ITAINNOVA TA: Scientific & Administrative issues Electromagnetic Compatibility Facility for electronics noise and grounding diagnostics (WP12 – Task 12.2)

Slides:



Advertisements
Similar presentations
ELECTROMAGNETIC COMPATIBILITY Dr. Donald Church Senior Staff Engineer International Rectifier Automotive Systems November 17, 2005.
Advertisements

EUDET Transnational Access : some administrative aspects Who is eligible? To be eligible to benefit from access to the EUDET infrastructures, a user group.
Training Module: The MED-Dialogue project (611433) is co-funded by the European Community's ICT Programme under FP7 6 - Resource Allocation and Budgeting.
Analog Basics Workshop RFI/EMI Rejection
WAKULLA COUNTY Travel & Expense Procedures Manual Workshop September 2, 2008.
Designing a EMC Compatible Electronic Meter using AD7755 a.
FTD-ILD sub-detector power distribution system prototype based on Supercapacitors I.Echevarria, M. Iglesias, A. Pradas, FJ. Piedrafita, Dr. F. Arteche,
ESE – Andrew Rusek Applications of Computer Modeling in Electromagnetic Compatibility (EMC) Tests (Part1) P8. Field Pattern of Three Radiating.
Current research work and plans Zbigniew M. Jóskiewicz Wroclaw University of Technology Institute of Telecommunication and Acoustics Wybrzeże Wyspiańskiego.
EMC Technology Roadmapping: A Long-Term Strategy Marcel van Doorn Philips Applied Technologies EM&C Competence Center Eindhoven, The Netherlands, March.
EMC review for Belle II (Grounding & shielding plans) Sub-systems ( XXXXX)
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
Electromagnetic Compatibility of a DC Power Distribution System for the ATLAS Liquid Argon Calorimeter G. BLANCHOT CERN, CH-1211 Geneva 23, Switzerland.
EC Contract No incofish Integrating Multiple Demands on Coastal Zones with Emphasis on Aquatic Ecosystems and Fisheries Administrative Session.
F. Arteche, C. Esteban Instituto Tecnológico de Aragón D. Moya, I. Vila, A. L. Virto, A. Ruiz Instituto de Física de Cantabria Powering requirements and.
JEFFERSON LAB Travel Update Seminar. Seminar F O C U S Approvals Needed to Travel Local Travel Foreign Travel Conference Attendance Electronic Expense.
LINKED Administrative & Finance overview18/03/2010 LINKED Leveraging Innovation for a Network of Knowledge on Education LIFE LONG LEARNING PROGRAMME LLP.
1 4. EMC measurement methods. 2 Why EMC standard measurement methods Check EMC compliance of ICs, equipments and systems Comparison of EMC performances.
INCO 3739 Integrating Multiple Demands on Coastal Zones with Emphasis on Aquatic Ecosystems and Fisheries Administrative Session 15th March, 2007, Grand.
Doc.: IEEE /168r0 Submission March 2001 Stephen Berger, TEM Consulting Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES FIRST THINGS FIRST Invitation of a mission Information meeting self-assessment.
Origin of Emission and Susceptibility in ICs
Submitted By: PVS Soumya [2/4] Sai Nandini T [2/4] GNITS GNITS
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
A. Lisowiec 1, A. Nowakowski 1, Z. Kołodziejczyk 1, B. Miedziński 2 1 Centre For Tele-Information Systems and Hardware Applications, Tele and Radio Research.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
The Aspect of RF & EMC in Today’s World National University of Singapore B.Tech (Electronics) EE1001E:Emerging Technology in Electrical Engineering 19.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Pixel Endcap Power Distribution Phase 1 Upgrade Plans Fermilab, University of Mississippi, University of Iowa Lalith Perera University of Mississippi CMS.
Very-Near-Field Solutions to Far-Field EMC Problems EMxpert Pre-Compliance EMC Testing Advanced Embedded Systems September 09, 2015.
F. Arteche EMC issues for Tracker upgrade. 1 de 19 CMS / ATLAS Power working group Paris- France, 23 September 2009 OUTLINE 1. Introduction. 2. EMC strategy.
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
Research activities at ITA for future accelerator M. C. Esteban.
F. Arteche, C.Esteban, (ITA) I.Vila(IFCA) Electronics integration studies for CMS tracker upgrade.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Preliminary conducted noise test results for LV power supplies Bruno Allongue CERN-PH-ESS Fernando Arteche Imperial College – CERN 21 January 2005.
F. Arteche EMC studies for CMS tracker upgrade Status & Plans.
Lecture -5 Events Events are phenomena which only happen every once in a while. An interruption of the supply voltage is the best-known example. This can.
Noise propagation issues in complex power cables for HEP detectors M. Iglesias, I. Echeverria,F. Arteche 12 th Meeting of the Spanish Network for future.
Dr.F. Arteche EMC DEPFET Project: A general overview.
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No Advanced European.
Dr. F.Arteche Instituto Tecnológico de Aragón (ITA) Belle II: Grounding and Electronics Integration Issues.
PXD – DEPFET PS noise emission tests Mateo Iglesias Fernando Arteche.
EMC issues for cabling and racks layout design. (Belle II – Grounding) F.Arteche.
CDIP TRAVEL GRANT PROGRAM CDIP TRAVEL GRANT PROGRAM CDIP Scholar Development - TRAVEL GUIDELINES FOR 2016/2017-
Proposed Amendments to Passenger Related CARs 1. CAR on Refund of Air Tickets 2.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No Advanced European.
Page 1 WP10.2: TA DESY- II Test Beam Facility AIDA-2020 First Annual Meeting Norbert Meyners, Marcel Stanitzki, Natalia Potylitsina-Kube DESY.
EMC review for Belle II (Grounding & shielding plans) PXD system - July 2012 Dr. Fernando Arteche.
Piero Belforte, CSELT 1999: AEI_EMC_, EMC basics by Flavio Maggioni.
Travel Charge Card Training
EUDET Transnational Access: some administrative aspects
IEEE NPEC SC2 Equipment Qualification Electromagnetic Compatibility Compliance Type Test-Design Considerations- Installation and Mitigation Standard/Guidance.
Business Travel What You Need to Know Business Services November 2012
Uppsala Commitment to ESS and FREIA Planning
Accelerator Research and Innovation for European Science and Society
AIDA WP12.2 : Detector Characterization Facilities EMC characterization Fernando Arteche.
Graduate Student Employees’ Union Professional Development Awards (GSEU PDA) Overview and Instructions.
The Best Value in Electronic Test & Measurement
Explanation of the Basic Principles and Goals
CDIP Travel GRANT Program CDIP Scholar Development
Requesting PDP Funds for Travel
TRAVEL TRAINING You may access our travel guidelines and forms by visiting:
Presentation transcript:

