CURRENT STATE NARRATIVE… Knight Management Center Lecture Hall.

Slides:



Advertisements
Similar presentations
BIM Education at Stanford University
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
University ofHouston University of Houston BOARD OF REGENTS MEETING MAY 17, 2007 POSSESSION OF PORTIONS OF CULLEN & HOLMAN.
Bond Program Planning Imperatives Study Session October 12, 2004.
Measure C Board of Trustees Update January 18, 2005.
Lecture 3: Teams John Haymaker, PhD, AIA, LEED ap.
Sustainable Architecture Presented by Caroline Batson Senior Architect and Sustainability Manager.
DESIGN OF HVAC SYSTEMS in the KNIGHT MANAGEMENT CENTER FACULTY OFFICE BUILDING STANFORD UNIVERSITY Min Jae Suh Kawika Nakoa Karthik Jayachandran.
Our Lady of Nazareth Will Celebrate Its 100 th Year Anniversary In th Year Committees Renovation Committee Celebration Committee.
Chapter 9 Integrative Process 1 © 2013 Green Building Academy. All rights reserved.
GREEN DORM Energy Technologies Group 6 Bethany Corcoran Andrew Ehrich Eric Stoutenburg Kimberly Walton.
1 Institutional Support Services Capital Project Process.
Welcome To The College of Environmental Design
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Introduction to Integrated Design of Low-Energy Buildings Professor Svend Svendsen Department of Civil Engineering Technical University of Denmark
21 st Century School Design Building and Designing Schools For Tomorrow’s CMCSS!
Houston Independent School District John F. Kennedy Elementary School PROJECT PROFILE PROJECT HIGHLIGHTS The John F. Kennedy Elementary School is a replacement.
Knight Management Center Lecture Hall GRADUATE SCHOOL of BUSINESS Knight Management Center Lecture Hall – Esther Kweon – Desirae Magallon – – David Park.
From Design to Construction: How to Maintain Control of Your Lighting Design Avraham M. Mor, LEED AP, IESNA, A. IALD Partner, Lightswitch Architectural.
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
Knocking The Rust Off The Rust Belt Calfee, Halter & Griswold LLP, The Calfee Building, 1405 East Sixth Street, Cleveland, Ohio Cleveland | Columbus.
Houston Independent School District Robert L. Frost Elementary School PROJECT PROFILE PROJECT DESCRIPTION Frost Elementary is a new replacement school.
Building Standards for High Performance Buildings High Performance Building Council National Institute of Building Sciences Washington DC.
Bryant School District Bethel Middle School
PROJECT HIGHLIGHTS Energy efficiency is a key feature of the design of Reagan Education Center. The heating, cooling, and electrical lighting systems exceed.
Project Delivery Options in the California Construction Market CSI Fresno Chapter - February 16, 2010 PROJECT DELIVERY OPTIONS in the CALIFORNIA CONSTRUCTION.
Facilities Condition Audit Summary of Findings Entech is a full-service Architectural/Engineering firm providing design, construction management, facilities.
ARCH-4372/6372 Technology in Architecture Spring, 2015.
Realizing Your Organization’s Vision through Integrated Planning “One should expect that the expected can be prevented, but the unexpected should have.
Architectural, Engineering, and Professional Construction Services Consultants Request for Qualifications February 11, 2005.
Entertainment orporation’s Film Studio Development Presented By: Aahlada Chennupati Elissa Flandro Manish Kumar Vasiliki Micha October 22, 2008 Entertainment.
CEE 215 Mid-Term Team: Kevin Chen, Matt Clugston, Preston Taylor, Jesse Santiago 22 October 2008.
Munger Graduate Housing Sivan Cohen, Dimitra Ioannidou, Josh Newland.
Munger Graduate Housing Sivan Cohen, Dimitra Ioannidou, Josh Newland.
Strategic Management of Classroom Environments. The Ohio State University Classroom Management System Classroom Readiness Committee Senior Associate Registrar.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
2 THE BROKER’S ROLE IN SUSTAINABLE COMMERCIAL PROPERTY.
Green Dorm Group 6 Bethany Corcoran Andrew Ehrich Eric Stoutenburg Kimberly Walton.
EDUCATION MARKET. Consumers The U.S. equals 3% of the earth’s population. The U.S. consumes 40% of the earth’s energy. The U.S. draws 340 billion gallons.
ARCH-4350/6350 Environmental Controls I/IG Fall, 2009 Lecture: MW 8:10-9:10 AM Recitation: T 2:00-5:00 PM.
Choosing Atrium Lighting In the new Graduate School of Business Knight Management Center Group 10 Rachel Martin David Mount Leah Strickman Emma Wendt.
Calle Real Campus Design Guidelines. Five-Step Process 1999 Board Direction, create a five phase process--- –Phase 1: Determine Space Needs –Phase 2:
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
Self-Directed Energy Contracting Saving Your Buildings and Your Money.
UF-SNRE Program in Land Use Dynamics A new synthesis of disciplines for the delivery of science for a sustainable future.
Green Dorm. WATER SYSTEMS TEAMSPACE SYSTEMS TEAM Ryan W. Ryan S. Nick Jack JamesStephanie Eric.
Chapter 8 - Integrative Process
ARCH-4372/6372 Technology in Architecture Spring, 2016.
Civic Center/City Hall Public Information Meeting March 20, 2007.
The importance of process in high performance building design.
A Collaborative Blueprint for Classroom Design Barbara Brandt, ITD Carole Meyers, Emory College Emory University Copyright Barbara Brandt and Carole Meyers.
Choosing Atrium Lighting In the new Graduate School of Business Knight Management Center Group 10 Rachel Martin David Mount Leah Strickman Emma Wendt.
DESIGN OF HVAC SYSTEMS in the KNIGHT MANAGEMENT CENTER, STANFORD UNIVERSITY Min Jae Suh Kawika Nakoa Karthik Jayachandran.
High Performance? “Greening” “Energy Efficient”
HVAC Systems Faculty Office Building, KMC
Community Meeting, July 18, 2016 Update Designs and Phasing
Fun Facts: James M. Bennett High School
Group 10 Rachel Martin David Mount Leah Strickman Emma Wendt
Profession Practices (ECIV-5105)
Standing Offers Discipline
David Anderson Mechanical Option
Measure N Modernization
Floor Finish Decisions
GREEN DORM Group 6 Bethany Corcoran Andrew Ehrich Eric Stoutenburg
CAPITAL PROGRAM OVERVIEW
How to Build a Great Team
Gabe Dietz Rian Johnson Samir Mikati
Environmental Controls I/IG
Ralph R. Alster, Architect
Environmental Controls
Presentation transcript:

