaschin, P.E. Director, Office of Asset Management AASHTO Highway Subcommittee on Construction 2010 Annual Meeting Burlington, Vermont.
Efficiency through technology and collaboration SHRP2 and Every Day Counts Products September 9, 2015 David Otte - KYTC Jason J. Siwula, PE – KYTC.
FHWA Update AASHTO Subcommittee on Design July 26, 2010 Columbia, South Carolina Jon Obenberger, Ph.D., P.E. Preconstruction Team Leader Infrastructure.
What’s New with County Road Construction Bruce G. Stelzner Bruce G. Stelzner Chippewa County Highway Commissioner Chippewa County Highway Commissioner.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Managing a Research Program from Various Funding Sources Sandra Larson, P.E. Research and Technology (R & T) Bureau Director Iowa Department of Transportation.
Transportation Engineering and Road Research Alliance Rory L. Rhinesmith, P.E Wisconsin DOT Mid Continent Transportation Research Symposium 08/15/2013.
Greg Kelley, Assistant Deputy Director Los Angeles County Department of Public Works SOUTHERN CALIFORNIA SUSTAINABLE PAVEMENT PRESERVATION ROUND TABLE.
1 Accommodating Utilities in Highway Rights-of-Way Federal Agency Update IRWA/AI Conference Las Vegas, NV January 13, 2009.
Community Context Audits And Public Involvement Plans Rickie Clark, INDOT Joyce Newland, FHWA Presenter Title, INDOT Event Date.
May 5, 2007 AASHTO Standing Committee on Highways.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey F. Paniati Office of Operations Federal Highway Administration U.S. Department of Transportation.
National Cooperative Highway Research Program (NCHRP)
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
STANDING COMMITTEE ON HIGHWAYS BUSINESS MEETING FHWA Updates Walter C. Waidelich, Jr. Associate Administrator for Infrastructure May 29, 2014.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
Roger Petzold Federal Highway Administration Office of Planning.
Locally Administered Federal-Aid Project Initiation Workshop Project Scoping John Condon & Mike Barry November 14,
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
Adaptive Signal Control Initiatives and Validation Program Presenters Edward Fok, FHWA Resource Center Transportation Technology Specialist Dr. Douglas.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
The U.S. Department of Transportation and the Next Generation Jenny Hansen – Contractor – NG9-1-1 Project Coordinator USDOT – NHTSA.
SAFETEA-LU System Management and Operations Provisions Jeff Lindley Director of the Office of Transportation Management Office of Operations Federal Highway.
National ITS Architecture Deployment Support October 27, 2009 T3 Webinars are brought to you by the ITS Professional Capacity Building Program (ITS PCB)
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
Office of Major Project Development (OMPD) Overview November 2015.
PROJECT DELIVERY TEAM Design, ITS and ADHS Construction, Maintenance and Asset Management Team Leader, Pavement and Materials Safety, Emergency Relief.
UW - Madison Federal Highway Administration (FHWA) David L. Kopacz, P.E. Wisconsin Division Office February 20, 2015.
Interstate 270 Innovative Congestion Management Progressive Design-Build Contract.
Purdue Road School March 8, EDC Pillars Shortening Project Delivery Accelerating Technology and Innovation Deployment.
FHWA Updates/News Benjamin Beerman, PE Federal Highway Atlanta, GA
Aaron Crowley, Ph.D. KSWA Travis Smith, P.E. TDOT Biloxi, Mississippi
2013 Nevada Transportation Conference
SR 400 Express Lanes: Market Sounding
Washington LTAP Center Update
Bringing Large Commercial Airport Capabilities to Your Local Community
State Innovative Transportation Councils AID Demonstration Program
DESIGN-BUILD PROGRAM OVERVIEW
STANDING COMMITTEE ON HIGHWAYS BUSINESS MEETING FHWA Updates Walter C
FHWA Update AASHTO Committee on Construction August 12, 2019
Presentation transcript:

Wisconsin DOT EDC Initiatives Rory Rhinesmith, P.E. Deputy Administrator – DTSD Bureaus

Wisconsin EDC Round 1  Shortening Project Delivery  Accelerating Technology and Innovation Deployment

Wisconsin EDC Round 1 Shortening Project Delivery  Planning and Environmental Linkages  Legal Sufficiency Enhancements  Expanding Use of Programmatic Agreements  Clarifying the Scope of Preliminary Design  Flexibilities in Utility Accommodation and Relocation

Wisconsin EDC Round 1 Accelerating Technology and Innovation Deployment  Warm Mix Asphalt  Safety Edge  Geo-synthetic Reinforced Structures  Prefabricated Bridge Elements & Systems  Adaptive Traffic Control Systems

Wisconsin EDC Round 2 Fall Summits Spring Virtual Summits Reducing Project Delivery Time Programmatic Agreements Locally Administered Projects Reducing Construction Time 3D Modeling for Construction Means and Methods Accelerated Bridge Construction Intelligent Compaction Innovative Contracting Design-Build CM/GC Alternative Technical Concepts Reducing Project Delivery Time Geospatial Data Collaboration Safety High Friction Surfaces Environment Level of NEPA Documentation Mobility First Responders Training