ITAINNOVA TA: Scientific & Administrative issues Electromagnetic Compatibility Facility for electronics noise and grounding diagnostics (WP12 – Task 12.2) Dr. Fernando Arteche Advanced European Infrastructures for Detectors at Accelerators AIDA kick-off Meeting 3-5 June 2015, CERN

OUTLINE 1. Introduction 2.Scientific issues – Activities – Equipment – Test goals 3. Administrative issues – Reimbursement policy 4. First EMC TA. 2 / 19 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No

The Instituto Tecnológico de Aragón (ITAINNOVA) is a non- profit public Technology Centre located in Zaragoza (Spain) – Founded 1985 – Facilities m2 1. Introduction 3 / 19 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No ITAINNOVA activities are focused on : – Applied research – Technical development – Technical services Main R&D lines – Material engineering – Industrial systems – Logistics – Multimedia Technologies The number of ITA employees is 220.

1. Introduction One group of ITAINNOVA focused its efforts on electrical engineering aspects for complex systems – Electromagnetic Compatibility issues – Electrical power systems designs Since 2009 this group has been participating in high energy physics (HEP) projects for future colliders – R&D on EMC ( grounding & shielding issues) – R&D on new powering schemes It has been involved in : – CMS upgrade – HL-LHC at CERN – Belle II – SuperB at KEK – ILD - ILC Since 2012 ITAINNOVA became associate member of CMS 4 / 19 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No

2. Scientific issues ITAINNOVA - EMC facilities allow to perform Electromagnetic Compatibility Test. – Non–standard test (Specially focused on HEP) – Standard ( According to European Directive 2004/108/EC) These tests may be used to define in any electronic device installed in HEP experiment: – EM noise emission level (noise emission test) Conducted Radiated – EM noise immunity level (noise injection test) RF conducted and radiated noise Transients test 5 / 19 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No

2.1 Scientific issues: Activities Conducted immunity test – SVD system for Belle II Radiated emission test – Cable radiation of SVD system for Belle II 6 / 19 Big perturbing signal to background noise ratio ( x 100 times) “Electromagnetic clean room” ( below 1 uA)

PS Transient test – SVD for Belle II LV regulator response to voltage dips – HCAL system for CMS Voltage dips & variation of Power mains 2.1 Scientific issues: Activities 7 / 19 Voltage dips & variation of LV lines

