Lake Park North Lion Bridge Rehabilitation Milwaukee, Wisconsin Darrell Berry, PE, SE Approaches to Historic Bridge Rehabilitation Case Study #2 1.

Slides:



Advertisements
Similar presentations
Structural Steel Construction
Advertisements

Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
Investigating Structures and Materials Structures Activity.
Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
Findings from On-site Inspection (Rt 202/US Rt 23 BRIDGE)
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Duane Hill, District Engineer
ENG-1010 Lecture 16 Bridge Design.
1 South Slough Bridge # APWA National Project of the Year Transportation Category, Projects Less Than $2 million.
Carrollton Bridge Jonathon L. Sera, P.E. Approaches to Historic Bridge Rehabilitation Case Study #3 1.
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION REPLACEMENT OF BRIDGE NO. B-0427 ON DAIRY ROAD OVER OWL BRANCH.
Bridge Engineering: Lessons from Rome to Tacoma
Bridge Projects PCEF Meeting Dover, DE Aug 25, 2009 Troy M. Jenkins, P.E. Chief Engineer Northeast Prestressed Products, LLC.
3 June Rapid Replacement of the Hood Canal Bridge Approach Spans Joseph Merth, P.E. Bridge Design Engineer 3 June 2008.
1 WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR REI SERVICES CONTRACT HBCR00A FOR COMPONENT REHABILITATION OF TWELVE BRIDGES CITYWIDE NYC DEPARTMENT OF.
Reconstruction of the Eads Bridge Highway Deck
Trestle Rebuilds The Continuing Quest to Fill the Gap
Montana Truss Rehabilitation Projects Lozeau Bridge over the Clark Fork Dearborn River High Bridge Van Buren Street over the Clark Fork.
National Best Practices Conference Covered Bridge Preservation Covered Bridges The First National Covered Bridge Conference Burlington, VT June 5-7, 2003.
Types of Bridges. Stone Arch Bridges Concrete Arch Bridges.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
MaSSENA LATERAL BRIDGE SLIDE CASE STUDY
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Hays Street Bridge Rehabilitation Patrick Sparks, P.E. Approaches to Historic Bridge Rehabilitation Case Study #1 1.
Bridges from all over the World! By: Maria Peloro & Christine Sniffen Bridges powerpoint project 2 nd period science.
1. A simple beam bridge is a rigid horizontal structure supported by two ends called abutments. Beam bridges can span up to 500 meters in length. Most.
Structural Systems CM 105. Precast Concrete Framing Offer exceptional strength and resistance to seismic stresses and high degree of fire safety Concrete.
Shear Repair of P/C Box Beams using CFRP Fabric KYDOT July 27, 2011 Salt Lake City, Utah Kentucky Transportation Cabinet Kentucky Transportation Center.
بسم الله الرحمن الرحيم Islamic university – Gaza. Faculty of engineering. Civil Engineering Groups: Ala`a Dababish Mousa Shaheen Supervisor: Dr. Basil.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Shearer’s Bridge. Bridge Construction  Shearer's Bridge was originally built in 1847 over Chiques Creek at a cost of about $600. The bridge was.
Approaches to Historic Bridge Rehabilitation Case Study #4
Introduction to a pit installation
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.
Our Trail Journey So Far and The Adventure Ahead.
WisDOT - Bureau of Structures Brandan Burger.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
VT 100 over the Mad River Bridge Replacement July 13, 2015.
Engineers and bridges. Just the facts The four main factors are used in describing a bridge. By combining these terms one may give a general description.
Advantages of Prestressed Concrete Bridges. Owners and designers have long recognized the low initial cost, low maintenance needs and long life expectancy.
College of Engineering, EEIC Ethical Dilemmas Ethical dilemmas arise when there are multiple Stakeholders with conflicting interests. Good ethical practice.
Stenton Avenue Masonry Arch Rehabilitation Approaches to Historic Bridge Rehabilitation Case Study #1 Michael J. Cuddy, P.E. Principal Kara Russell Cultural.
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
Construction of the Route 460 Connector Phase 1 Breaks, Virginia Timothy Barry, PE Robert Bennett, EI June 10-13, 2012 Pittsburgh, PA.
Approaches to Historic Bridge Rehabilitation Case Study #2
P3 (Preventive Pile Protection)
Posting Bridges for Specialized Single-Unit Trucks
Commercial Floor Systems
High Bridge Re-Deck Project
Approaches to Historic Bridge Rehabilitation Case Study #3
CONCRETE PROTECTION MATERIALS & TECHNIQUES
Structural drawing.
Residential Wall Systems
2016 FHWA National Hydraulic Engineers Conference
Blatnik Bridge Management Study
The Historic Bridge Project Development Process.
Types of Bridges.
Bridge Engineering: Lessons from Rome to Tacoma
Structural Drawing Chapter 19.
WE-WC Almaty – Khorgos Road Section Materials prepared in %
Commercial Floor Systems
Residential Wall Systems
Commercial Floor Systems
Historical Life Cycle Costs of Steel & Concrete Girder Bridges
Central Park New York.
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

Lake Park North Lion Bridge Rehabilitation Milwaukee, Wisconsin Darrell Berry, PE, SE Approaches to Historic Bridge Rehabilitation Case Study #2 1

Lake Park North Lion Bridge Steel arch with concrete deck Originally built in 1896, narrowed in the 1960s Length: 90 feet; Width: 10 feet clear Single span steel arch Design Live Load: 85 psf or 15,000 lb. vehicle Case Study #2 North Lion Bridge Lake Michigan 2 Milwaukee, Wisconsin

Lake Park North Lion Bridge Rehabilitation Owner: Milwaukee County Department of Parks, Recreation and Culture Design Engineer: Mead & Hunt, Inc. General Contractor: Vista Design & Construction, LLC Project Cost: $1.6 Million Project dates: started Feb 2009, completed Oct Case Study #2 3

Significant Issues Associated With Project Case Study # Arch Structure 2. Railing 3. Stone Facing on Abutments 4. Lion Statues

1. Steel arch structure, including bearings & concrete deck 5

How Arch Issue Was Resolved Case Study #2 6 Deteriorated structural steel was removed and replaced, with details matching original. Bearings were removed and replaced. Concrete deck was removed and replaced Precast concrete panels Cast-in-place concrete surface

2. Metal Railings Case Study #2 7

How Railing Issue Was Resolved Case Study #2 Railings were removed from bridge and delivered to a fabrication shop. New finials were added and made larger to fill the openings. Edges were welded to uprights. Railings were painted and reinstalled. 8

3. Stone facing on abutments Case Study #2 9

How Stone Facing Issue Was Resolved Case Study #2 Missing stones were replaced with matching stones. Entire abutments were tuckpointed, with color to match existing. All surfaces were gently cleaned to remove moss and dirt. 10

4. Lion Statues Case Study #2 11

How Lion Statue Issue Was Resolved Case Study #2 110 year old statues were in good condition with minimal graffiti. Cleaning used a gentle process with water and light power wash. Digital 3D image will be prepared in near future. 12

Lessons Learned/Conclusions Rehabilitated bridge is part of beloved, historic park. Bridge and lion statues are enduring symbols of a celebrated Milwaukee landmark. Cooperation and collaboration between all parties lead to an extremely successful, award-winning project. Case Study #2 13