CSA WG Meeting 24 April 2009 Page 1 Colorado Springs CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited

Slides:



Advertisements
Similar presentations
CSTS Service Instance Identification Summary of CSTS Discussions on M.Götzelmann.
Advertisements

1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
1 24 April 2009 SMWG SMWG Closing Report Colorado Springs, Colorado, USA 24 April 2009.
SGIA-BOF-kickoff.ppt - CCSDS SGIA - Space to Ground Interoperability Architecture (SGIA) Birds of a Feather (BOF) Out Brief September 16, 2005 Clayton.
SLE Toolkit 18 April 2005 Athens, Greece CSTS - 1 CSTS Charter & SLE Toolkit Status 11 April 2005 Y.Doat.
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
ESTEC, Noordwijk, Netherlands 27 Oct 2009 SERVICE ARCHITECTURE FOR SPACE -- BOF 1.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
CSSM Meeting Summary Spring 2013 Meetings 15 – 18 April E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Bordeaux, France.
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
31 st October – 4 th November 2011 Fall 2011 Meeting Agenda Boulder, Colorado, USA SOIS Application Support Services WG Conclusions & Actions.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
CEOS Strategy for Carbon Observations from Space – Report of Implementation Study Team Stephen Briggs ESA CEOS Plenary, Agenda Item 21 Tromsø, Norway
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
Security WG Status Review ESA European Space Operations Centre Darmstadt, Germany 16 April 2012 Howard Weiss NASA/JPL/SPARTA
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October, 2009 ESTEC, The Netherlands Takahiro Yamada, JAXA/ISAS.
Post-WGD 4 Next steps, processes...towards COP-8 UNECE Industrial Accidents Convention 4th meeting of WGD, 28–29 April 2014.
1 April 2009 CSTS WG: CSTS WG: report to the CSS Area Colorado Springs 25 April 2009 Yves Doat.
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
CCSDS MOIMS Falls Meeting 2007 – Colorado Springs - June 2006 SAFE Status Progress status & f Stéphane Mbaye
DTS & CSTS REPORT 15 April 2005 Athens, Greece CSTS - 1 DTS & CSTS WG STATUS REPORT, End of Spring 2005 Meeting Yves Doat Chairman 15 April 2005.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
Security WG: Status Briefing Noordwijkerhout, The Netherlands) 31 March 2014 Howard Weiss NASA/JPL/PARSONS
2009 Spring CCSDS meeting ( Colorado Springs,USA ) SMWG 1 Validation Test Coordination for the SCCS Service Management (R-3.4) 20. April 2009 JAXA YAGI.
NASA/NSSDC Report to MOIMS DAI/IPR Plenary 16 January 2007 Colorado Springs, USA.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
CCSDS Engineering Steering Group: Report to the CCSDS Management Council CMC Meeting May 2004 CSA, Montreal, Canada Adrian J. Hooke Chairman, CESG.
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
Navigation WG Report D. Berry NASA J. Fertig ESA.
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
SMWG-JAXA April JAXA SLE-SM/UM Prototype Implementation Status Nobuhiro Yagi 25.April.2007 Telecon.
1 IFAD consideration of a Code of Conduct for Executive Board Representatives Historical Background Presentation to an Informal Seminar of the Executive.
NASA MSFC Engineering Directorate Mission Operations Laboratory Page 1 Bob SANA End of Meeting Summary.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
1 Space Communications Cross Support Architecture WG: Charter and Work Plan April, 2009 Colorado Springs, CO, USA Takahiro Yamada, JAXA/ISAS.
CSA WG Meeting 17 May 2011 Page 1 Berlin, Germany CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
Spacecraft Onboard Interface Services Application Support Services Working Group (SOIS-APP WG) CCSDS Spring 2013 Meeting.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Fall 2008 Meeting Takahiro Yamada (JAXA/ISAS) 17 October.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan May 2010 Portsmouth, Virginia, USA Takahiro Yamada, JAXA/ISAS.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
Page 1 Meeting Planning PROJECTION OF FUTURE HOSTING DATES DateWG/CMC? HostLocation/Date March 08 (Spring)WG NASACrystal City, VA, March COMPLETED.
Security WG: Report of the Spring 2004 Meeting May 13, 2004 Howard Weiss, NASA/JPL/SPARTA.
CSA WG Service Agreement Status
NASA/NSSDC Report to MOIMS DAI/IPR Plenary
SPACE INTERNETWORKING SERVICES (SIS) AREA
Systems Architecture WG: Charter and Work Plan
Cross Support Architecture WG: Charter and Work Plan
CWE File Structure.
Delta-DOR WG: Report of the Fall 2010 Meeting
CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code 450/Code 572 April 2003.
NDIA Earned Value Management Application Guide
Common Understanding Way forward
Stephen Briggs European Space Agency SIT Workshop Agenda Item #13
Strategic Coordination Group 2007 Reporting Guidance on Monitoring
Presentation transcript:

CSA WG Meeting 24 April 2009 Page 1 Colorado Springs CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited

CSA WG Meeting 24 April 2009 Page 2 Colorado Springs CSA Charter Requirement Development of a recommended standard for service agreements that: 1)defines template(s) of service agreement contents, including a formal schema, 2)offers two or more examples of an instantiated service agreement based on the template and two or more current inter-agency service agreements, 3)identifies mechanism(s) for service agreement maintenance.

CSA WG Meeting 24 April 2009 Page 3 Colorado Springs Overall Approach This addresses Item 1 This will address Item 3 Item 2 is being addressed initially by comparison with an existing JPL ‘Draft Service Agreement’

CSA WG Meeting 24 April 2009 Page 4 Colorado Springs Current Status Section 3 contains a summary of the Service Agreement process Section 4 contains all the parameters needed to execute an SLE service (RAF, RCF, CLTU) See Service Catalog

CSA WG Meeting 24 April 2009 Page 5 Colorado Springs Some Issues Terminology needs to be agreed Service Agreement process needs to be agreed Existing agency practices need to be incorporated Further services need to be added e.g. tracking Additional services will need to be identified as bilaterally-agreed until the services are defined by the CSTS and SM Working Groups Examples of instantiated service agreements will be based on existing ESA, NASA documents

CSA WG Meeting 24 April 2009 Page 6 Colorado Springs Next Steps Receive comments from CSA31 May 2009 Draft sections 2 and 531 May 2009 Revise entire document 30 June 2009 Next draft should include parameters extracted from NASA, ESA and other agency documents Further iterations should lead to Red 1 this fall