1.Status update from May 2011  FADC250 and Trigger modules  Two crate testing success 2.Schedule  How about those requirements?  What’s happened since.

Slides:



Advertisements
Similar presentations
A 250 MHz Level 1 Trigger and Distribution System for the GlueX Experiment David Abbott, C. Cuevas, E. Jastrzembski, F. Barbosa, B. Raydo, H. Dong, J.
Advertisements

JLab High Resolution TDC Hall D Electronics Review (7/03) - Ed Jastrzembski.
GlueX Collaboration Meeting June 3-5, GeV Trigger Electronics R. Chris Cuevas 1.Hardware Status  Production Updates 2.DAq and Trigger Testing 
Level-1 Trigger Commissioning H.Dong, A.Somov Jefferson Lab Trigger Workshop, Jul 8, 2010.
GlueX Collaboration Meeting October 2-4, 2014 Trigger System Update R. Chris Cuevas Trigger Hardware/Firmware Status  Hardware Status  Performance Test.
Integrated Tests of a High Speed VXS Switch Card and 250 MSPS Flash ADC Hai Dong, Chris Cuevas, Doug Curry, Ed Jastrzembski, Fernando Barbosa, Jeff Wilson,
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
GlueX Collaboration Meeting May 12-14, GeV Trigger Electronics R. Chris Cuevas Trigger Hardware/Firmware Status  Global Trigger  Installation.
GlueX Collaboration Oct '06 C. Cuevas 1 Topics: Projects and Progress 250Msps Flash ADC Energy Sum Module The Bigger Picture DAQ/Electronics Work Plans.
 Brief status update of DAQ/Trigger production hardware  Firmware development for HPS application  CLAS12 CTP ‘upgrade’ notes  Summary Status of the.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
The GANDALF Multi-Channel Time-to-Digital Converter (TDC)  GANDALF module  TDC concepts  TDC implementation in the FPGA  measurements.
Prototype of the Global Trigger Processor GlueX Collaboration 22 May 2012 Scott Kaneta Fast Electronics Group.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
GlueX Collaboration Meeting February , GeV Trigger Electronics R. Chris Cuevas Hardware Status ( A top down view,, )  Global Trigger Processing.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
GlueX Collaboration Meeting February , GeV Trigger Electronics R. Chris Cuevas 1.Hardware Design Status Updates  Production News  Status.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
Understanding Data Acquisition System for N- XYTER.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
GlueX Collaboration Meeting 12GeV Trigger Electronics October 4 - 6, 2012 R. Chris Cuevas 1.Hardware Design Status Updates  Production News  Acceptance.
Data Acquisition for the 12 GeV Upgrade CODA 3. The good news…  There is a group dedicated to development and support of data acquisition at Jefferson.
Hall D Level 1 Trigger Dave Doughty 1/10/2008 Hall D Collaboration Meeting.
David Abbott - JLAB DAQ group Embedded-Linux Readout Controllers (Hardware Evaluation)
1 Trigger and DAQ for SoLID SIDIS Programs Yi Qiang Jefferson Lab for SoLID-SIDIS Collaboration Meeting 3/25/2011.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Trigger Interface and Distribution J. William Gu Jefferson Lab 1. What is TID 2. TID Structure and functions 3. Possible usage in the system 4. TID related.
HPS ECal Trigger Status Scott Kaneta Fast Electronics Group – Jefferson Lab June 5, 2013.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
GlueX Collaboration Meeting 12GeV Trigger Electronics 10 May 2010 R. Chris Cuevas 1.FY10 Project Goals  Update from January 2010 Collaboration Meeting.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Hall D Online Meeting 9 August 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division Mission Who’s Who.
1 April 2009 NA62 DAQ meeting1 LKr calorimeter readout project H.Boterenbrood, A.Ceccucci, B.Hallgren, M.Piccini, H. Wendler.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
GTP Update 3 March Cuevas. CPUPP17PP15PP13PP11PP09PP07PP05PP03PP01SWASWBPP02PP04PP06PP08PP10PP12PP14PP16PP18 64x***SSP GTPA GTPB SSP TI DP1LVPECL.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Hall–D Level-1 Trigger Commissioning Part II A.Somov, H.Dong Jefferson Lab 12 GeV Trigger Workshop, July 8, 2010  Play Back Test Vector in Hall-D commissioning.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
DAQ Selection Discussion DAQ Subgroup Phone Conference Christopher Crawford
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
A 250 MHz Level 1 Trigger and Distribution System for the GlueX Experiment David Abbott, C. Cuevas, E. Jastrzembski, F. Barbosa, B. Raydo, H. Dong, J.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Fast Electronics Group Experimental Nuclear Physics Division
B. Raydo, C. Cuevas, D. Abbott, B. Moffit, J. Wilson, S. Boiarinov
Counting Mode DAQ for Compton
CMS EMU TRIGGER ELECTRONICS
JLAB Front-end and Trigger Electronics
Front-end electronic system for large area photomultipliers readout
New Pipeline DAQ and 12GeV Trigger Systems
Example of DAQ Trigger issues for the SoLID experiment
HallD Collaboration Meeting Jefferson Lab December 11-13, 2003
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

