1 NASA News New Administrator: Dr. Michael Griffin.

Slides:



Advertisements
Similar presentations
2013 Key Issues Review: Enabling Sustained Deep Space Exploration with a Broad Vision Congressional Visits Day Preparatory Briefing Teleconferences February.
Advertisements

Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
1 Review of US Human Space Flight Plans Committee Evaluation Measures and Criteria for Humans Spaceflight Options 12 August 2009.
1 Architecture and Planning Strategies for Addressing Radiation, Space Weather, and Space Climatology Impact on NASA Missions Study Sponsor - NASA Office.
1 Astronomy and Astrophysics Advisory Committee Astrophysics Division FY2008 Budget February 8, 2007 Rick Howard Astrophysics Division Director (acting)
PCOS Program Office Mission Studies and Technology Development Jackie Townsend Advanced Concepts and Technology Office PCOS and COR Program Offices
1 Briefing to the CAA on the Terrestrial Planet Finder (TPF): Finding and Characterizing Earth-like Planets Zlatan Tsvetanov, NASA Program Scientist Charles.
NASA Living with a Star Program Targeted Research & Technology Steering Committee NASA HQ & LWS TR&T Update September 16, 2008 Doug Rowland On Detail to.
High Energy Education and Public Outreach Lynn Cominsky Now in Schulz – 3 rd Floor ( )
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
NASA_G_O_02_09_05.ppt 1 National Goals and Objectives National Goal To advance U.S. scientific, security, and economic interests through a robust space.
1 NASA Agency Overview NASA’s Vision and Fundamental Physics in Space Paul Hertz Chief Scientist, Science Mission Directorate NASA International Workshop.
Eduardo do Couto e Silva - ATC/LM Colloquium, June How many neutralinos are there? Expansion of universe Depletion of neutralinos Creation of neutralinos.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
Fundamental Physics and the Decadal Survey Quantum to Cosmos 3 Airlie, VA 7 July 2008 Michael Salamon NASA HQ/Astrophysics Div.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
The James Webb Space Telescope. Introduction The James Webb Space Telescope  The James Webb Space Telescope, also called Webb or JWST, is a large, space-based.
Introduction of Space Technology. The James Webb Space Telescope The James Webb Space Telescope was previously known as the Next Generation Space Telescope.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Universe Division Update Presentation to the Astronomy and Astrophysics Advisory Committee Michael Salamon Universe Division, Science Mission Directorate.
Mars Program Update James L. Green Acting Director, Mars Exploration Program NASA Headquarters May 13, 2014 NOTE ADDED BY JPL WEBMASTER: This content has.
NASA Fiscal Year 2016 Budget 9 April NASA Budget for 2016 In a presentation at the Kennedy Space Center in Florida, NASA Administrator Charlie.
1 Astronomy & Physics Division ASTRONOMY & PHYSICS DIVISION STATUS & PLANNING PHILIPPE CRANE Origins Theme Scientist Baltimore, Md. February 26, 2004.
Comprehend the Historical Benefits of Exploration Comprehend the US Strategic Plan to Explore Space Comprehend the Current Costs of Exploring Space Comprehend.
The Big Bang and The Expanding Universe Dr. Michael J Passow.
OSIRIS-REx Asteroid Sample Return (NASA New Frontiers Program)
Space Exploration- Tools
NASA Update to the AAAC, Part 1: JDEM Concept Studies NRC’s Beyond Einstein Study SMD Science Plan Update Astronomy and Astrophysics Advisory Committee.
May 11, Astronomy and Astrophysics Advisory Committee Astrophysics Division and Update May 11, 2006 Rick Howard Astrophysics Division Director (Acting)
Cutting the space shuttle budget: an end to an era Chelsea Pence.