It can be used to test small components or units…… 2.1 Scientific issues: Activities 8 / 19 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No FEE unit (readout chips + sensor) FEE boards - hybrids Big power supplies Small DC-DC Hybrids

……….and mid-scale prototypes can be tested too. 2.1 Scientific issues: Activities 9 / 19 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No Belle II –SVD EMC test campaign

The EMC equipment at ITAINNOVA is : – 2 X Semi-anechoic chamber – Faraday cage – Equipment to perform transient tests – Electrostatic discharge (ESD) up to 30 kV – Current probes from 20 Hz up to 400 MHz. – Antennas from DC up to 18 GHz. – RF Generators up to 20 GHz & Amplifiers up to 6 GHz. – Spectrum Analyzers and EMI Receivers from 20 Hz up to 28 GHz – 2 channel oscilloscopes (2 Gs/s). – Shielding effectiveness measurement system (20 MHz – 1 GHz). 2.2 Scientific issues: Equipment 10 / 19 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No

What ´s the purpose of these tests ? What is the information that can be obtained once the data is processed?.... These tests are very good for: – Grounding topologies evaluation Diagnosis – FEE designs Detection of sensitive areas FEE frequency response to noise – Noise distributions – EM mapping Conducted or radiated – Filter designs – Noise emission specification from PS 2.3 Scientific issues: Test goals 11 / 19 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No

Diagnosis & Sensitive areas – CMS- HCAL – Ground connection photodiodes-Board – CMS- Pre-shower - Ground connections between paths – Belle II – SVD - APV25 signature CMS-HCAL CMS-Pre-shower 2.3 Scientific issues: Test goals 12 / 19 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No BelleII-SVD

Conducted noise mapping : Filtering designs Total noise PS noise emissions FEE noise emissions 2.3 Scientific issues: Test goals 13 / 19 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No Belle II –SVD

To quantify the sensitivity of the FEE to noise currents – Ensuring compatibilities among sub-systems – It helps to evaluate and quantify designs 14 de Scientific issues: Test goals 14 / 19 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No

3. Administrative issues ITA offers the possibility to perform any EMC test for a period of 5 weeks per year. Access duration: – Standard access (components) : Less than 1 week – Extended access (large systems) weeks. Users are expected to request the access a few months in advance and to have a technical discussion about its specific needs prior to the access (Follow the official TA procedure) On site review is very recommended - 1 day meeting !!!! Users are expected to be present at ITA during the tests while ITA engineers will operate the testing equipment of the facility – It is possible to ask for a remote access – It is mainly focused on EMC directive tests or PS noise emissions tests. 15 / 19 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No

After the test campaign ITAINNOVA will provide: – A report with the test descriptions and test log – A ftp sever will be created to transfer the data Spectrum profiles Log files and pictures – The analysis of the data is excluded, nevertheless some help in order to analyze the data as well as support to design the test campaign will be provided. The cost of shipping equipment under test will NOT be covered. 3. Administrative issues 16 / 19 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No

Travel expenses for one person to get access to the facility will be covered by AIDA2020 for each project approved. Only economy class air travel and second class train travel will be reimbursed. Car travel will be reimbursed at 0.25 EUR/kilometer up to a maximum of 150 EUR per complete trip. Hotel will be booked and paid directly by ITAINNOVA. User name, passport number as well as arrival and departure dates should be provided in advance. A per diem allowance of 36 EUR/day for each working day will be paid. A ticket for lunches will be provided by ITAINNOVA for each working day. 3.1 Administrative issues: Reimbursement policy 17 / 19 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No

Official taxes will be deducted from the reimbursement based on Spanish regulations All receipts and tickets in original form including boarding cards must be enclosed and returned with the claim. Claims must be made within two months after travel completion. The claim form must be filled in and returned to the ITAINNOVA secretary The time frame for reimbursement is a two-month period. 3.1 Administrative issues: Reimbursement policy 18 / 19 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No

HEPHY institute (from Vienna) has requested an access – Extended access - Full EMC characterization of SVD prototype for Belle II (2 weeks) – Visitors – It is completed – Standard access (3 days) – Conducted noise emissions of DC-DC converters – Remote access – End of June We spent one day in Vienna designing the test campaign – Very useful (a month in advance) The test campaign was very useful - It finished last Monday – 70 GB of data – More than 500 measurements – working hours per day (for two weeks) This is the first time that a HEP detector has been characterized in a semi-anechoic chamber. 4. First EMC TA access 19 / 19 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No