1.Status update from May 2011  FADC250 and Trigger modules  Two crate testing success 2.Schedule  How about those requirements?  What’s happened since May-11?  Nov-11 test activities  Update firmware for Spring 2012 requirements 3.Summary Status of FADC250s and Trigger Modules Heavy Photon Search Collaboration Meeting 18 October 2011 R. Chris Cuevas

 Flash ADC 250Msps ( FADC250 ) 40 Pre-production units received and tested Automatic board level verification test station is complete. CODA library ‘driver’ complete and is used in two crate DAq test station Crate Trigger Processor ( CTP ) We have 4 fully functional CTP modules 2 latest CTPs include FPGA that support higher Gigabit speed (5Gbp/s) A new CTP was used for verification of new WIENER VXS backplane FADC250-V2 Gigabit outputs verified with per lane! Sixteen FADC250 boards successfully tested in full crate! - Final test with two crate system imminent Transports trigger data over fiber to Global Trigger crate (SSP) 2 Trigger Hardware Status

 16 Channel, 12-bit  4ns continuous sampling  Input Ranges: 0.5V, 1.0V, 2.0V (user selectable via jumpers)  Bipolar input, Full Offset Adj.  Intrinsic resolution – σ = 1.15 LSB.  2eSST VME64x readout  Several modes for readout data format  Raw data  Pulse sum mode (Charge)  TDC algorithm for timing on LE  Multi-Gigabit serial data transport of trigger information through VXS fabric  On board trigger features  Channel summing  Channel coincidence, Hit counters  Automatic Test Station is complete  Engineering Run – 40 Delivered!  18 Hall D  17 Hall B  Production Procurement FY12 (>$2M) Boards for all Halls Flash ADC 250MHz Fast Electronics DAQ Groups 23-Sept

CTP Includes 3 Xilinx VirtexV FX70T that support 5Gbp/s Crate Trigger Processor computes a crate-level energy sum (or hit pattern) Computed crate-level value sent via 10Gbps fiber optics to Global Trigger Crate (32bits every 4ns) MTP Parallel Optics 10Gb/s to SSP VXS Connectors Collect serial data from 16 FADC-250 Fully populated front end crate for readout of 12GeV detector signals 256 coaxial input ‘channels’ VXS serial fabric is used to transfer trigger information forward to Global Trigger system. 4 Crate Trigger Processor H. Dong J. Wilson 4

Trigger Interface – Trigger Distribution ( TI - TD ) FY11 test goals have been achieved 10 pre-production units have been fabricated, assembled and tested Final production quantities as follows: -- Hall D: 56 units -- Other Halls: 35+ units Peripheral modules used with TI have been completed. (i.e. Fan-out board for CAEN V1290 TDC) CODA library has been updated for latest TI-D revision. Successful test verification in two crate test stand Procedure to align (de-skew fiber optic length differences) has been completed and verified with two crates in the lab. Trigger Hardware Status 5

Trigger Hardware Status - TI  Direct link to Trigger Supervisor crate via parallel fiber optic cable  Receives precision clock, triggers and sync from TD  Connects directly to SD on VXS backplane  Board design supports both TI and TD functions, plus can supervise up to eight front end crates.  Manages crate triggers and ReadOut Controller events Trigger Interface “Payload Port 18” ‘Legacy’ Trigger Supervisor Interface External I/O (trg, clk…) Xilinx VirtexV LX30T-FG665 TI Mode One Optical Transceiver HFBR-7924 W. Gu DAQ Group 23-Sept-2011 VXS P0 TD mode: from SD TI/TS mode: to SD 6

Trigger Hardware Status - TD  Distributes from Trigger Supervisor crate to front end crates (TI)  Distributes precision clock, triggers, and sync to crate TI modules  Board design supports both TI and TD functions, plus can supervise up to eight front end crates.  Manages crate triggers and ReadOut Controller events Trigger Interface “Payload Port 18” ‘Legacy’ Trigger Supervisor Interface External I/O (trg, clk…) Xilinx VirtexV LX30T-FG665 TD Mode Eight (8) Optical Transceiver HFBR-7924 W. Gu DAQ Group 23-Sept-2011 VXS P0 TD mode: from SD TI/TS mode: to SD 7

Signal Distribution ( SD ) 6 Pre-production boards have been manufactured, assembled and passed acceptance testing. SD provides precision low jitter fan-out of 250MHz system clock, trigger and synch signals over VXS backplane to VXS payload modules Latest SD version includes clock jitter attenuation PLL 2 pre-production boards are installed and running in the two crate test station  Production procurement has been moved to FY12  Quantity of 80 SD boards for all Halls 8 Trigger Hardware Status

N. Nganga 23-Sept Crate Level – Signal Distribution (SD) Altera FPGA Cyclone III VXS Switch Module Jitter attenuation circuitry has achieved ~1.5ps rms measured at FADC250 module All SD functions have been tested -Synchronization -Token Passing -Busy signal management SD boards have been used in the two-crate tests since the beginning of Summer 2011 without glitches. PCB manufacture and Board assembly was ~$1000 per board SD components are estimated at $1200 per board (price break dependent). VITA 41 Switch Slot Connectors

SubSystem Processor ( SSP ) Prototype board has been tested and is ahead of schedule. New applications have been proposed for the SSP (CLAS12) SSP is in use for two crate DAq testing Firmware to handle trigger information from two CTP streams is complete SSP will collect trigger data from the two full crates and deliver the final trigger signal to the Trigger Interface. SSP to GTP serial link definitions have been fully specified and implemented for VXS Initial testing of SSP (Xilinx) => GTP (Altera) Gigabit transceivers is successful  Manages trigger information from up to 8 front end crates. (2048 channels!)  Trigger data received on front panel with fiber transceivers  10Gbp/s input capability ( 4 )  10Gpb/s output stream to GTP on VXS backplane 10 Trigger Hardware Status

Sub-System Processor VME64x (2eSST support) VXS-P0 (up to 16Gb/s to each GTP) Optional DDR2 Memory Module (up to 4GByte) 8x Fiber Ports --10Gb/s each from CTP ) Collects Trigger Information from 8 Front End Crates 2x NIM (bidirectional) 4x ECL/PECL/LVDS In 4x LVDS Out Ben Raydo 9-Sept

Global Trigger Processor ( GTP ) (FY – 11/12) 1 st Article GTP module has been fabricated, assembled and received The initial acceptance test plan is presently being executed and further testing will be completed soon. Interface requirements to SSP and TS have been finalized The GTP transceivers (Altera) have been tested with the SSP transceivers (Xilinx) over the VXS backplane without problems Significant amount of firmware development and verification activity remains:  Ethernet interface  Implementation of final Physics Trigger equations  Full test of Global Trigger Crate planned for last quarter of FY12 12 Trigger Hardware Status

GLOBAL TRIGGER PROCESSOR 1 st Article Board 4 Channel Fiber RJ45 Ethernet Jack 4x 8-Channel LVPECL Trigger Outputs to TS Altera FPGA Stratix IV GX DDR2 Memory 256 MB Gigabit Links to SSP VXS “Switch” card S. Kaneta