NASA Goddard The Universe Beyond the Solar System… Anita Krishnamurthi Education and Public Outreach Lead.
Key Ideas Describe characteristics of the universe in terms of time, distance, and organization. Identify the visible and nonvisible parts of the electromagnetic.
Nobel Prize in Physics: Riccardo Giacconi. Short Bio Born in Italy, Riccardo Giacconi earned his Ph.D. in cosmic ray physics at the University of Milan.
Physics of the Cosmos Program Analysis Group John Nousek Penn State University International Workshop on Astronomical X–Ray Optics Prague, Czech Republic.
Mars in the Planetary Decadal Survey Steve Squyres Cornell University Chairman, Planetary Science Decadal Survey Steve Squyres Cornell University Chairman,
1 NASA In Transition Presented to the Aerospace Control and Guidance Systems Committee Meeting No. 96 Harbour Town Resort Hilton Head, SC October 19, 2005.
National Aeronautics and Space Administration November 23, Gamma-ray Large Area Space Telescope (GLAST) Kevin Grady, Project Manager Steven Ritz,
1. G O D D A R D S P A C E F L I G H T C E N T E R 2 New Budget Initiatives for NASA in FY04.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
Seeing the First Light The James Webb Space Telescope Amber N. Straughn Lead Scientist for JWST E/PO Paul Geithner JWST Observatory Manager jwst.nasa.gov.
ANN HORNSCHEMEIER Chief Scientist, Physics of the Cosmos Program NASA Goddard Space Flight Center.
Structure Formation in the Universe Concentrate on: the origin of structure in the Universe How do we make progress?How do we make progress? What are the.
1 Douglas Hudgins Exoplanet Exploration Program Scientist Presentation to ExoPAG#8, Denver Colorado October 5, 2013.
National Aeronautics and Space Administration Marshall Space Flight Center Launching the Future of Exploration and Science Robert Lightfoot.
LISA News from ESA O. Jennrich LISA Project Scientist.
Cutting the Space Program By: Aubree Orton. Money that is spent Focus on problems on Earth The risk of human life No major scientific breakthroughs have.
The Search for Black Holes
NASA’s FY 2007 Budget Outlook February 23, 2006 | AIAA National Capital Section Brian Chase, Assistant Administrator for Legislative Affairs.
CSRP NASA Workshop NASA’s Revised Budget. CSRP NASA Workshop NASA’s New Vision and Objectives (as of January 14, 2004)  VISION  The fundamental goal.
Satellites, Telescopes, Probes and Rovers
Dr. Jon Morse Astrophysics Division Director Science Mission Directorate NASA Headquarters February 11, 2008 Astronomy and Astrophysics Advisory Committee.
March 2004 At A Glance Advanced Mission Design (AMD) researches and develops innovative trajectories and the mathematical methods used for optimal designs.
The Search for Black Holes
G O D D A R D S P A C E F L I G H T C E N T E R 1 Status of LISA Jordan Camp LISA Deputy Project Scientist NASA / Goddard Space Flight Center Jan. 19,
Demonstrating Success: NASA Performance and Results Mike A. McNeill Environmental Management Division NASA Headquarters.
LISA Laser Interferometer Space Antenna: The Mission Mike Cruise For the LISA Team.
& Eric P. Smith HST/JWST Program Scientist Astrophysics Division NASA Headquarters.
Know how NASA plans and implements space missions Comprehend the essential components of a space mission Comprehend the selection and training of astronauts.
National Goals and Objectives
Unmanned Space Probes.
02/04/17 1.
The Universe and Electromagnetic Spectrum
GLAST Large Area Telescope:
SLAC – KIPAC GLAST Physics Elliott Bloom, Roger Blandford Co-Chairs, KIPAC GLAST Physics Department Stanford University SLAC DoE Review June 5-8, 2006.
March ’05 Face to Face Meeting Introduction
Overview Cost to Complete
Visions and Voyages: The Planetary Decadal Survey
NASA Budget & the Political Process
Presentation transcript:

1 NASA News New Administrator: Dr. Michael Griffin

2 NASA Town Meeting 206th American Astronomical Society Meeting Minneapolis, MN May 31, 2005 Agenda Welcome and Announcements Universe Division Highlights -- Dr. Jennifer Wiseman, Program Scientist NASA and the Science Mission Directorate -- Dr. Paul Hertz, Assistant Associate Administrator for Science

3 Universe Division Key Issues HST optimization: Extend operating life of HST Optimize science program HST SM4 with deorbit module included SOFIA flight operations beginning GLAST potential delay due to tower production rate JWST Cost Growth SIM, TPF funding

4 Universe Division Future Activities Comparative Review of the Science Centers SOFIA Engineering Flights (Nov 05) Strategic Planning Conclusion and completion of Universe Division Roadmap Nat’l Academy Review of Roadmap JWST Level 1 Review Deep Impact mission to impact Comet Tempel 1 on July 4th -- HST will track!

5 Division Personnel Changes Leaving: Phil Crane, Dartmouth Lou Kaluzienski (1 year detail to GSFC) Paul Hertz, SMD AAA for Science Carl Pilcher, Solar System Division; Senior E/PO Official for Science Mission Directorate Don Kniffen, GSFC Michael Salamon (3 year detail to OSTP) Joining: Steve Ridgway, from NOAO Pamela Marcum, from TCU Ron Helling, from Montana U Wilton Sanders, from Wisconsin Rick Harnden, from SAO

6 Challenges for NASA Astronomy Challenges to the NASA Science Budget and the Universe Division Budget Return to Flight Congressionally Directed Funding Hubble Space Telescope Extend operating life of HST Optimize science program SM-4 with deorbit module included Near Term Launches SOFIA flight operations beginning GLAST potential delay due to tower production rate James Webb Space Telescope cost growth SIM, TPF funding LISA, Con-X funding

7 NASA Budget and Plans NASA Budget The President has reaffirmed his commitment to NASA … the $16.46B requested for NASA in FY 2006 reflects an increase of 2.4% over FY 2005 By FY 2010, the NASA Science budget will increase by 23% over current levels Several missions will have to be “delayed, deferred, or cancelled” in order to pay for the missions where the priorities were set by the President and Congress FY 2005 Congressional “earmarks” to NASA total $426M; Space Science budget reduced by $76M, Earth Science by $89M to support these Does not include Congressional direction for spending $291M on Hubble servicing in FY

8 The Decade of Discovery (1991) Spitzer FUSE  SOFIA (2006) Delta-class Explorers  Astrometric Interferometry Mission aka SIM (2012)  International collaboration in space instruments (e.g., Herschel, Planck) (2007)  Small Explorer Acceleration  Orbiting Planetary Telescope  RadioAstron (cancelled) Laboratory Astrophysics Astronomy & Astrophysics in the New Millennium (2001)  JWST (2011)  Con-X (c. 2016)  TPF (c. 2015)  SAFIR (c. 2025)  GLAST (2007)  LISA (2013)  EXIST (no projected launch date)  ARISE (no projected launch date)  ACCESS (no projected launch date) NVO Augmentation of Theory  HST SM4 (pending successful RTF) Decadal Report Scorecard

9 President’s FY06 Budget ($ in Millions) FY 2006FY2007FY2008FY2009FY2010 SCIENCE5,4765,9606,5036,8536,798 EXPLORATION SYSTEMS3,1653,7073,8264,4745,125 AERONAUTICS RESEARCH SPACE OPERATIONS6,7636,3796,0575,3675,194 SCIENCE Supports 55 missions in orbit, 26 in development, and 34 in design phase Includes $858m, a 17% increase, for Mars/Lunar robotic exploration EXPLORATION SYSTEMS $753m for the Crew Exploration Vehicle, with resources to pursue a timely flight demo in 2008 $919m, a 27% increase, for Exploration Systems R&T that will enable designs for sustainable exploration SPACE OPERATIONS $4.5b to return Shuttle to flight as a top priority and resume flight operations $1. 9 billion for the Space Station to examine configurations that meet the needs of both the Space Exploration Vision and our international partners while using as few Shuttle flights as possible to complete Station assembly AERONAUTICS Maintains top priorities in aeronautics research $193m, a 4% increase, for Aviation Safety & Security $200m, a 32% increase, for Airspace Systems