CURRENT STATE NARRATIVE… Knight Management Center Lecture Hall

STAKEHOLDERS GSB Representative: Kathleen Cavanaugh -Faculty & Staff -GSB Students Capital Planning and Mgmt.: Tom Bauer - General Stanford Population GSB IT/Audio Visual Team Facilities Management DESIGNERS Architect: Boora Architects - Arup -Structural -Mechanical -Electrical -Plumbing -Acoustics -Fire/Code -Sustainability Consultant -LEED Consultant -Interior Designer -Landscape Architect -Geotechnical Consultant -Parking Consultant -Accessibility Consultant -Civil Engineer GATEKEEPERS Fire Inspector Structural Reviewer DECISION MAKERS GSB Representative: Kathleen Cavanaugh Architect: Boora Architects Capital Planning and Mgmt.: Tom Bauer Knight Management Center Lecture Hall Project TEAMS…

Project Teams Knight Management Center Lecture Hall Stanford Project Management GSB Architect Boora AruptStructuralMechanicalElectricalPlumbingAcousticsFire/Code LEED Consultant Interior Designer Landscape Architect Geotechnical Consultant Parking consultant Accessibility consultant CM+GC Tuner construction Design build subcontractors Subcontractors

Knight Management Center Lecture Hall General Stanford Population Facilities Management Accessibility Consultant Parking Consultant Geotechnical Consultant Landscape Architect Interior Designer Arup CM/GC Tuner CM/GC Tuner Architect BOORA Architect BOORA Office of Land, Buildings and real Estate GSB Administration GSB Administration Sub Contractors Design-Build Sub contractors LEED Consultant Sustainability Consultant Sustainability Consultant Fire/Code Acoustics Plumbing Electrical Mechanical Structural Owner Architecture & Contractor Consultant & SC GSB Representative Stanford CPM Stanford CPM GSB IT/Audio Visual Team GSB Student Faculty & Staff Structural Reviewer Fire Inspector Stakeholders Gatekeepers Interior Designer Arup GSB Alumni Asso. Santa Clara county Office of Registrar Stanford Law School Board of Trustees University Provost University Architect

Economic Goals Within Budget Energy Efficient Meet Programming Needs Maintain Stanford Architectural Theme Stay on schedule Low lifecycle cost Environmental Goals Energy Efficient Good Daylighting Facility Performance Goals Top of the line Facility Good Daylighting Eliminate Outside Sound Conceal Trash Compactor Traffic Control Good Teaching/Performance Space Ergonomic Ease of IT use Multi-use Facility Thermal Comfort Texturize Space Sound Waves In Phase Structure Performance Goals Structurally Sound Energy Efficient Code Compliant Knight Management Center Lecture Hall Project GOALS…

Knight Management Center Lecture Hall Project GOALS… Within Budget Energy Efficiency Low like Cycle Cost Good Day Lighting Good teaching space Thermal Comfort Ease of IT Use Good Acoustics Replace Kresge Auditorium Owner Meet Programming Needs Structurally Sound Control Noise Transfer from Outside High interior aesthetic appeal Architect Stay on Schedule Contractor Maintain Stanford Architectural Aesthetic Stakeholders Operable post-seismic Appeal Gate keeper

GOALS METRICS Maximize Daylighting 80% lighting needs during day met by natural daylight ~ (+3) 40% lighting needs during day met by natural daylight ~ (0) 0% lighting needs during day met by natural daylight ~ (-3) Maximize Space Functionality Ergonomic seating, excellent visibility for all audience members, audio quality for speaking and music ~ (+3) Adequate seating, visibility limited to front section, basic ability to hear speaker ~ (0) Highly uncomfortable seating, poor visibility from all sections, hot and cold spots for >20% audience ~ (-3) Stay Within Budget Primary GOALS & METRICS… Building is designed and constructed for less than initial budget ~ (+3) Building is designed and constructed exactly at budget ~ (0) Building is designed and constructed for more than 1.5 times initial budget ~ (-3) Knight Management Center Lecture Hall

Future State Narrative… Knight Management Center Lecture Hall

Z goals set (10 point weight) = 100 possible project points (10 point weight) = 100 possible project points X goals set (60 point weight) Y goals set (30 point weight) Current MACDADI: Designers & Stakeholders DEFINE Goals Knight Management Center Lecture Hall ArchitectContractorCP & MGSB PrestigeProfitPracticalityPerformance INNOVATION: Designers & Stakeholders DEFINE Preferences Problem: CONFLICTING Goals NEEDS WANTS = design option points # points received* ( Level 3) + # points received* (Level 2) + # points received* (Level 1) ~ for each design option… (# goals met * point weight) # goals set = # points received *Point Equation: (per level) THE SACRED COW Level 1 (non-negotiable goal) Level 2 Level 3 THE SACRED COW (non-negotiable goal) THE SACRED COW (non-negotiable goal) THE SACRED COW (non-negotiable goal) THE SACRED COW (non-negotiable goal) IDEALLY: Design Option w/ Most Points = Best Design Option