GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Advertisements

STEREO IMPACT Preliminary Design Review 2001-September 11,12 David Curtis1 IMPACT Project Overview.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
SPP/FIELDS System Engineering Preliminary Design Review
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GoetzFIELDS iCDR – I&T Solar Probe Plus – FIELDS Integration and Testing Instrument CDR Keith Goetz University of Minnesota 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
10-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : EMC Dave Curtis Mars Atmosphere and Volatile EvolutioN.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
Solar Probe Plus FIELDS Instrument PDR Management Peter Harvey, PM Lindsey Hayes, DPM University of California
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
Timothy Edward Quinn FIELDS iPDR – GSE Solar Probe Plus FIELDS Instrument PDR GSE Timothy Edward Quinn UCB 1.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes Sept 30 – Oct RBSP EFW ICDR1 Integration and Test Michael Ludlam (EFW Systems Engineer)
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
GoetzFIELDS iCDR - Analyses Solar Probe Plus - FIELDS System Analyses Instrument CDR Keith Goetz University of Minnesota 1.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
GLAST Large Area Telescope:
FIELDS MEP Thermal Vacuum Cycling iPER
FIELDS MEP & V5 Pre-Ship Review Thermal Summary
Gayle K. Martin November 14, 2016
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
CINEMA System Engineering
(EFW Systems Engineer) University of California, Berkeley
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Solar Probe Plus – FIELDS Main Electronics Package
SPP FIELDS V1234 Thermal PSR
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
THEMIS Mission Assurance
FIELDS SCM Thermal iPER
Solar Probe Plus FIELDS Main Electronics Package iPER EMC Feb 2, 2017
Low Voltage Power Supply & Power Controller Board
0.0 Instrument Suite Name Presenter’s name
Systems Engineering Bob Goeke.
Presentation transcript:

GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1

GoetzFIELDS iPDR – I&T FIELDS Block Diagram 2

GoetzFIELDS iPDR – I&T Interface Control Documents Spacecraft to FIELDS –General Instrument ICD is at rev dash ( ) –FIELDS Specific ICD ( ) Minor open issues don’t preclude ETU development MOC-SOC ICD –Well developed and familiar from RBSP and STEREO FIELDS to SWEAP ICD (SPF_MEP_105_SWEAP_ICD) –Preliminary release signed on both sides Subsystem ICDs are well along –MEP, CDI, RFS, TDS, DFB, MAG, AEB, LNPS, PA, SCM Connectors and pin-outs (SPF_MEP_110_Connectors) well defined 3

GoetzFIELDS iPDR – I&T Requirements Verification Verify Instrument Requirements per IRD –Meet/Verify Quality Requirements per QA Matrix ( ) –Meet/Verify Contamination Requirements per CCP (SPF_SMA_003) –Verify Environmental Requirements per ERTRD ( ) –Verify EMC Requirements per EMECP ( ) –Verify Spacecraft Interface Requirements per GI ICD ( ) –Verify Spacecraft Interface Requirements per FIELDS ICD ( ) –Verify SWEAP Interface Requirements per FIELDS-SWEAP ICD (SPF_MEP_105) –Verify Performance Requirements per FIELDS IRD (SPF_SYS_010) Approach Described in FIELDS Verification, Validation, Test, and Calibration Plan (SPF_IAT_002) 4

GoetzFIELDS iPDR – I&T I&T Plans Philosophy –Requirements are verified as early as possible at a low level Verifies subsystems, Retires risk –Requirements are verified at the highest level of assembly possible Often involves verifying a requirement at several levels –Maintain flexibility in test sequencing to maintain schedule Tests on ETU and Flight Units –Subset of tests on ETU to qualify the design where practical and possible –Full tests on Flight units Typical Test Levels: –Subassembly (circuit board): functional –Component (e.g. V1, MAG, SCM, MEP): functional, mass properties, vibration, TV, deployments, magnetics –Instrument: functional, calibration, interface, EMC, TV 5

GoetzFIELDS iPDR – I&T Environmental Test Matrix 6

GoetzFIELDS iPDR – I&T Planned ETU I&T Flow 7

GoetzFIELDS iPDR – I&T Planned FM I&T Flow 8

GoetzFIELDS iPDR – I&T Validation All instrument requirements are captured in IRD –IRD contains columns detailing how and where the requirement is met IRD doubles as verification cross reference matrix Systems Engineer is responsible for verifying test procedures meet requirements and responsible for verifying that all requirements are met by following test plan 9

GoetzFIELDS iPDR – I&T Procedures Each test will be documented by a Test Procedure –Test procedure shall identify IRD requirements to be verified by the test –Test procedure shall include pass/fail criteria –System Engineer, QA, Subsystem lead to sign off on procedure before use –System Engineer, QA to sign off on completed as-run procedure –QA to ensure Red-lines to be transferred into procedure before next use Each completed test to be documented by a Test Report –ETU and subassembly test reports may be a combination of the as-run procedure and lab notebook –System Engineer to sign off on test reports, and determine if test adequately verifies associated requirements Discrepancies found during tests to be documented in a Problem Failure Report (PFR) –Starting with first functional tests at FM subassembly level –Includes any problem (including software) not immediately identified as a test setup or operator problem which cannot stress the flight article –QA will track PFRs to closure with concurrence of the Failure Review Board (includes APL) 10