14 Trigger Hardware Status Trigger Supervisor ( TS ) (FY-11/12 activity) William Gu has completed the schematic and board layout Design review planned before 1 st article order Order is scheduled for first quarter of FY12 Test plans include functional hardware verification with TD and GTP modules  New board format from legacy era – VXS Payload module  Distributes precision clock, triggers, and sync to front end crates via the Trigger Distribution modules.  Manages global triggers and ReadOut Controller events  Global Trigger Processor drives 32 bit trigger word to TS over copper cables.  Specification has been updated to match GTP output

150m fiber through MTP patch panel 50m fiber through MTP patch panel CODA “DSC8 ” “DSC9 ” Two DAQ Crate Testing: FY11 Dell 2GHz Xeon Dual core 1U Network Switch Ethernet Two crate Trigger Signal From SSP to TI(TS) 22 15

Two DAQ Crate Testing: FY11 200KHz Trigger Rate! Pre-Production and 1 st article boards have been received and tested Significant effort for circuit board fabrication, assembly and acceptance testing System testing includes: Gigabit serial data alignment 4Gb/s from each slot 64Gb/s to switch slot Crate sum to Global Low jitter clock, synchronization ~1.5ps clock jitter at crate level 4ns Synchronization Trigger rate testing Readout Data rate testing Bit-Error-Rate testing - Need long term test ( hrs) Overall Trigger Signal Latency ~ 2.3us (Without GTP and TS) Readout Controller Capable of 110MB/s - Testing shows we are well within limits 16

Discussions at the May 2011 meeting,, Define requirements for readout electronics and trigger hardware - Expected signal rates - Has this been determined from simulation for the Spring 2012 test? - Expected signal amplitudes/pulse widths – I believe we have what we need for this. - Expected trigger rates – In Spring 2012, presumably CLAS rates will be used, correct? - Calorimeter APD channels only? Or are there Hodoscope channels? - We have 256 channels for the Nov-2011 test, so signal selection is up to the collaboration. - Channel sum resolution  6 bits proposed. Is this acceptable? - We can use the Crate Trigger Processor (Energy Sum) output as part of the trigger for the upcoming Nov-11 test. -The firmware development has not started for the scheme proposed at May-11 collaboration meeting 17

Xilinx FPGA Trigger Function Pre-Processing To Crate Trigger Processor (VXS Switch Card) APD Signals Flash ADC Implementation Cluster Finding with Energy Resolution/Channel [May 2011] 12 Bits CH-1 CH-16 VXS Gigabit serial fabric Transfer rate of 4Gb/s per board (2 full duplex Use 32ns ‘window’ to Transfer 16-bytes Each channel is 1 byte: 6 bit Sum + 2 bits for clock recovery 6 bit Sum (Truncated) Every Channel 2 bit clock encoding Allows 8ns clock recovery in 32ns ‘window’ 16 Bytes in 32ns Meets the 4Gb/s transfer bandwidth Per board Energy & Time Algorithms VME Readout 8μs ADC Sample Pipeline Global Trigger Round Trip Latency <3us CH-1 CH-16 6 Bit SumCE1CE0 CH-1 CH ns 6 Bit SumCE1CE0 18

Discussions at the May 2011 meeting,, Firmware development can begin once requirements are complete. For Spring 2012 goals: - Must create realistic work plan for firmware on FADC250, CTP and SSP - Plan must account for firmware simulation and testing Hardware Status - We have VXS crates, Crate Trigger Processors, SubSystem Processor, Trigger Interface Signal Distribution and Read-Out Controllers -Pre-production of FADC250 have been verified -Pre-production of TI-TD, SD have been verified -All boards work in concert at 200kHz trigger rate -Delivery of production FADC250 boards should arrive by Jan-12 Pre-commissioning (We are prepared for Spring,) - Hall Installation activities: =Cabling, VXS crates and readout module setup/configuration =System level testing/troubleshooting 19

Crate Trigger Processor Point of View Cluster Finding with Energy Resolution/Channel 4 x 2.5Gb/s fiber links From crates to Sub-System Processor Final Cluster Algorithm To process all calorimeter channels Cluster Energy Trigger Will have much more resolution than initial DVCS implementation Crate Trigger Cluster Combiner APD Signals Serial Stream Board 1 Board 16 Serial Stream 6 Bit SumCE1 CE0 CH-1 6 Bit SumCE1 CE0 CH ns 6 Bit SumCE1 CE0 CH-1 6 Bit SumCE1 CE0 CH ns Sub-System Processor 8Gb/s 20

Summary Pre-production Flash ADC-250 boards have been received and tested Production procurement for contract manufacturing FADC250 boards in progress Single board acceptance testing and full crate testing activities are virtually complete  These test activities has produced essential diagnostic tools for commissioning  Software (CODA) drivers and initialization routines have been developed We have the required trigger modules for a full two crate system - SD  VXS Signal Distribution board -TI  Trigger Interface board - CTP  Crate Trigger Processor board - SSP  Sub-System Processor board - Plenty of VXS crates on site We will install a single crate with sixteen FADC250 in Hall B before the end of Oct-11 Plan is to instrument the Inner Calorimeter for readout with beam in November  Parasitic DAq operation during HD-Ice experiment Spring 2012 Test Requirements, Firmware development, and installation work plans need to be detailed 21

All sorts of good stuff

Energy & Time Algorithms Event #1 Event #2 Readout FADC Trigger #1Trigger #2 8μs ADC Sample Pipeline Trigger Pulse Pre-Processing To trigger logic Trigger Input detector signal Flash ADC Implementation Sampling Flash ADC stores digitized signal in 8us memory Trigger input copies a window of the pipeline and extract pulse charge and time for readout Trigger output path contains detailed information useful for cluster finding, energy sum, etc. Hardware algorithms provide a huge data reduction by reporting only time & energy estimates for readout instead of raw samples Sample Clock Capture Window 21

Xilinx FPGA Trigger Function Pre-Processing To Crate Trigger Processor (VXS Switch Card) APD Signals Flash ADC Implementation Energy Sum Trigger Example 12 Bits CH-1 CH-16 + VXS Gigabit serial fabric Transfer rate of 4Gb/s per board (2 full duplex Transfer 16-bit Energy Sum every 4ns Energy Sum 16 Channels Energy & Time Algorithms VME Readout 8μs ADC Sample Pipeline Global Trigger Round Trip Latency <3us CH-1 CH-16 22

GlueX Level 1 Timing 20

Synchronized Multi-Crate Readout CTP #2 is also acting as an SSP (by summing the local crate + CTP#1 sum over fiber A programmable threshold is set in CTP, which creates a trigger when the global sum (6 FADC boards => 96 channels) is over threshold. Example test with a burst of 3 pulses into 16 channels across 2 crates/6 FADC modules A 2μs global sum window is recorded around the trigger to see how the trigger was formed: Example Raw Event Data for 1 FADC Channel: B. Raydo

Synchronized Multi-Crate Readout Rates FADC event synchronization has been stable for several billion ~150kHz trigger rate. Have run up to 140kHz trigger rate in raw window mode, up to 170kHz in Pulse/Time mode. Ed Jastrzembski has completed the 2eSST VME Interface on FADC allowing ~200MB/s readout B. Raydo Single Crate 12 signals distributed to four FADC250 18% Occupancy

JLab Hall B 6 GeV DVCS Trigger Implementation B. Raydo 424 channel Inner Calorimeter with APD readout APD amplified signal is split to drive Discriminator, and QADC Dual Discriminator output to drive TDC and CAEN 1495 logic modules Discriminator pulse widths are 40ns CAEN 1495 used for each quadrant trigger and for combining the quadrants to form the final trigger. CAEN 1495 boards run as 5ns state machines, and sample 424 discriminated signals every 15ns to determine hit crystals Signals that pass Threshold are used in Quadrant Cluster Detection Algorithm to locate hits on a 3 x 3 window for all adjacent crystals Final CAEN 1495 combines Quadrant information and compares against a programmable cluster count threshold to determine final trigger Beam View 10

JLab Hall B 6 GeV DVCS Trigger Implementation B. Raydo DVCS Cluster Finding Display Very successful operation of new trigger algorithm based on commercial discriminators and logic boards. FPGA firmware developed on CAEN 1495 format and quadrant plus main trigger algorithms met specified cluster algorithm requirements. Single threshold energy resolution Programmable trigger on 1-31 detected clusters Programmable cluster definitions Programmable Mask for channel inputs Fast (5ns) logic with total trigger transition delay <70ns 11