High Production Rate Tooling Case Western Reserve University David Schwam John F. Wallace Castings for Improved Defense Readiness NADCA DMC February 2008.

Slides:



Advertisements
Similar presentations
Chapter 5 Overview Casting die is the other major component
Advertisements

Metal processes Press forming Sand casting Die casting Milling
High performance cooling system of the die cast dies
EDART Balance Viewer: An Overview. 2 Balance Viewer Tool We will cover balancing a tool at startup with cavity pressure, the same with temperature sensors.
NADCA STAFF PROJECTS UPDATE Presentation for R&D Committee Meeting NADCA Headquarters, Wheeling, IL June 14, 2007.
Consulting Services to the Metals Industry Cavitation: A Brief Review of the Literature Stephen P. Midson The Midson Group, Inc.
Laser Deposited and Pre-Hardened Steel Rapid Tooling Case Western Reserve University / NADCA David Schwam.
Quanyou Zhou Case Western Reserve University
ME 330 Manufacturing Processes CASTING PROCESSES (cont.)
EFFECT OF DESIGN FACTORS ON THERMAL FATIGUE CRACKING OF DIE CASTING DIES John F. Wallace David Schwam Sebastian Birceanu Case Western Reserve University.
Heat Losses in Aluminum Holding Furnaces and Transfer Ladles D. Schwam, A.Stibich and E. Nielsen Case Western Reserve University.
Optimization of Laser Deposited Rapid Tooling D. Schwam and Y. Wang Case Western Reserve University NADCA DMC, Chicago – Feb.17,
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
The Effect of Spraying on Thermal Fatigue Cracking David Schwam, X.J. Zhu and J.F. Wallace Case Western Reserve University NADCA DMC February 20, 2007.
Effect of Cooling Line and Hardness on Thermal Fatigue Cracking Behavior John F. Wallace, David Schwam, Jain Nitin, Xiaohua Hu and Yulong Zhu Case Western.
North American Die Casting Association – 114 th Metalcasting Congress CastExpo’10, March 20-23, 2010 Orlando, Florida USA Diamond Polishing to Extend Cavity.
1 NADCA Headquarters Update Presentation for Die Materials Committee Meeting NADCA Headquarters, Wheeling, IL October 18, 2006.
1 NADCA Headquarters Update Presentation for Die Materials Committee Meeting NADCA Headquarters, Wheeling, IL February 21, 2007.
In-plant Benchmarking of Die Steels St. Clair Die Casting Case Western Reserve University Bohler Uddeholm Dunn Steel NADCA DMC Meeting February 2005.
NADCA Headquarters Update Presentation for Die Materials Committee Meeting NADCA Headquarters - Wheeling, IL February 11, 2009.
Interim Design Amy Eckerle Andrew Whittington Philip Witherspoon Team 16.
DESIGN OF EXPERIMENTS SOFTWARE INJECTION MOLDING
O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Heat Flux Measurement Adrian Sabau Metals and Ceramics Division Oak Ridge National Laboratory,
IMPROVED DIE CASTING PROCESS TO PRESERVE THE LIFE OF THE DIE CASTING DIE John F. Wallace David Schwam Nitin Jain Yulong Zhu Case Western Reserve University.
NDM Rapid Tooling Process for Aluminum and Thermoplastic Parts Paul Armstrong John Mathews.
Casting Processes Example Parts Requirements Terminology
1 NADCA Headquarters Update Presentation for Die Materials Committee Meeting NADCA, Wheeling, IL October 17, 2007.
North American Die Casting Association – 114 th Metalcasting Congress CastExpo’10, March 20-23, 2010 Orlando, Florida USA Examples of Cavitation Effect.
  Residual Stress Build Up Baseline NADCA Test Determine how quickly stress builds? What happens when tensile drops?
Factors That Affect Die Casting Die Life
Permanent Mould Casting
Manufacturing Processes
Die Materials Development Task Force Update NADCA February 21, 2007.
Castings Mining Production Supply Li Ding. Topics: Introduction Background Products – Particular Piece Project I – Time Project Project II – Casting Quenching.
Die Materials Development Task Force Case Western Reserve University June 14, 2006.
Die Materials Development Task Force NADCA Headquarters November 2, 2005.
IPD Technical Conference February 19 th 2008 Cable Disk Inspection.
METAL CASTING PROCESSES 1.Permanent Mold Casting Processes ©2007 John Wiley & Sons, Inc. M P Groover, Fundamentals of Modern Manufacturing 3/e.
Chapter 13: Multiple-Use-Mold Casting Processes
Die Materials Development Task Force NADCA Headquarters February 11, 2009.
Chapter 13 Multiple-Use-Mold Casting Processes (Part I) EIN 3390 Manufacturing Processes Summer A, 2012.
Testability of Analogue Macrocells Embedded in System-on-Chip Workshop on the Testing of High Resolution Mixed Signal Interfaces Held in conjunction with.
Injection Molding Plastics Tech 1. Composition of Plastics Lesson Essential Question: What is injection molding & how do we achieve part fabrication from.
SHAPING PROCESSES FOR PLASTICS
Magnet for ARIES-CS Magnet protection Cooling of magnet structure L. Bromberg J.H. Schultz MIT Plasma Science and Fusion Center ARIES meeting UCSD January.
Lindsay Manufacture Sourcing Project E Business Procurement.
IET 330 Industrial Design Group 4 Improving Efficiency and Productivity at SealMaster Elizabeth McClain Richard Cantrell.
©2007 John Wiley & Sons, Inc. M P Groover, Fundamentals of Modern Manufacturing 3/e MACHINING OPERATIONS AND MACHINE TOOLS 1.Machining Centers and Turning.
NSTX OH Coil Optimization Ali Zolfaghari. Optimization Parameters: Coolant channel diameter –Larger coolant diameter will lead to coil temp above 100°
Die Materials Development Task Force Oak Ridge National Laboratory June 13, 2007.
Design Guidelines Injection Moulding Engineering Design.
Boiler Energy Saver Advanced Boiler Controls. Most boiler controls at present consist of a switch!
 IN VERTICAL CENTRIFUGAL CASTING PROCESS  A PERMANENT MOLD IS ROTATED ABOUT ITS VERTICAL AXIS  THE MOLD IS SPUN AT HIGH SPEEDS ( USUALLY 50 TO 100.
# 23 SINGLE IMPLANT CASE Osteotomy Progression in Open Guide Sleeve
POLYMER MANUFACTURING PROCESSES
Engineering Materials and Processes Lecture 5 – Casting Process
4 Lobe in 5 Lobe GEROTOR (GEnerated ROTOR)
a permanent mold casting process using pressure other than gravity
Effects of Wrapping Vacuum
High Speed Machining Time is money….
The Effect of Spraying on Thermal Fatigue Cracking
Mar 5, 2003 Residual Stress Report
© 2004 – 2011 PAVAC Industries Inc. All rights reserved
Acrolab Ltd. – Copyright 2003 – Improving Processing of Rubber
Adrian Sabau Heat Flux Measurement Metals and Ceramics Division
Permanent Mold Casting
eDART™ Balance Viewer:
Die Materials Development Task Force Update
Die Materials Development Task Force
Presentation transcript:

High Production Rate Tooling Case Western Reserve University David Schwam John F. Wallace Castings for Improved Defense Readiness NADCA DMC February 2008 Chicago, IL

Objectives Production rate determines profitability of metal mold processes. Increasing production rate is therefore a high priority, boosting profits and competitiveness. A key aspect of increased production rate is shorter cycle times by faster removal of heat from the casting. Advances in modern die steels should allow more aggressive use of cooling line size and distance from the cavity. The project will evaluate effectiveness of new cooling line design and provide guidelines that account for higher strength and toughness of advanced die steels.

Needs & Benefits Benefits to: DoD –Shorter production lead times and lower cost parts for DoD weapon systems Industry –Increased profitability and competitiveness of metal mold casting industry

Process Specifications IN SIMULATION THIS OCCURS AT THE SAME TIME. Spray time is: (5) Seconds on large inserts (3) seconds on cores Some additional time: (5) seconds blow off (2) seconds wait

Cover Side Cooling Lines – V4 Cover Cores Green shows cooling line bubblers in cores. Material Water Cover cooling lines. Material - Oil Oil lines 157 ºC (300 –325 ºF) Flow rate of 0.34 m 3 /hr (1.5 gal/min) HTC of 500 W/m 2 K Water line run at 20 ºC Flow rate of 0.7 m 3 /hr. (3.0 gal / min) HTC of 5500 W/m 2 K Shot tip - HTC of W/m 2 K Shot Tip cooling Material – Water Not shown Die Steel initial temp 300 ºC (600 º F)

Ejector Side Cooling Lines V4 Green shows cooling line bubbler in ejector inserts. Material Water Ejector cooling lines. Material - Oil Ejector Runner block cooling lines. Material - Water Oil lines 157 ºC (300 –325 ºF) Flow rate of 0.34 m 3 /hr (1.5 gal/min) HTC of 500 W/m 2 K Water line run at 20 ºC Flow rate of 0.7 m 3 /hr. (3.0 gal / min) HTC of 5500 W/m 2 K Die Steel initial temp 300 ºC (600 º F)

Section Though Die Cover die cooling lines Ejector die bubbler lines. COVER SIDE EJECTOR SIDE Cover core bubbler lines. Thermocouple placed in center of the part spaced ½ way between the cores (length wise). A B 0.30” 0.50” Current Design A= 0.87” B= 0.69”

Part during solidification V4 (open die at 30 sec.) Click on image

Section though the die steel during solidification V04 Click on image

Thermocouple Result During Cycle V04 At 30 seconds thermocouple is  C

Cover Side Cooling Lines – V5 Cover Cores Green shows cooling line bubblers in cores. Material Water Cover cooling lines. Material - Water Oil lines NONE Water line run at 20 ºC Flow rate of 0.7 m 3 /hr. (3.0 gal / min) HTC of 5500 W/m 2 K Shot tip - HTC of W/m 2 K Shot Tip cooling Material – Water Not shown Die Steel initial temp 150 ºC (300 º F)

Ejector Side Cooling Lines - V5 Green shows cooling line bubbler in ejector inserts. Material Water Ejector cooling lines. Material - Water Ejector Runner block cooling lines. Material - Water Oil lines NONE Water line run at 20 ºC Flow rate of 0.7 m 3 /hr. (3.0 gal / min) HTC of 5500 W/m 2 K Die Steel initial temp 150 ºC (300 º F)

Section Though Die Cover die cooling lines Ejector die bubbler lines. COVER SIDE EJECTOR SIDE Cover core bubbler lines. Thermocouple placed in center of the part spaced ½ way between the cores (length wise). A B 0.30” 0.50” Modified Design A= 0.50” B= 0.50”

Thermocouple Result During V05 V5 was run with these conditions. Initial Die Steel initial temp 150 ºC (300 º F) A and B dimensions changed to A & B lines run with water sec

Oil (V04) vs. Water (V05) Comparison V05 with waterV04 with Oil TC =  30 secTC =  sec Predicted cycle time reduction: 6.1/30=20%

Project and Implementation Plan Fabricate and test die casting inserts with larger cooling lines and/or closer to the casting. Monitor production of parts and determine new cycle time. Evaluate effect of modified cooling line system on die life. A good baseline for the study is available from extensive database of previous production. Results will be disseminated through NADCA meetings, NADCA publications for industry, and the Metalcasting Congress

Acknowledgements AMC’s Castings for Improved Defense Readiness program is sponsored the Armaments Research and Development Engineering Center, Picatinny, NJ and Benet Laboratories, Watervliet, NY. The support of St. Clair Die Casting is gratefully acknowledged.

High Production Rate Tooling DLA - POC: Dan Gearing ) Warfighter Relevance: Increased productivity of metal mold components for weapon systems Problem: High cycle times in the production of metal mold castings Objective: Evaluate advanced cooling techniques for casting dies in order to reduce cycle times for metal mold castings Benefits: 10% reduction in cycle time associated with the production of a die casting Reduced production lead time Improved productivity Reduced operating costs Milestones / Deliverables –Revised guideline for cooling line placement Transition Plan –The revised guidelines will be added to the NADCA Die Cooling Systems Engineering Course and accompanying text Partners: –Case Western Reserve University, NADCA, St. Clair Die Casting, Premier Tool & Die Casting