GoetzFIELDS iPDR – I&T Calibrations Co-I hardware institutions will deliver fully calibrated sub- assemblies Once FIELDS instrument is fully integrated –Several verification cals in ambient and at temperature –Timing –SWEAP Antennas – as mechanical elements – can be tested separately 11

GoetzFIELDS iPDR – I&T Interfaces Interface tests verify interfaces meet requirements from ICD and/or specifications. FIELDS ETU to be tested with APL S/C mini emulators FIELDS FM to be tested with APL S/C emulators FIELDS TDS ETU/FM to tested with SWEAP (at UCB) At other times (prior to Observatory I&T) interfaces simulated with GSE –Board, Component level tests performed with Board Interface Simulation GSE –Instrument-level tests performed with: APL-provided spacecraft emulator Command and Telemetry GSE software Stimulation GSE or internal test signal SWEAP simulator (FIG) Deployment actuator simulators –GSE functionality, design described in GSE section 12

GoetzFIELDS iPDR – I&T Mechanical Testing Antenna mechanisms can be tested independently of electronics Full functional testing Vibration TV Where appropriate, testing will include whips 13

GoetzFIELDS iPDR – I&T Thermal Testing Tests per SPP Environmental Spec –1 survival and 6 operational thermal vacuum cycles –Temperature ranges detailed in thermal presentation Per FIELDS V&V and T&C plan –V1-V4 PAs in one range –V5 PA in one range –MAG sensors (at GSFC) –SCM assembly (at LPC2E) –MEP is the simplest Includes all sensors –Antenna mechanisms Proposed Thermal Balance test using ETU FIELDS boom and ETU sensors 14

GoetzFIELDS iPDR – I&T EMC Tests Tests per EMECP Deep Dielectric Discharge Test –Interfaces Only for MEP (Shielded) –All points on sensors outside S/C body DC Magnetics (sniff test) –ETU and Flight Units, Component level Target Is <10nT DC at outer most sensor on MAG boom Results of sniff test reported to Magnetics Working Group for analysis and possible mitigations Test to be performed by APL personnel 15

GoetzFIELDS iPDR – I&T EMC Tests Surface Charging / Electrostatic Cleanliness –Measure resistance between exposed surfaces Requirement <10 5 ohms per square to chassis ground –Some surfaces may be covered with thermal blankets blanket testing needs to be done at Observatory level repeated late in the flow Ground Bonding and Isolation –Chassis bonding < 2.5 milliohms between adjacent chassis elements < 5 milliohms box to chassis –Ground Isolation >1Mohm primary to secondary (chassis) ground –Measured at Instrument-level EMC testing ETU and FM Turn On/Off Transients –In-rush and transient current profile limits per EMECP document –Measure in-rush current and transient profile at Instrument-level EMC ETU and FM CE, CS, RE, RS Tests as detailed in EMECP. –ETU will only do CE measurements on the bench 16

GoetzFIELDS iPDR – I&T Contamination FIELDS Contamination Control Plan documents how FIELDS will meet Project contamination control requirements The only significant FIELDS contamination sensitivity is the antenna surfaces –Will be in storage through most of I&T –Special handling procedures apply when antennas are exposed No purge requirement at any point Instrument I&T will be in Class 100,000 facility at UCB –Subassemblies / Components delivered to I&T will be inspected and cleaned as needed prior to integration into components –When Instrument is not in a Class 100,000 environment the unit will be bagged Flight units will be baked out per FIELDS bakeout plan prior to delivery to APL –Vacuum bakeout at max survival temp for at least 48 hours with TQCM 17

GoetzFIELDS iPDR – I&T S/C-level I&T FIELDS and APL have had preliminary discussions w/r/t S/C level I&T FIELDS integration will involve a number of elements (~20) FIELDS magnetic sensors will have protective enclosures FIELDS will have external stimulus to support CPT functional testing Antennas will not be deployed at Spacecraft level –Too hard to implement off-load GSE at spacecraft level –First motion without whips Actuator simulators will be provided to perform simulated boom deployments –simulators contain flight-like resetable actuators (or equivalent loads) –simulators attach to S/C deployment harnessing –Simulators can be used at spacecraft-level TV 18

GoetzFIELDS iPDR – I&T FIELDS Flight Configuration 19

GoetzFIELDS iPDR – I&T FIELDS CPT Configuration 20

GoetzFIELDS iPDR – I&T Conclusion Requirements are understood Instrument I&T plans are taking shape –Previous experience helps Spacecraft I&T plans are just getting started –Previous experience helps here too FIELDS is ready to move into ETU development 21