10 HST CXO SST R&A R&A plus GO Funding

Universe Exploration Mission Set 1.Strategic Observatories providing breakthrough capabilities –GLAST (2007): Jets from Black Holes and Dark Matter decay signatures –JWST (2011): First Galaxies and stars –LISA (2014): Gravitational Waves from many sources, how space and time behave around black holes and constrain Dark Energy –Constellation-X (2017): Observe matter falling into Black Holes & address the mysteries of Dark Matter and Dark Energy 2.Competed Missions that address focused science questions through scientist-led investigations with a range of sizes, up to a strict cost cap of $600M –Explorers: Missions linked to Universe strategic goals –Einstein Probe: Joint Dark Energy Mission (JDEM) –Einstein Probe: Black Hole Finder Probe (BHFP) –Einstein Probe: Inflation Probe (IP) 3.Vision Missions that result from long term objectives –Big Bang Observer (BBO) –Black Hole Imager (BHI) –Pathways to Life Observatories Red – Beyond Einstein Blue – Pathways to Life

12 Roadmapping and Strategic Planning

13 Roadmapping Rules Any player may declare a new rule at any point in the game (see Figure 1.2). The player may do this audibly or silently depending on what zone the player is in. Roadmapping!

14

GLAST Independent Review Team Report Presentation to Science Management Directorate Program Management Council May 16, 2005 Art Fuchs, Chairman

16 GLAST IRT Review Schedule NAR ConfirmationDecember 3, 2003 GLAST Spacecraft CDRMay 24-27, 2004 GLAST Mission CDRSeptember 21-22, 2004 Goddard Management MCDR Review November 29, 2004 NASA Science Directorate Rebaseline ReviewMay 16, 2005

17 Summary from MCDR – Fall, 2004 The GLAST Project has made excellent progress since the PDR/NAR and has completed an excellent CDR. The LAT instrument remains the most significant challenge to cost, schedule and mission success. The IRT has identified a number of issues to the GLAST Program that should be addressed. It is the IRT’s opinion that the GLAST Program has conducted a successful CDR

18 IRT Findings on Rebaseline Package – Page 1 Project Management is of high quality and they are on top of the issues The potential for LAT production problems was forecasted by the review team at the MCDR The IRT was not requested to investigate the potential cost growth or schedule effects The IRT cautioned the Project on flight production problems, although specific problems, e.g. MCM delamination could not be predicted At this point the KNOWN problems either have been or are being addressed. There are likely to be some problems that are unknown at this point, but they should not be big money problems The problems that occurred, cost more to address than would have been expected at the MCDR A more detailed risk assessment and identification of threats against LAT contingency could have provided earlier warning of the problems

19 IRT Findings on Rebaseline Package – Page 2 Some key risks are not identified on the liens list and are not even quantified as threats Examples are Quicknuts, Solar arrays There is 13.7% contingency through liens Other potential threats are numerous: e.g. LAT parts failures, environmental failures, instrument parts; thermal, software, mechanical interference, noise, ASIC programming problems, etc. S/C – Instrument I/F problems require rework, software incompatibilities, end-to- end testing problems Would the amount of contingency cover the highly probable threats? A comprehensive risk assessment of each remaining activity is in order It is strongly advised that the Project pursue workarounds such that the planned LAT test program is maintained The LAT environmental test program be impacted only as a last resort

20 GLAST Significant Accomplishments & Issues Significant Accomplishments (as presented at recent GSFC MSR): Large Area Telescope (LAT) Successfully collecting two-tower cosmic particle data on LAT. All 18 calorimeters completed environmental test. Continue to successfully produce flight tracker multi-chip modules at Teledyne. Delivered 4 th and 5 th flight trackers to Stanford. 6 th and 7 th trackers preparing for environmental test. Nearing completion of electronics and tile integration onto ACD. GLAST Burst Monitor (GBM) GBM qual units delivered by DJO to MPE for calibration testing. Spacecraft –Spacecraft structure qualification complete. –Installed harness on spacecraft. Project –Rebaselined GLAST cost and schedule on 5/16/05.

21 GLAST Problem and Concern Status ISSUE None