ولقد خلقنا السماوات والأرض وما بينهما في ستة أيام وما مسنا من لغوب (سورة ق )

Slides:



Advertisements
Similar presentations
FACTORS AFFECTING CONSTRUCTION COSTS IN SAUDI ARABIA By Yaser Abdulla Al-Juwairah Presented by Shaikh Imran Abdul Qayyum Gani.
Advertisements

Central Bureau of Statistics Environment Protection Expenditure in Israel Dr. Moshe Yanai Yaniv Sharabi Agriculture and Environments Sector.
King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management Presented to: Dr. Sadi Assaf CEM 520 Class Causes.
Higher College of Technology Department of Engineering General Structure of Final Year Project (B-Tech Level) Ahmed.S.Al.Shahri ahmed
Summary of “Factors Affecting Construction Practices in Makkah, Saudi Arabia” Written by: Sami Barhamain October 1986 (CEM 520) Presented by: Ehab A. Qahwash.
King Fahd University Of Petroleum and Minerals Construction Engineering and Management CEM520 Construction Contracting and Administration Term Paper Contract.
Joint Ventures in Construction Firms in Saudi Arabia By Kamal Khalil Khairaddin Abbasi A thesis paper summary Summarized by Mahdi Fida Al-Adel.
Presentation for Thesis of Master Degree Done by Ali Abdullah Al Salman CEM – 520 Term Project (Paper Presentation) Assessments of Risk Management Perception&
Factors Governing Housing Construction Costs in Saudi Arabia Abdelrahman Al-Gwaiz Kamal Al Dihan Faisal Al Ankary.
Evaluation of Consultant Performance Done by Abdullah Abuzaid Humod Al-Shammari Mohammed Al-Qahtani Mohammed Al-Saheel CEM-520 Done for Dr. Sadi Assaf.
KING FAHD UNIVERSITY OF PETROLEUM AND MINERALS COLLEGE OF ENVIRONMENTAL DESIGN Dhahran, Saudi Arabia THERMAL AND ECONOMIC PERFORMANCE OF INSULATION FOR.
King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management CEM Instructor: Dr. Soliman Al-Mohawis Important.
By Dr. Sadi A. Assaf, Dr. Abdul Mohsin Al-Hammad, Dr. M. Osama Jannadi, Mr. Sami Abu Saad By Dr. Sadi A. Assaf, Dr. Abdul Mohsin Al-Hammad, Dr. M. Osama.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
1 KING FAHAD UNIVERSITY OF PETROLEUM & MINERALS College Of Environmental Design Construction Engineering & Management Department CEM 515- Quality managenet.
1 FACTORS AFFECTING FACILITY MAINTENANCE MANAGEMENT AUDTING IN SAUDI ARABIA BY Al-Hammad,A. and AL-Zahrani A., College of Environmental Design, King Fahd.
COE 485 Senior Design Project Group # 5 Week 8 Term 042 King Fahd University of Petroleum and Minerals College of Computer Science and Engineering Computer.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
Quality Function Deployment for Curriculum Design: A Framework
In the Name of God Most Greasiest the Most Merciful.
STATISTICS Statistics refers to a set of techniques that are used to transform raw data into useful information.
Statistical Decision-Making Process: Decision Problem Statistical Plan Data Description and Summary Analysis and Conclusions Testing Validity of Results.
TOOL TO DESIGN FOR CONSTRUCTION WORKER SAFETY An Article Written by Gambatese, Hinze and Haas 1997.
RESEARCH IN BUSINESS Presented by: Dr. Salem M. Al-Ghamdi Associate Professor of Management King Fahd University of Petroleum and Minerals.
Cost Implications of Architectural Design Variables Ahmed S. Al Zahrani December 2005 King Fahd University of Petroleum & Minerals Department of Construction.
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS COLLEDGE OF GRADUATE STUDIES CONSTRUCTION ENGINEERING AND MANAGEMENT For Dr. Sadi A. Assaf A Conceptual Model.
Abdallah M. Al-Mahasheer
1 CONTRACTORS QUALITY SYSTEMS ASSESSMENT TO ISO 9000 By: Tawfiq Al-Atiq December 1996 Presented to: Dr. Sadi Assaf & CEM-520 Class Presented by: Eid S.
King Fahd University of Petroleum & Minerals Department of Management and Marketing MKT 345 Marketing Research Dr. Alhassan G. Abdul-Muhmin Secondary Data.
1 Construction Claims in Residential Houses in Saudi Arabia Presented by Adel Al Rabee.
Factors affecting contractors’ risk attitudes in construction projects: Case study from China 박병권.
THE APPLICATION OF VALUE ENGINEERING ON PUBLIC CONSTRUCTION PROJECTS IN SAUDI ARABIA BY: Mohammad Ali Husain Al-Sughaiyer Supervised By: Dr. Saadi Assaf.
Chapter 33 Conducting Marketing Research. The Marketing Research Process 1. Define the Problem 2. Obtaining Data 3. Analyze Data 4. Rec. Solutions 5.
THE SOCIAL IMPACTS OF TOURISM ON LOCAL COMMUNITY’S QUALITY OF LIFE Ivana Pavlić, Ana Portolan & Barbara Puh University of Dubrovnik, Department of Economics.
Problem (Question) (Difficulty). Decisions Problem (Question) (Difficulty) Decisions Research.
IMPLEMENTATION OF QUALITY CONTROL FOR CUSTOMER SATISFACTION Introduction Problem statement Quality control that has been set by the company less applied.
المؤتمر الهندسي الدولي الثاني للإعمار والتنمية الجامعة الإسلامية- غزة The 2 nd Inter. Engineering Conference on Construction and Development Islamic University.
1 Using Focus Groups to Improve Response in Monthly Surveys Author: Lisa Houlihan U.S. Census Bureau Presenter: Anne Russell U.S. Census Bureau.
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS DHAHRAN, SAUDI ARABIA ARE-512 Life Cycle Costing – Cost Data Bank For By G. C. SOFAT S.K. TYAGI Presented.
1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University.
THE STRUCTURE OF THE PROJECT. The Math Studies teacher guides and supervises the candidates. The Math Studies teacher guides and supervises the candidates.
Joint Venture in construction company in West Bank.
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
An-Najah National University Faculty Of Engineering Industrial Engineering Department Implementation Of Quality Function Deployment On Engineering Faculty.
CMSC Initiatives Update WTBA & WisDOT Contractor Engineer Conference January 21, 2010.
LINTON UNIVERSITY COLLEGE SCHOOL OF CIVIL ENGINEERING Dr. Deepak T. J. CE – 2211 PROFESSIONAL SKILLS Review: Skills and Experience.
College of Environment Design Construction Engineering Technology Assessment of Constructability Practice Among General Contractors in The Eastern Province.
TQM Study For Telecom Towers King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality.
King Fahd University of Petroleum and Minerals
LOGO Mamdouh Abdel Aziz Refaiy Dr. Associate Professor, Business Administration Department, Faculty of Commerce, Ain Shams University, Cairo, Egypt. Evaluating.
E - BOOK FOR COLLEGE ALGEBRA King Fahd University of Petroleum & Minerals 3.3 E - BOOK FOR COLLEGE ALGEBRA King Fahd University of Petroleum & Minerals.
Research Methodology For AEP Assoc. Prof. Dr. Nguyen Thi Tuyet Mai HÀ NỘI 12/2015.
King Fahd University of Petroleum & Minerals College of Computer Sciences & Engineering Computer Science Department Summer Training Presentation 2 July.
CEM – 599 GRADUATE SEMINAR 1 CONSTRUCTION ENGINEERING & MANAGEMENT DEPT. CEM 599 RESEARCH METHODS IN CONSTRUCTION RESEARCH METHODS IN CONSTRUCTIONBY RIZWAN.
Research Methodology II Term review. Theoretical framework  What is meant by a theory? It is a set of interrelated constructs, definitions and propositions.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
Summary of presentation Introduction of the dissertation.
Cost Overrun in Construction Projects Supervisor : Eng.Reema Nassar.
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
Under supervision of: Eng. Reema Nassar
in Construction Industry
Causes Of Contractors’ Failure In West Bank
Supervisor: Eng. Mohammad abu neama
Title of Paper / Dissertation
Factors Affecting Bid/No Bid Decision Making IN The West Bank
‘ Causes of Delay During Construction Phase at Palestine ’
CEM 515 Done by: Abdulkarim Sulais
CIM Cooperative Work Program (COOP)
A Transaction Cost Approach to Make-or-Buy Decisions
Presentation transcript:

ولقد خلقنا السماوات والأرض وما بينهما في ستة أيام وما مسنا من لغوب (سورة ق )

King Fahd University of Petroleum and Minerals College of Environmental Design Department of Construction Engineering and Management CEM:520: CONSTRUCTION CONTRACTING Term Paper Presentation FACTORS AFFECTING CONTRACTOR PERFORMANCE Presented to:Presented by: Mohmead Fouad I.D. # Date: Dec Dr. Saad Assaf

Outline  Objective of the study  Study Limitations  Research Methodology  Survey Questionnaire  Results and Analysis  Study Conclusion  Recommendations

Objective of the study  To explore the performance of the building construction contractors  Find out factors affecting their performance  Check the importance of each factor  To provide suggested solutions to high performance and quality

Study Limitations  Building Construction Contractors only  Location of business in Jubail Industrial City  Chose 36 contractor executed between 1982 to 1988 by a Saudi or joint venture firm

Research Methodology  Literature Review  Development of initial questionnaire  Collecting Data from contractor performance evaluation reports  Development of final questionnaire  Questionnaire Survey plus interviews  Data Collection  Data analysis  Conclusion and Recommendations

Survey Questionnaire  Statistical Sample: 32 respondents from contractors  “Analysis Statically using the SAS mainframe computer package

Results and Analysis  Factors Affecting Performance Samples:  General Requirements  Site Work  Materials  Specifications  Construction Divisions (Elec., Mech., ect.)  Results analyzed using different methodology techniques

Study Conclusion  Big size contractor have higher performance than the small one  Design and construct type of contract have higher contract performance than construct type only  Contracts with change order tend to have a higher contractor performance  Higher monetary value contract have higher contractor performance

Study Recommendation  Contractors Classifications have to be study before awarding contract  Contracts should be clear and straight  More supervision have to be made  Design and construct contracts are recommended for building construction contracts

Thanks… The End