CGVision with BACnet server (only for ZB-S and CG2000!) 04-04-2011 7.2.

Slides:



Advertisements
Similar presentations
EACO News Magazine 2010 September : Topics DVM Plus III up compatibility New control devices –MIM-B16 –MIM-B17 –MIM-B18 How to change option code.
Advertisements

Review of Topology and Access Techniques / Switching Concepts BSAD 141 Dave Novak Sources: Network+ Guide to Networks, Dean 2013.
Model H Free Standing Static Transfer Switch. Why choose a model H static transfer switch? Increases power availability. True solid state. Rugged, reliable.
Model W Wall Mount Static Transfer Switch. Why choose a model W static transfer switch? Increases power availability. Integrated maintenance bypass. True.
Think Automation and beyond… WindLDR 5.3 and MicroSmart Pentra Firmware 210 New Features.
Modular Capacity - Test - System CS
Uninterruptible Power Supply (UPS)
GE Power Quality EP Series UPS
Digital Adressable Lighting Interface (Basic information)
Introduction Since the beginning of the oil crises, which remarkably influenced power development programs all over the world, massive technological and.
Introduction System Schematic ~ LON-FO NC EC200 LOOPS 2-4 FIBRE OPTIC
SYMAP-BC SYMAP-BC.
Welcome to Sanforce. Introduction of Sanforce Sanforce Technology (Shenzhen) Co., Ltd is specialized in manufacturing and supply of emergency lighting.
Handheld TFTP Server with USB Andrew Pangborn Michael Nusinov RIT Computer Engineering – CE Design 03/20/2008.
William Stallings Data and Computer Communications 7 th Edition Chapter 1 Data Communications and Networks Overview.
Charge Controllers Charge Controller Features Charge Controller Types
NSE IS Page 1 CEAG V-CG-SB new DALI interface module Lighting Management System D A L I 11.2.
Moeller GmbH BU Circuit Breaker Protective note to rule DIN ISO is to be considered The new line of circuit breaker IZM ILS-P / W. Wagner Aug 03,
Overview of simple LANs. Networking basics: LAN TCP/IP is the protocol used in the Internet and dominates the internet and transport layers The subnet.
 A ‘shocking’ discovery.  In order for current to flow, the pathway must be a continuous, uninterrupted loop called a circuit.
October 20th, 2010.
The 555 as an Astable Multivibrator. Inside look at a 555 Integrated Circuit Timer.
1 Modular DC/DC Converter. 2 PSC W Standard 19“ rack 4U – 6 prewired slots (single DC input/output connection for each unit)
CLIQ power supply Integration. General view: -Schroff rack 19’’ 25U (500mm x 600mm x 1120mm). -2 fixed wheels +2 castor wheels with brake ⦰100mm.
Electrical Components.  This supplies all the power to the robot. It is a single 12 V battery. They are sealed to prevent battery acid from leaking.
SISTEMA Example One. Schneider Electric – Sistema Example 1 – June Example 1: Start/Stop Facility with Emergency Stop Device Circuit Diagram.
Electronic Component Functions What is this component doing my in electronic device?
G4 Control and Management Solution for Data- Centers and Computer Rooms.
CGVision OPC-interface for BMS A.Klepper – 01/04/11 Rev.B 6.2.
Arctic Control Introduction V 1.0. Arctic Control The Arctic Control is a device with integrated wireless communications for controlling medium-voltage.
Area of Study 2: Electricity
Document Number ETH West Diamond Avenue - Third Floor, Gaithersburg, MD Phone: (301) Fax: (301)
Uniflair pCOWeb Ethernet interface card.
 Part 1: The definitions of networking -Network -Standalone -LAN -WAN -Clients -Server -Clients/Server Networks -Peer to Peer Networks Part 1NetworkStandaloneLANWANClientsServerClients/Server.
MICE Decay Solenoid Quench Detector Trevor Hartnett Daresbury Laboratory.
5.1 BMS Basic information – Rev.A NSM-A.Klepper.
Single Loop Analogue addressable fire control Panel
Structure and system requirements (only for CG-S bus) A.Klepper – 01/04/11 Rev.A 2.1.
Schutzvermerk nach DIN 34 beachten XC200 Hardware Overview.
CGVision & Virtual machines (Virtualisation)  the new trend A.Klepper – 11/11/13 Rev.A 8.1.
Ethernet and TCP/IP (Basic information) A.Klepper – 01/04/11 Rev.A 3.1.
Summer Projects Review: Current Status. ADCS ADCS calibrated in uniform magnetic field using support hardware to mimic the computer onboard the satellite.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only Publisher The Goodheart-Willcox Co., Inc. Tinley Park, Illinois.
PRESENTATION ON MOTHERBOARD. MOTHERBOARD The motherboard is the main circuit board inside your PC. A motherboard is the central printed circuit board.
All the components of network are connected to the central device called “hub” which may be a hub, a router or a switch. There is no direct traffic between.
Case Study Computer Controlled Radiation Monitoring System
1 Autosub Electronics and Data Processing James Perrett Ocean Engineering Division Southampton Oceanography Centre
 Hubs Hubs  Bridges Bridges  Switches Switches  On-Line On-Line  Off-line Off-line  Bibliography Bibliography.
EE330 Final Project Lithium Battery Monitor Evan Adkins and Brandon Umscheid.
Fibre optic technology- CG-S Network via Fibre Optic
Full IP Solution K-12 Rev Full IP Solution K-12 Voice Communications to Students and Staff.
ing technology Example with webmodule ZB-S A.Klepper – 01/06/10 Rev
– Rev.B CGLine 400 PC-Interface A.Klepper 9.2.
Webmodule ZB-S A.Klepper – 04/04/11 Rev.A 9.1. A.Klepper – 04/04/11 Rev.A 2 Repeater Switch Repeater S S S S S S SS S R R R R S S S S S S S Switch Typical.
TA Station Power Team Meeting, 11/10/2015. Autonomous Power System – In the field Why Lithium? -Significant weight and volume savings (41.9Wh/lb vs 21.25Wh/lb)
Objectives Blue Color VLAN’s Should reach Message Server from all locations Red Color VLAN’s Should not Reach Message Server In Each L2 Switch Blue Color.
Basic informations about OPC-technology A.Klepper – 01/04/11 Rev.A 6.1.
New product introduction:
A Training Presentation On 220 KV GSS CHOMU,JAIPUR
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
Networking Components William Isakson LTEC 4550 October 7, 2012 Module 3.
Alarm units AL 175 NT and Aeon Gold For small, medium and large power range.
Serial / Ethernet Converter - IE-CS-2TX-XRS232/485
Uninterruptible Power Supply (UPS)
ABB i-bus® KNX Valve Drive Actuator VAA/A
Em4 Ethernet tutorial Remote connection.
Photovoltaic Systems Engineering Session 10
Presentation transcript:

CGVision with BACnet server (only for ZB-S and CG2000!)

A.Klepper2 LAN (RJ45) BMS with BACnet-Technology PC workplace with CGVision LAN (RJ45) Visualisation of BACnet objects (event orientated) IP-Router Config-server ZB-S CG-S Bus / FTT10A ZB-S or CG2000 Systems ZB-S IP-Router Client 1 ZB-S CG-S Bus / FTT10A ZB-S or CG2000 Systems ZB-S TCP/IP connection – CGVision via CG-S/IP-Router BACnet/IP – BMS on CGVision BMS has access to the BACnet Server ! Visualisation of BACnet Objects Schema: BACnet-connection via OPC-Client/BACnet Server OPC-Client SNVT BACnet Server  BACnet Objects Ethernet BACnet /IP TCP/IP CG2000

A.Klepper3 BACnet status informations  22 pcs. Status informations each device (ZB-S / CG2000) 1) Device in normal operation 2) Sum failure with luminaire failure 3) Sum failure without luminaire failure 4) Communication error CG-S bus 5) Device in battery mode 6) Battery duration test is activ 7) Device is blocked 8) Bettery failure (e.g. interruption) 9) Sum failure in a circuit (e.g.:fuse) 10) Mains failure (sum) 11)Deep discharge protection is activ 12)Interruption of the battery circuit 13)Charging failure battery 14)Isolation failure battery, battery + or – against protection earth 15)Rated duration test time not reached 16)General luminaire failure 17)Functionstest is activ 18)Battery voltage to high 19)Charging unit failure 20)Charging booster failure 21)Mains failure - device 22)Mains failure – sub distribution board

A.Klepper4 BACnet analogue datas and switch commandos  4 pcs. Analogue values each device 1) Battery current (Charging- discharging current) 2) Battery voltage 3) Battery temperature 4) Battery capacity  16 (ZB-S) or 30 (CG2000) pcs. switch commandos each device 1)LON-Switch 1 2)LON-Switch 2 … 16)LON-Switch 16 (ZB-S) ….. 30)LON-Switch 30 (only CG2000)  3 pcs. status informations e. device (mirror of relay outputs) 1)Emergency operation 2)Normal operation 3)Sum failure  6 pcs. control comandos each device 1)Block device 2)Release device 3)Start functiontest 4)Start battery duration test 5)Stop battery duration test 6)Quit deep discharge protection

A.Klepper5 Example of status informations via BACnet Screenshot of a BACnet OPC-Server:

A.Klepper6 Example of switch commandos via BACnet Screenshot of a BACnet OPC-Server: