Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.

Slides:



Advertisements
Similar presentations
SPP Fields Antenna TRL6 Review Pre-PDR Mechanical Design Jeremy McCauley SSL UCB 7/18/2013 Current Configuration: SPP Spacecraft FIELDS, SPP-ANT-MEC-000.
Advertisements

SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Observatory - Overview July 13 & 14, 2010MMS I&T Pre-CDR Peer Review 1 Single Observatory Stowed.
SPP FIELDS V5 Antenna Mechanical Peer Review David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
SPP FIELDS V5 Antenna Mechanical Peer Review Draft 2 David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
Stuart D. BaleFIELDS iCDR – Science Requirements Solar Probe Plus FIELDS Instrument CDR Science and Instrument Overview Science Requirements Stuart D.
The FIELDS Instrument Suite Stuart D
SPP FIELDS DFB Quarterly June 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board 1.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
Solar Probe Plus FIELDS Quarterly Management Nov 15, 2012.
MonsonPeer Review – 24 October 2013 SPP/FIELDS LNPS PEER REVIEW Steven Monson University of Minnesota 1.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
MonsonPeer Review – 5 December 2014 SPP/FIELDS LNPS PEER REVIEW Steven Monson University of Minnesota 1.
MERMAG-M/MGF MGF-OS MGF-IS MAST-MGF MAST-SC PWI-SC Credit : RISH, Kyoto Univ.
D. GordonFIELDS iCDR – DCB Solar Probe Plus FIELDS Instrument CDR DCB Dorothy Gordon Space Sciences Lab, UC Berkeley 1.
ESA EJSM/JGO Radio & Plasma Wave Instrument (RPWI) Warsaw meeting Lennart Åhlén.
Stuart D. BaleFIELDS iPDR – Science Requirements Solar Probe Plus FIELDS Instrument PDR Science and Instrument Overview Science Requirements Stuart D.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
1 Dec SPP-Fields Antenna Electronics Board (AEB) Concept Status Report J.W.Bonnell, S. Harris, S. Heavner Space Sciences Laboratory UC Berkeley.
GoetzFIELDS Quarterly – 18 July 2013 SPP/FIELDS Modes and Operations Stuart D. Bale, Keith Goetz 18 July
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager:
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
Solar Probe Plus FIELDS Team Meeting Management Items 08/05/2014.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
Solar Probe Plus FIELDS DFB Report Quarterly Management July 18, 2013.
Main Electronics Package
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
SPP FIELDS DFB Quarterly June 16, 2015 Solar Probe Plus FIELDS Instrument Quarterly Q Digital Fields Board (DFB) 1.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL System Engineer David Curtis, SSL STEIN.
Jun 4, SPP FIELDS Updated block diagrams Fault Tolerant Design.
Solar Probe Plus FIELDS Quarterly Management Feb 23, /23/2015FIELDS Quarterly Management1.
TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley.
Dec 1, FIELDS Top Level Requirements Review S. Harris (UCB)
FIELDS iCDR – RFS Analog Dennis Seitz 1 Solar Probe Plus FIELDS Instrument CDR RFS Analog Dennis N. Seitz UC Berkeley SSL
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
Stuart D. BaleFIELDS SOC CDR – Science Requirements Solar Probe Plus FIELDS SOC CDR Science and Instrument Overview Science Requirements Stuart D. Bale.
March 28, 2011 MAVEN SWEA instrument Pre-CDR Peer IRAP March 28-29, IRAP Management MAVEN SWEA Instrument Pre-CDR Peer Review IRAP, March.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
Solar Probe Plus FIELDS Team Meeting Management 7/07/2015.
Solar Probe Plus FIELDS Instrument PDR Management Peter Harvey, PM Lindsey Hayes, DPM University of California
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
Timothy Edward Quinn FIELDS iPDR – GSE Solar Probe Plus FIELDS Instrument PDR GSE Timothy Edward Quinn UCB 1.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
Status 1 5/07/08 UCB RBSP EFW STATUS 5/07/08. Status 2 5/07/08 UCB Agenda Project Stuff Monthly Report Submitted Schedule Submitted  Milestones Upcoming.
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
SPF MAG Quarterly Report – Feb 2015
SPP FIELDS Preamplifier
Solar Probe Plus FIELDS
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Solar Probe Plus – FIELDS Main Electronics Package
Electric Field and Waves Instrument (EFW)
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
Solar Probe Plus FIELDS Main Electronics Package iPER EMC Feb 2, 2017
Solar Probe Plus FIELDS Instrument PSR - MEP Introduction
Instrument Overview Larry Springer HMI Program Manager
Presentation transcript:

Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012

Telecom 2 9/17/2012 SPP/FIELDS Monthly Report Review Schedule Review Financial Report Review EVM Inputs and Variance Explanations MONTHLY MGMT AGENDA

Telecom 3 9/17/2012 SPP/FIELDS FIELDS Overview Observations Measure electric and magnetic fields and waves Measure poynting flux, absolute plasma density and electron temperature, S/C floating potential and density fluctuations, and radio emissions Measurements Magnetic field vectorsDC-50kHz Electric field vectorsDC-1MHz Plasma waves5Hz to 1MHz Quasi-thermal Noise10 kHz to 2.5MHz Radio emissions1MHz to 16MHz 3 Milestones (Phase B) FIELDS Specification Dev (L2)Oct, 2012 MEP Specification Dev (L3)Jan, 2013 ICU & AEB Detailed DsnSep 2013 HFR/TNR Detailed DsnOct 2013 FPGA ReviewsOct 2013 IPDRNov 2013 Project Status Update Phase B contract signed 7/24/12 Funding Definitized Contract Value: $13.7 M Definitized Funding Value:$ 3.6 M End Date:3/14/2013 Current EAC:$13.7 M UCB E-Field Antenna LPC2E Search-Coil Magnetometer (SCM) GSFC Fluxgate Magnetometer (MAG)

Telecom 4 9/17/2012 SPP/FIELDS FIELDS Overview 4 E-Field Antennas 2.3 m Tip-to-Hinge Preamps located at Hinge Mag Boom MAG (Inboard) MAG (Outboard) SCM Main Electronics Package (MEP) Main Electronics Package includes: Thermal Noise Receiver / High Frequency Receiver (TNR/HFR) - LESIA Time Domain Sampler (TDS) - UMinn Digital Fields Board (DFB) - LASP Antenna Electronics Board (AEB) – UCB MAG Electronics (MAG) – GSFC Instrument Control Unit (ICU) – UCB Low Noise Power Supply (LNPS) - UMinn

Telecom 5 9/17/2012 SPP/FIELDS FIELDs Organization 5

Telecom 6 9/17/2012 SPP/FIELDS FIELDs Technical Status Antenna Technology Development Basic Concept Complete Materials Tests in Niobium C-103 Tantalum-Tungsten Ta-W Thermal Modeling Expected 10/15/12 Will need Preamp details soon Thermal Test Model Design in progress Fabrication expect by end of year PROMES tests in Winter 2013 Deployment Brake Prototype #1 Complete Prototype #2 in fab 6

Telecom 7 9/17/2012 SPP/FIELDS Main Electronics Package Development Basic Interface Concept with Spacecraft Complete Internal Electrical Concept Complete Working on Box Mechanical Specifications Basic Concept Uses Board Slices (similar to MAVEN) Board Size Must be Common Among all Boards FIELDS boards have THEMIS, MAVEN and STEREO heritage Mass Estimate Used THEMIS-sized Boards (6”x9”) AEB (THEMIS) no issue ICU (MAVEN) adding memory but will fit in 6x9” format. DFB (THEMIS) has to add circuitry and needs smaller A/D’s to fit. The smaller A/Ds need radiation testing (in the works at LASP). MAG (MAVEN) is requesting a separate slice for heater circuits and more filtering than on MAVEN. Would prefer MAVEN footprint. Digital Spectrometer would be a single slice, replacing HFR-TNR. There is a group working on these specifications. FIELDS Technical Status

Telecom 8 9/17/2012 SPP/FIELDS Electric Field Antennae Schedule Materials Materials testing at GRC has shown mass increases in the samples Concern that oxidation will change optical properties, we have repeated tests with “O2 getters” These did not solve the problem. Added a second candidate material Ta-W to test Thermal Test Model (at PROMES) Thermal modeling showed initial concept of TTM would not fully demonstrate the design. Revised TMM design in progress, fabrication by year end. Next PROMES opportunity is Winter 2013 (not Sept 2012) FIELDS Schedule

Telecom 9 9/17/2012 SPP/FIELDS Main Electronics Package Schedule Very high-level schedule of MEP effort currently in master schedule Details to be linked in as the detailed specification is finished (i.e. Will the board size, shape, connectors change, etc?) ICU design will have priority as other board designers will need “ICU simulators” for their test apparatus. ICU test will require S/C simulator (GSEOS) as in RBSP. FIELDs ICD will be needed for S/C simulator. (LNPS, TDS, and DFB have nearly the same schedules at this point.) FIELDS Schedule

Telecom 10 9/17/2012 SPP/FIELDS MAG Schedule Supported MAG-SCM tests Final report just delivered last week GSFC has demonstrated 256 samples/sec operation Designed non-magnetic TV chamber for sensor life tests Considering materials changes in sensor FIELDS Schedule

Telecom 11 9/17/2012 SPP/FIELDS SCM Schedule Supported MAG- SCM compatibility tests Built / Tested dual gain model with acceptable results for SPP Developed SCM specification FIELDS Schedule

Telecom 12 9/17/2012 SPP/FIELDS FIELDS Risk Summary 1)F14 - Phase B Schedule Risk has been retired. This risk turned into reality as the APL-to-UCB contract took until the end of the funded period and UCB watched all its subcontracts fall out of contract. According to our Sponsored Projects Office, No-Cost-Extensions were offered to all subcontractors. We expect to get back on schedule in the coming period. 2)F3 - Foreign Funding (commitment): Continuing as our top risk, we are expecting to hear more next month from our French colleagues about possible technical working arrangements for a joint project.

Telecom 13 9/17/2012 SPP/FIELDS FIELDS Cost

Telecom 14 9/17/2012 SPP/FIELDS Subcontracts All Subcontracts are currently on No-Cost Extensions APL-UCB contract modifications have historically occurred too late for UCB to keep subcontractors continuously funded.

Telecom 15 9/17/2012 SPP/FIELDS Technical  HFR/TNR funding issues. Replacement with UCB-Digital Receiver  Continuing EMC program (needed for final specification)  Vector Electric Field Fidelity (with S/C Electrostatics) Cost  No Issues Schedule  Fall 2012 Manpower issues. RBSP launch, CINEMA launch, FOXSI launch and MAVEN delivery has depleted engineering and management resources. FIELDS Issues & Concerns